Docket Log

Docket: 09-AFC-04C
Project Title: Oakley Genrating Station COMPLIANCE
Generated On: 4/26/2024 4:08:50 PM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
2294958/20/2019 Notice of Decision For Permanent Facility Closure

Compliance
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2260068/3/2018 Apprendix B - DPR 523 OGS-1
Appendix B to OGS Final Closure Plan
2 page(s)
 CEC/Drew BohanDayZenLLC
22562310/30/2018 Compliance Docketing Policy

3 page(s)
 Plant ManagerCalifornia Energy Commission
2246609/7/2018 Order Approving Facility Closure Plan and Request for License Termination

3 page(s)
 CEC/DocketsCalifornia Energy Commission
2245568/21/2018 Exisiting Storm Drain Facilities

Soil and Water
1 page(s)
 CEC/DocketsRene Urbina
2244658/10/2018 Staff Analysis of Facility Closure Plan

Compliance
8 page(s)
 Interested PartiesCalifornia Energy Commission
2243848/3/2018 Repeated Application Request For Confidentiality - DPR 523 OGS-1
Confidentiality for Cultural Resources - Appendix B DPR 523-OGS-1 to Final Closure Plan
2 page(s)
 CEC/Drew BohanDayZenLLC
2243087/26/2018 Addendum to BIO-6 (Biological Resources Construction Completion Report) OGS Designated Biologist Technical Memorandum.
Biological Resources Construction Completion Memo prepared by the Designated Biologist at the Oakley Generating Station.
Compliance
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2243077/26/2018 BIO-6 Biological Resources Construction Completion Report
BIO-6: Biological Resources Construction Completion Report prepared Contra Costa Generating Station (CCGS), the owner of Oakley Generating Station (OGS) to ensure final compliance with the Condition of Certification BIO-6 in the Commission Decision. This report is submitted in conjunction with the Facility Closure Plan filed with the California Energy Commission in July 2018.
Compliance
11 page(s)
 CEC/Docket UnitCCGS LLC
2242957/25/2018 Notice of Receipt for Oakley Generating Station Facility Closure Plan
The Facility Closure Plan was submitted pursuant to Condition of Certification COMPLIANCE-11 and provides an analysis of the potential environmental impacts of the proposed activities.
Compliance
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2242917/25/2018 CCGS Request For License Termination

Compliance
1 page(s)
 CEC/DocketsDayZenLLC
2242587/23/2018 Oakley Generating Station Facility Closure Plan
This Facility Closure Plan was submitted to the California Energy Commission pursuant to Condition of Certification CLOSURE-11 and describes the nature of the closure (temporary, permanent) and plans for continued use of facility land and equipment. The closure plan provides an analysis of the potential environmental impacts of the proposed activities.
42 page(s)
 CEC/Docket UnitCCGS LLC
2127448/11/2016 Notice of Determination- Petition to Amend Oakley Generating Station
The petition requests changes to the location of the generator tie-line conductor support tower 2/21 and a corresponding modification to the generator tie-line alignment between tower 2/21 and tower 2/22
Compliance
6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2118086/14/2016 Notice of Receipt
Petition to Amend Oakley Generating Station (09-AFC-04C)
2 page(s)
  California Energy Commission
2118076/14/2016 Notice of Receipt of Petition to Amend Oakley Generating Station
The petition requests changes to the location of the generator tie-line conductor support tower 2/21 and a corresponding modification to the generator tie-line alignment between tower 2/21 and tower 2/22 (TN 211413).
Compliance
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2114135/9/2016 Petition for Project Modification- Support Tower Relocation
The requested modification is a minor change in the location of generator tie-line conductor support tower 2/21 and a corresponding minor modification to the generator tie-line alignment between tower 2/21 and tower 2/22. There are corresponding minor changes in the locations and shapes of the pull and work area sites that are located outside of the generator tie-line right-of-way and result in both deletions and additions of work areas. These changes result from minor refinements and additions to the generator tieline design and construction plan being finalized by PG&E. They are needed because the previously proposed location of the tower is no longer available for use.
Compliance
14 page(s)
 California Energy CommissionCalifornia Energy Commission
6332010/6/2011 Notice of Determination - Petition to Include Additional Laydown

3 page(s)
 CEC/Dockets UnitCEC/C.Marxen
6263710/25/2011 Staff Approved Project Modification Additional Laydown, Parking and Staging Area

1 page(s)
 Contra Costa Generating Station LLC/ G. LambergCEC/ C. Hoffman
622349/19/2011 Notice of Determination - Petition to Modify

6 page(s)
 CEC/ Docket UnitCEC/ C. Hoffman
615327/26/2011 Letter Regarding Start of Construction

1 page(s)
 Applicant/ G. LambergCEC/ C. Hoffman
611956/24/2011 Limited Notice to Proceed Start of Construction

1 page(s)
 ApplicantCEC/ C. Hoffman
610456/9/2011 Start of Construction Letter

2 page(s)
 CEC/Dockets UnitCEC/C.Hoffman
608946/1/2011 Limited Notice to Proceed Start of Construction

2 page(s)
 Contra Costa Generating Station LLCCEC/ C. Hoffman
598962/28/2011 Memorandum of Understanding Between CEC and Contra Costa County Building Inspection Division for Building Inspection Services

6 page(s)
 CEC/ Docket unitCounty of Contra Costa/ J. Crapo CEC/ T. O'Brien