42542 | 9/27/2007 |
Comments of the IID RE the POU Resource Adequacy
9 page(s)
| | CEC / Docket Unit | Imperial Irrigation District / D. Brammer |
42296 | 9/13/2007 |
Powerpoint presentation re: Joint Committee Workshop held Sept 13, 2007- Progress Report of Publicity Owned Load-Serving Entities Towards Resource Adequacy
12 page(s)
| | CEC/ Docket Unit | CEC/ J. Woodward |
42216 | 9/10/2007 |
CDWR Resource Adequacy Program
5 page(s)
| | CEC / Docket Unit | CDWR / R. Torres |
42021 | 8/23/2007 |
Progress Report on Resource Adequacy Among Publicly Owned Load-Serving Entities in California
118 page(s)
| | CEC | CEC / J. Woodward |
41901 | 8/13/2007 |
Discription of Planning Reserve Margin and Counting Conventions
16 page(s)
| | CEC / Dockets Unit | Western / J. Woodward |
41836 | 8/7/2007 |
Notice of Joint Committee Workshop on the Progress of Publicly Owned Load-Serving Entities towards Resouce Adequacy
4 page(s)
| | CEC / Docket unit | CEC / J. Pfannenstiel / J. Geesman / J. Byron |
41389 | 7/3/2007 |
Appeal of Executive Director's Decision on Application for Confidentiality
2 page(s)
| | CEC/ Dockets Unit | PG&E/ C. Warner |
41362 | 7/2/2007 |
Order Accepting Withdrawal of Confidentiality Appeals and Canceling Evidentiary Hearing.
1 page(s)
| | CEC/ Dockets Unit | CEC/ J. Pfannenstiel |
41349 | 6/29/2007 |
Motion to withdraw Confidentiality Appeals
5 page(s)
| | CEC/Docket Unit | SCE/R. Ippoliti |
41281 | 6/29/2007 |
Letter of Response to SCE re Applicationsfor Confidentiality filed by Southern California Edison
1 page(s)
| | SCE/ W. Walsh | CEC/ B. Blevins |
41192 | 6/26/2007 |
Information on the Metropolitan Water District of Southern California's actual Colorado River Aqueduct power resources and energy requirements for 2006.
2 page(s)
| | CEC/ M. Jaske | MWD/ J. Lambeck |
41184 | 6/26/2007 |
Hearing Order on SCE Confidentiality Appeals.
1 page(s)
| | CEC | CEC/ J. Pfannenstiel |
41141 | 6/25/2007 |
Anza Electric Reliabilty Requirements Report Oct. 2007
11 page(s)
| | CEC/ Dockets Unit | AZ Electric Power Cooperative/ A. Alvarez |
41140 | 6/25/2007 |
Anza Electric Reliabilty Requirements Report Nov. 2007
11 page(s)
| | CEC/ Dockets Unit | AZ Elec Power Cooperative/ A. Alvarez |
41139 | 6/25/2007 |
Anza Electric Reliability Requirements Report Aug. 2007
11 page(s)
| | CEC/ Dockets Unit | Arizona Electric Power Cooperative Inc./ A. Alvarez |
41136 | 6/25/2007 |
Anza Electric 2007 Reliability Requirements Report - Sep 07
11 page(s)
| | CEC/Docket Unit | AZ Elec Power Cooperative/A. Alvarez |
41135 | 6/25/2007 |
Anza Electric 2007 Reliability Requirements Report - Aug 07
11 page(s)
| | CEC/ Docket Unit | AZ Elec Power Cooperative/A. Alvarez |
41134 | 6/25/2007 |
Anza Electric 2007 Reliability Requirements Report - Jul 07
11 page(s)
| | CEC/ Docket Unit | AZ Elec Power Cooperative/A. Alvarez |
41133 | 6/25/2007 |
Anza Electric 2007 Reliability Requirements Report - Jun 07
11 page(s)
| | CEC/ Docket Unit | AZ Elec Power Cooperative/A. Alvarez |
41132 | 6/25/2007 |
Anza Electric 2007 Reliability Requirements Report - May 07
11 page(s)
| | CEC/ Docket Unit | AZ Elec Power Cooperative/A. Alvarez |
41131 | 6/25/2007 |
Anza Electric 2007 Reliability Requirements Report - Apr 07
11 page(s)
| | CEC/Docket Unit | AZ Elec Power Cooperative/A. Alvarez |
41130 | 6/25/2007 |
Anza Electric 2007 Reliability Requirements Report - Jan 07
11 page(s)
| | CEC/ Docket Unit | AZ Elec Power Cooperative/A. Alvarez |
41129 | 6/25/2007 |
Anza Electric 2007 Reliability Requirements Report - Mar 07
11 page(s)
| | CEC/ Docket Unit | AZ Elec Power Cooperative/A. Alvarez |
41128 | 6/25/2007 |
Anza Electric 2007 Reliability Requirements Report - Feb 07
11 page(s)
| | CEC/Docket Unit | AZ Elec Power Cooperative/A. Alvarez |
41126 | 6/25/2007 |
MID Resubmission to Electricity Resource Plans
81 page(s)
| | CEC/Docket Unit | MID/G. Salyer |
41069 | 6/19/2007 |
Prepared Direct Testimony of Heather Raitt on behalf of the CEC regarding the Issue of Renewable Energy Procurement Strategy as Addressed in the Long-Term Procurement Plan of SCE.
25 page(s)
| | Dockets Unit | CEC/ D. Vidaver/ H. Raitt |
41068 | 6/19/2007 |
Prepared Direct Testimony of Heather Raitt on behalf of the CEC regarding the Issue of Renewable Energy Procurement Strategy as Addressed in the Long-Term Procurement Plan of SDG&E.
21 page(s)
| | Dockets Unit | CEC/ D. Vidaver/ H. Raitt |
41067 | 6/19/2007 |
Prepared Direct Testimony of Sylvia Bender on behalf of the CEC regarding the Issue of EE and DR in the Long-Term Procurement Plan of SCE.
18 page(s)
| | Dockets Unit | CEC/ D. Vidaver/ S. Bender |
41066 | 6/19/2007 |
Prepared Direct Testimony of Sylvia Bender on behalf of the CEC regarding the Issue of Load Forecast in the Long-Term Procurement Plan of SCE.
13 page(s)
| | Dockets Unit | CEC/ D. Vidaver/ S. Bender |
41065 | 6/19/2007 |
Prepared Direct Testimony of David Ashuckian on behalf of the CEC regarding Range of Need in the Long-Term Procurement Plan of SCE.
12 page(s)
| | CEC/ Dockets Unit | CEC/ D. Vidaver/ D. Ashuckian |
41064 | 6/19/2007 |
Prepared Direct Testimony of Sylvia Bender on behalf of the CEC regarding the Issue of EE and DR in the Long-Term Procurement Plan of SDG&E.
12 page(s)
| | Dockets Unit | CEC/ D. Vidaver/ S. Bender |
41063 | 6/19/2007 |
Prepared Direct Testimony of David Ashuckian on behalf of the CEC regarding the Issue of Range of Need as Addressed in the Long-Term Procurement Plans of PG&E.
10 page(s)
| | Dockets Unit | CEC/ D. Vidaver/ D. Ashuckian |
41062 | 6/19/2007 |
Prepared Direct Testimony of David Ashuckian on behalf of the CEC regarding the Issue of Retirement of Aging Power Plants as Addressed in the Long-Term Procurement Plans of SCE.
10 page(s)
| | Dockets Unit | CEC/ D. Vidaver/ D. Ashuckian |
41061 | 6/19/2007 |
Prepared Direct Testimony of David Ashuckian on behalf of the CEC regarding the Issue of Retirement of Aging Power Plants as Addressed in the Long-Term Procurement Plans of SDG&E.
10 page(s)
| | Dockets Unit | CEC/ D. Vidaver/ D. Ashuckian |
41059 | 6/19/2007 |
Prepared Direct Testimony of David Ashuckian on behalf of the CEC regarding Range of Need in the Long-Term Procurement Plan of SDG&E.
8 page(s)
| | Dockets Unit | CEC/ D. Vidaver/ D. Ashuckian |
41058 | 6/19/2007 |
Prepared Direct Testimony of David Ashuckian on behalf of the CEC regarding the Issue of Retirement of Aging Power Plants as Addressed in the Long-Term Procurement Plans of PG&E.
9 page(s)
| | Dockets Unit | CEC/ D. Vidaver/ D. Ashuckian |
41057 | 6/19/2007 |
Prepared Direct Testimony of Sylvia Bender on behalf of the CEC regarding the Issue of EE and DR in the Long-Term Procurement Plan of PG&E.
10 page(s)
| | Dockets Unit | CEC/ D. Vidaver/ S. Bender |
41056 | 6/19/2007 |
Prepared Direct Testimony of David Ashuckian on behalf of the CEC regarding the Issue of Planning Reserve Margin as Addressed in the Long-Term Procurement Plans of PG&E.
11 page(s)
| | Dockets Unit | CEC/ D. Vidaver/ D. Ashuckian |
41055 | 6/19/2007 |
Prepared Direct Testimony of Heather Raitt on behalf of the CEC regarding the Issue of Renewable Energy Procurement Strategy as Addressed in the Long-Term Procurement Plan of PG&E.
25 page(s)
| | Dockets Unit | CEC/ D. Vidaver/ H. Raitt |
41036 | 6/18/2007 |
NCPA Pool Member's Resource Adequacy programs (City of Alameda; City of Biggs; City of Gridley; City of Healdsburg; City of Lodi; City of Lampoc; City of Palo Alto; City of Ukiah; Plumas-Sierra; Port of Oakland); NCPA Pool Member Con-Coincident Peak Load CY 2006.
50 page(s)
| | Dockets Unit | CEC/ J. Woodward |
40913 | 6/11/2007 |
Exhibit A: Resource Adequacy Program for the City of Biggs.
7 page(s)
| | CEC/ J. Woodward/ Dockets Unit | The City of Biggs |
40906 | 6/8/2007 |
Resolution No. 2006-07: Resolution of the City of Biggs Adopting a Resource Adequacy Program.
1 page(s)
| | CEC/ J. Woodward/ Dockets Unit | Biggs Municipal Utilities/ M. Mattos/ D. Carbajal/ J. Busch |
40726 | 6/1/2007 |
Comments regarding the May 24, 2007 CEC Committee Workshop on 2008 Peak Demand Forecast and Summer 2007 supply Demand Outlook.
4 page(s)
| | CEC/Dockets Unit | SCEC/M.Alvarez |
40723 | 6/1/2007 |
PG&E's comments on the workshop held May 24, 2007, regarding 2008 Peak Demand and Summer 2007 Outlook.
3 page(s)
| | CEC/Dockets Unit | PG&E/L.Guliasi |
40696 | 6/1/2007 |
Comments on PG&E Comments to CEC POU RA Standards
6 page(s)
| | CEC/Dockets Unit | PG&E/L. Guliasi |
40694 | 5/31/2007 |
City of Industry Resource Adequacy Reports for 2007
108 page(s)
| | CEC/ J. Woodward/Dockets Unit | Intertie/R. Mrlik |
40693 | 5/31/2007 |
Post-Workshop Comments of the CMUA.
5 page(s)
| | CEC/ Dockets Unit | Braun & Blaising/ C. A. Braun/ CMUA |
40688 | 5/31/2007 |
SMUD's Responses to Questions Posed before and during Staff Workshop on Resource Adequacy Policies for Publicly Owned Loadserving Entities.
18 page(s)
| | CEC/ Dockets Unit | SMUD/ S. Cohn |
40676 | 5/31/2007 |
CMUA Comments of the CEC Notice of Staff Workshop on Resource Adequacy Policies & Protocols
5 page(s)
| | CEC/Dockets Unit | CMUA/Braun & Blaising/ C. Braun |
40642 | 5/29/2007 |
July 2007 Monthly Reliability Requirements Plan for Non-PUC Entities Filing for Moreno Valley Utility
13 page(s)
| | CEC/ Dockets Unit/J. Woodward | Moreno Valley Utility/ M. McDonald |
40607 | 5/24/2007 |
Committee Workshop Agenda - 2008 Peak Demand Forecast & Summer 2007 Elec Supply & Demand Outlook
1 page(s)
| | CEC/Dockets Unit | CEC/L. Marshall |
40604 | 5/24/2007 |
Notice of Committee Workshop on 2008 Peak Demand Forecast & Summer 2007 Supply & Demand Outlook
4 page(s)
| | CEC/Dockets Unit | CEC/L. Marshall |
40519 | 5/22/2007 |
Resource Adequacy Policies and Protocols Among Publicly Owned LSEs: Surprising Diversity and a Work in Progress, presented at CEC Staff Public Workshop.
58 page(s)
| | Dockets Unit | CEC/ J. Woodward |
40414 | 5/14/2007 |
Public Staff Workshop - Resourse Adequacy Policies & Protocols for Publicly Owned Load-Serving Entities.
3 page(s)
| | CEC/Docket Unit | CEC/J. Woodard |
40403 | 5/14/2007 |
Corrected Notice of Appeal of CEC Denial of Confidentiality
3 page(s)
| | CEC/Docket Unit | CEC/J. Pfannenstiel |
40388 | 5/11/2007 |
Notice of Appeal of CEC Denial of Confidentiality for SCE
3 page(s)
| | CEC/Docket Unit | CEC/J. Pfannenstiel |
40373 | 5/11/2007 |
Notice of Appeal of CEC's Denial of Confidentiality
4 page(s)
| | CEC/Docket Unit | CEC/J. Pfannenstiel |
40314 | 5/9/2007 |
Amended Executive Director Decision, App for Confidentiality.
3 page(s)
| | PG&E/C. Warner | CEC/B.B. Blevins |
40300 | 5/8/2007 |
Western Area Power Administration's RA Plan Overview
16 page(s)
| | CEC/M. Jaske | Caiso/J. Goodin/Mkt & Prod. Dev. |
40144 | 4/25/2007 |
Truckee Donner PUD Load and Resource Plans
3 page(s)
| | CEC/Docket Unit | CEC/J. Woodward |
40135 | 4/24/2007 |
Letter re: SCE request to postpone discussion of SCE Appeal from the April 25 Business meeting
1 page(s)
| | CEC/B.B. Blevins | SCE/W.V. Walsh |
40129 | 4/24/2007 |
Amended Decision on Application for Confidentiality
2 page(s)
| | SCE/W.V. Walsh | CEC/B.B. Blevins |
40063 | 4/19/2007 |
CEC Response to Sempra Application for Confidentiality
2 page(s)
| | SES/G. Bass | CEC/B.B. Blevins |
40041 | 4/18/2007 |
PG&E Appeal to CEC Decision on Confidentiality
2 page(s)
| | CEC/B.B. Blevins | PG&E/C. Warner |
40026 | 4/17/2007 |
City of Glendale Water & Power-Resource adequacy Narrative
2 page(s)
| | CEC/Docket Unit | City of Glendale/L. Silva |
39994 | 4/13/2007 |
ESPA Filing for the CAISO
134 page(s)
| | CEC/Docket Unit | Robertson Bryan Inc/S. Robertson |
39924 | 4/6/2007 |
IEPR Confidentiality Appeals: April 25 Business Meeting
1 page(s)
| | CEC/Commissioners/Advisors | PG&E/SCE/J. Blees |
39887 | 4/4/2007 |
NCPA Irrp Capacity Reserve Verification
4 page(s)
| | CEC/J. Woodward/Docket Unit | NCPA/S. Tomashefsky |
39874 | 4/4/2007 |
NCPA Electricity Supply Data Submittal
1 page(s)
| | CEC/Docket Unit | NCPA/S. Tomashefsky |
39862 | 4/2/2007 |
Rancho Cucamonga Municipal Utility REVISED Cover Letter for Self-Designation of Confidential Information
1 page(s)
| | CEC/B.B. Blevins | RCMU/L. Haug |
39805 | 3/29/2007 |
PG&E Appeal of Decision on App for Conf
5 page(s)
| | CEC/Docket Unit | PG&E/C. Warner |
39786 | 3/28/2007 |
Approval of App for Confidentiality
2 page(s)
| | PilotPower Group/T. Darton | CEC/B.B. Blevins |
39773 | 3/27/2007 |
SCE Appeal to Confidentiality
12 page(s)
| | CEC/B.B. Blevins | SCE/C. Karlstad/M. Whatley |
39741 | 3/23/2007 |
Sempra App for Confidentiality
3 page(s)
| | CEC/B.B. Blevins/Docket Unit | Sempra/G. Bass |
39662 | 3/19/2007 |
Response to App for Confidentiality
1 page(s)
| | City of Anaheim/M. Edwards/Dockets Unit | CEC/B.B. Blevins |
39602 | 3/13/2007 |
CEC response to sce app for conf for resource data
5 page(s)
| | SCE/W. Walsh | CEC/ B.B.Blevins |
39601 | 3/13/2007 |
CEC response to sdg&E app for conf for resource data
3 page(s)
| | SDG&E/ B. Orozco | CEC/ B.B.Blevins |
39600 | 3/13/2007 |
CEC response to pacific gas and electric app for conf for resources data
7 page(s)
| | PG&E/ L. Guliasi | CEC/B.B.Blevins |
39583 | 3/13/2007 |
Pilot Power Application for Confidentiality and Confidential Data. App docketed and full version with data saved to the p drive
6 page(s)
| | CEC/ B.B.Blevins | PP/ T. Darton |
39564 | 3/12/2007 |
CEC response to APS application for confidentiality for 1J submittal
2 page(s)
| | APS/ Jenine Schenk | CEC/ B.B.Blevins |
39510 | 3/7/2007 |
Letter RE the Application for Confidentiality, Electricity Resource Planning Forms S-1, S-2, and S-5, Sempra Energy Solutions.
2 page(s)
| | Sempra Energy Solutions/ G. Bass | CEC/ B. B. Blevins |
39509 | 3/7/2007 |
Letter RE the Application for Confidentiality, Electricity Resource Planning Forms S-1, S-2, and S-5, Constellation NewEnergy.
3 page(s)
| | Ellison, Schneider & Harris/ A. Brown | CEC/ B. B. Blevins |
39467 | 3/2/2007 |
Modesto Irrigation District Summary for the Electricity Resource Plans process.
1 page(s)
| | CEC/ Docket Unit | MID/ G. Salyer |
39461 | 3/5/2007 |
Data previously provided to J. Woodward for incorporation in the CEC's Resource Adequacy review.
1 page(s)
| | CEC/ Docket Unit | Port of Stackton/ J. Kaspar |
39440 | 3/1/2007 |
Western Area Power Administrations submittal of forms. Email docketed and full version with all data saved to the p drive.
1 page(s)
| | WAPA/ H. Kahiwagi | CEC/ J. Woodward |
39439 | 3/1/2007 |
City of anaheim self designation of confidentiality and confidential data. Self designation docketed and full version saved to the p drive.
3 page(s)
| | CEC/ B.B.Blevins | CofA/ S. Sciortino |
39411 | 2/27/2007 |
CEC response to Ellison, schneider and Harris, LLP for Rancho Cucamonga Munic. Ut. Dist. for application for confidentialtiy for Resource plan.
2 page(s)
| | ES&H,LLP/ L. Haug/ RCMU | CEC/ B.B. Blevins |
39410 | 2/27/2007 |
CEC response to Law offices of carrie anne downey for the IID's Resource forms S-1, S-2, S-3
2 page(s)
| | LOofCAD/ C. Downey/ IID | CEC/ B.B.Blevins |
39409 | 2/27/2007 |
CEC response to SMUD application for confidentiality for Resource form S-5
2 page(s)
| | SMUD/ S. Cohn | CEC/ B. B. Blevins |
39408 | 2/27/2007 |
CEC Response to Application for confidentiality for Strategic energy's resource plan forms S-1, S-2, and S-5.
2 page(s)
| | SE/ C. Boyd | CEC/B.B. Blevins |
39396 | 2/26/2007 |
City and county of san francisco Resource Adequacy forms. Email docketed and full version with data saved to the p drive.
1 page(s)
| | CEC/ Dockets Unit | SFW/ J. Hendry |
39371 | 2/22/2007 |
City of Corona's Resource Plan filing. Email docketed and full version with data is saved to the p drive
1 page(s)
| | CEC/ Docket Unit | CofC/ Y. Lehr |
39362 | 2/22/2007 |
CITY OF PASADENA'S NARRATIVE REPORT DESCRIBING ADEQUACY STANDARDS, PROCUREMENT REQUIREMENTS, AND PLANNING PROTOCOLS
37 page(s)
| | CEC/B.B. BLEVINS | COP/A. D'AQUILA |
39356 | 2/21/2007 |
LA department of water & power Resource plan submittal. Full version with data saved to the p drive.
2 page(s)
| | CEC/ Dockets Unit | LADW&P/ R. Howard |
39322 | 2/14/2007 |
CITY OF ANAHEIM CONFIDENTIAL ELECTRICITY SUPPLY PLANS
2 page(s)
| | CEC/DOCKETS UNIT | COA/C. GUSS |
39320 | 2/12/2007 |
SMUD 07 Resource plan submittal. Transmittal letter docketed and full version with data saved to the p drive
1 page(s)
| | CEC/ Docket Unit | SMUD/ G. Brownell |
39278 | 2/15/2007 |
CITY OF PASADENA 2007 ELECTRIC RESOURCE PLANS FORMS
1 page(s)
| | CEC/DOCKETS UNIT | COP/P. LEE |
39276 | 2/14/2007 |
CITY OF ANAHEIM ELECTRICITY SUPPLY PLANS DATA
1 page(s)
| | CEC/DOCKETS UNIT | COA/C. GUSS |
39275 | 2/14/2007 |
SUPPLY FILES FROM CITY OF ROSEVILLE
1 page(s)
| | CEC/DOCKETS UNIT | COR/M. WARDELL |
39267 | 2/14/2007 |
Burbank water & power's 2007 electricity resource plan submittal. Email docketed and full version with data saved to the p drive
1 page(s)
| | CEC/ Docket Unit | BW&P/H. Pandey |
39264 | 2/13/2007 |
City of Glendale Resource plan filing. Email docketed and full version with data saved to the p drive.
1 page(s)
| | CEC/ Docket Unit | CEC/ J. Kessler |
39260 | 2/13/2007 |
Strategic Energy Resource plan. Cover letter and App. Docketed and full version with data saved to the p drive.
5 page(s)
| | CEC/ Docket Unit | SE/ C. Boyd |
39256 | 2/13/2007 |
PG&E's Supply forms. Docketed Cover letter, App, and Data.
17 page(s)
| | CEC/ DOcket Unit | PG&E/ L. Guliasi |
39244 | 2/13/2007 |
SMUD Resource plan, app for confidentiality, cover letter, and confidential data.
12 page(s)
| | CEC/ Docket Unit | SMUD/ S. Cohn |
39237 | 2/9/2007 |
Constellation NewEnergy resource plan. cover letter and app docketed and full version with data saved to the pdrive- confidential
5 page(s)
| | CEC/ Docket Unit | CNE/ A. Brown |
39236 | 2/9/2007 |
Rancho Cucamonga munic. util. resource plan. cover letter and app. docketed full version with data saved to p drive- confidential.
4 page(s)
| | CEC/ Docket Unit | RCMU/L. Haug |
39235 | 2/9/2007 |
SDG&E supply forecast cover letter, app, and data. Full version saved to the p drive- confidential
73 page(s)
| | CEC/ Docket Unit | SDG&E/ R. Anderson |
39232 | 2/6/2007 |
Imperial irigation district Resource plan. Cover letter and app for confidentiality docketed. Full version with data saved to the p drive.
4 page(s)
| | CEC/ Dockets Unit | IID/ C. Downey |
39231 | 2/8/2007 |
SCE Supply Forecast PUBLIC VERSION. Docketed cover letter with app for conf. version. full version saved to the pdrive-non confidential.
16 page(s)
| | CEC/ Docket Unit | SCE/ M. Alvarez |
39230 | 2/8/2007 |
SCE's Supply Forecast CONFIDENTIAL VERSION. Cover letter and app. docketed and full version saved to the p drive- confidential.
16 page(s)
| | CEC/ Docket Unit | SCE/M. Alvarez |
39226 | 2/8/2007 |
Email Chain
2 page(s)
| | CEC/ Jim Woodward | ENCO/ Jack Stermer |
39216 | 2/8/2007 |
APS ENERGY SERVICES RESOURCE PLANS. THE APP FOR CONFIDENTIALITY DOCKETED. FULL VERSION SAVED TO P DRIVE
5 page(s)
| | CEC/BB BLEVINS | AES/J. SCHENK |
39215 | 2/7/2007 |
LASSEN'S 2007 LOAD FORECAST AND PEAK USAGE
1 page(s)
| | CEC/J. WOODWARD | LMUD/T. BOUCHER |
39214 | 2/7/2007 |
TURLOCK IRRIGATION DISTRICT FORMS FOR SUBMITTING THE ELECTRICITY RESOURCE PLANS FOR 2007
74 page(s)
| | CEC/DOCKETS UNIT | TID/R. JONES |
39211 | 2/7/2007 |
CITY OF COLTON'S 2007 ANNUAL RESOURCE ADEQUACY TEMPLATE
1 page(s)
| | CEC/J. WOODWARD | COC/J. OLKO |
39210 | 2/7/2007 |
CITY OF VERNON LIGHT & POWER INFORMATION ON RA
9 page(s)
| | CEC/DOCKETS UNIT | COVLP/M. GARCIA |
39201 | 2/6/2007 |
PWRPA's year-ahead Resource Adequacy showings - IRRP.
1 page(s)
| | CEC/ J. Woodward/ Docket Unit | PWRPA/ B. McLaughlin |
39198 | 2/6/2007 |
Redding Electric Utility's response to CEC request for resource planning information, and a Narrative Description of Redding Electric Utility's resource adequacy process.
1 page(s)
| | CEC/ Docket Unit | Redding Electric Utility/ N. Zettel |
39196 | 2/6/2007 |
City of Cerritos' Supply Resource filing.
1 page(s)
| | CEC/ J. Woodward/ Docket Unit | City of Cerritos/ T. Clarke/ V. Brar |
39193 | 2/6/2007 |
Valley Electric Association filing.
1 page(s)
| | CEC/ Docket Unit | Valley Electric Association/ T. Stagg |
39179 | 2/5/2007 |
City of shasta lakeresource plan form s-5
5 page(s)
| | CEC/ Docket Unit | CofSL/P. Eichenberger, P.E. |
39144 | 1/31/2007 |
California department of water resources forecasting submission
1 page(s)
| | CEC/ Docket Unit | CDWR/ J. Seehafer |
39133 | 1/31/2007 |
City of santa clara/ silicon valley power's submittal for 06-IEP-1J. Email docketed only all forms saved to p drive
1 page(s)
| | CEC/ Dockets Unit | CofSC-SVP/ M. Pretto |
39100 | 1/24/2007 |
city of riverside public utilities department's 2007 IEPR Electricity resource plans + docketed email
1 page(s)
| | CEC/ Docket Unit | RPU/ S. Johnson |
39095 | 1/25/2007 |
City of Banning 2007 RA Report sent by Fred Mason, Power resource aand revenue administrator
1 page(s)
| | CEC/ Dockets Unit | CofB/ F. Mason |
38973 | 1/19/2007 |
SEMPRA application for designation of confidential records and submittal of electricity resource plan forms years 2007-2011.
3 page(s)
| | CEC/ Docket Unit | SEMPRA/ G. Bass |
38876 | 1/5/2007 |
Electricity Resources Planning Form S-1 - CRATs
10 page(s)
| | Docket Unit | CEC/ J. Woodward |
38871 | 1/5/2007 |
Forms & Instructions for Submitting Electricity Resource Plans.
65 page(s)
| | CEC/ Docket Unit | CEC/ J. Woodward |
38588 | 12/8/2006 |
Azuza Light and Water's Bob Tang Presents City of Azuza's 2007 Resource Plan.
1 page(s)
| | CEC/ Dockets Unit | AL&W/ B. Tang |
38577 | 12/7/2006 |
Joint Committe Workshop
38 page(s)
| | Docket Unit | CEC |
38541 | 12/1/2006 |
SCE Comments on the 07 IEPR Electricity Supply Data Request
2 page(s)
| | Docket Unit | M. Alverez / SCE |
38539 | 12/4/2006 |
Comments of the NRDC on the 2007 IEPR Electricity Supply Forms and Instructions for Submitting Electricity Resources Plan.
5 page(s)
| | Docket Unit | Eric Wanless and Audrey Chang / NRDC |
38470 | 11/22/2006 |
Forms and Instructions for Submitting Electricity Resource Plans.
63 page(s)
| | Docket Unit | CEC |
38426 | 11/17/2006 |
Notice of Joint Committee Workshop on Electricity Supply Data Request.
4 page(s)
| | Docket Unit | J. Pfannenstiel / J. L. Geesman/ J. D. Byron / CEC |
2198-0 | 9/19/2007 |
Joint Committee Workshop Before the CAERC and Development Commission
39 page(s)
| | | |
2149-0 | 6/5/2007 |
2007 IEPR Committee Workshop
96 page(s)
| | | |
2143-0 | 5/29/2007 |
Committee Workshop: Preparation of the 2007 IEPR
121 page(s)
| | | |