63319 | 1/10/2012 |
Letter from Calpine Re License Expiration
1 page(s)
| | CEC/M.Dyas | Calpine Corporation/B.Mcbride |
44020 | 1/8/2008 |
Exhibit List for Pastoria Energy Facility
75 page(s)
| | CEC / Docket Unit | CEC / M. Read |
38719 | 12/14/2006 |
Year One: Compliance payment check. First year's compliance payment. 1st compliance payment check.
1 page(s)
| | CEC/ Dockets Unit | CEC/ J. Reede |
38718 | 12/19/2006 |
Notice of Decision by CEC
11 page(s)
| | CEC/ Dockets Unit | CEC/ J. Reede |
38664 | 12/15/2006 |
Final Commission Decision
300 page(s)
| | CEC/ Docket Unit | CEC/ M. Read |
38659 | 12/15/2006 |
Notice of Avalibility of the Final Commission Decision on the Pastoria Energy Facility Project.
1 page(s)
| | All Commissioners | CEC |
38396 | 11/15/2006 |
Errata to the PMPD
17 page(s)
| | CEC/Dockets Unit | CEC/J.Boyd |
38394 | 11/15/2006 |
Notice of Public Hearing
5 page(s)
| | CEC/ Dockets Unit | CEC/Commissioner |
38214 | 10/20/2006 |
Applicant's Status Report
4 page(s)
| | CEC/Dockets Unit | Calpine/G. Wheatland |
38204 | 10/18/2006 |
Order Directing Parties to File Status Reports.
4 page(s)
| | Docket Unit | CEC/ J.D. Boyd |
37424 | 7/14/2006 |
Presiding Member's Proposed Decision Re: AFC for 05-AFC-1
1 page(s)
| | CEC | Kern County Fire Department / D. L. Thompson |
37415 | 6/29/2006 |
Applicant's Comments on Presiding Member's Proposed Decision
19 page(s)
| | Ellison, Schnieder & Harris | CEC |
37377 | 7/12/2006 |
Re: Public Health 1: Pastoria Energy Facility Expansion Project
3 page(s)
| | S. Geftner | J. Harria / Kery Willis / Ellison & Schneider |
37374 | 7/11/2006 |
Committee Conference for AFC Pastoria Energy Facility 1610 MW Expansion
52 page(s)
| | Docket Unit | CEC |
37220 | 6/30/2006 |
Letter informing the Committee that the Applicant will be submitting to the San Joaquin Valley Joint Unified Air Pollution Control District a request to revise the package of offsets to be applied to the PEFE project.
4 page(s)
| | J. Boyd/ CEC | J. Harris/ Ellison, Schneider & Harris L.L.P. |
37212 | 6/29/2006 |
Staff PMPD Comments
10 page(s)
| | CEC/J. Boyd/S. Gefter/Docket Unit | CEC/J. Reede |
37126 | 6/19/2006 |
Notice of Rescheduled Conference on The PMPD
3 page(s)
| | Docket Unit | CEC / Hearing Office |
37085 | 6/8/2006 |
Notice of Availability of the Presiding Member's Proposed Decision and Notice of Committee Conference and Notice of Commission Hearing
6 page(s)
| | Docket Unit | J. D. Boyd /CEC |
37084 | 6/8/2006 |
Cover letter and Pastoria Energy Facility Expansion Application for Certification 05-AFC-1 Presiding Member's Proposed Decision
359 page(s)
| | Docket Unit | Hearing Office |
36647 | 3/30/2006 |
Offset Equivalency Report
6 page(s)
| | Docket Unit | San Joaquin Valley Air Pollution Control District |
36646 | 3/30/2006 |
05-AFC-1 Pastoria Energy Facility Expansion Project
5 page(s)
| | Docket Unit | Ellison, Schneider & Harris L.L. P. |
36598 | 3/17/2006 |
3 documents: Joint Stipulation RE: Testimony & Exhibits of Applicant and Commission Staff; Attachment A: Topic & Witness Schedule; Affidavit of Michael Argentine. POS
19 page(s)
| | CEC/Docket Unit | Ellison, Schneider & Harris LLP |
36560 | 3/17/2006 |
Supplemental Testimony
18 page(s)
| | CEC/Desmond/Boyd/Gefter/Docket Unit | CEC/Reede |
36514 | 3/13/2006 |
Technical Assessment Study.
7 page(s)
| | Mr. Robert Lugo/CEC/Docket Unit | CA ISO/D. Shirmohammadi |
36490 | 1/10/2006 |
Testimony for the AFC for Pastoria. POS
302 page(s)
| | James Reede/CEC/Docket Unit | Pastoria Energy |
36484 | 3/7/2006 |
Notice of Revised Evidentiary Hearing Date and New Teleconference Number
5 page(s)
| | CEC/Docket Unit | CEC/J. Desmond and J. Boyd |
36342 | 2/7/2006 |
Notice of Evidentiary Hearing and Hearing Order - POS
10 page(s)
| | CEC/Docket Unit | CEC/Desmond/Boyd |
36322 | 2/3/2006 |
Supplemental Air Quality Testimony
5 page(s)
| | CEC | Pastoria Energy Facility, LLC |
36289 | 1/30/2006 |
Application for Certification Pastoria Energy Facility Expansion Project 05-AFC-1
7 page(s)
| | Docket Unit | Pastoria Energy Facility, LLC |
36242 | 1/25/2006 |
Response to request for comments
2 page(s)
| | CEC/Reede/Docket Unit | U S Army Corps of Engineers |
36236 | 1/24/2006 |
Pastoria Energy Facility Expansion Project #1052027
2 page(s)
| | Docket Unit | Calpine/B. McBride |
36224 | 1/23/2006 |
Technical Assessment
69 page(s)
| | Docket Unit | EDISON /P. L. Arons |
36167 | 1/10/2006 |
Pastoria Energy Facility - Applicant's Prehearing Conference Statement
19 page(s)
| | CEC/Docket Unit | Ellison, Schneider & Harris L.L.P./Wheatland/Harris/Ellison |
36166 | 1/10/2006 |
Staff's Prehearing Conference Statement. POS
13 page(s)
| | CEC/Docket Unit | CEC/K. Willis |
36161 | 1/9/2006 |
Applicant's Status Report #2. POS
4 page(s)
| | CEC/Docket Unit | Ellison, Schneider & Harris/G. Wheatland |
36153 | 1/6/2006 |
Status Report #3. POS
4 page(s)
| | Chairman Desmond/Commissioner Boyd | CEC/J. Reede |
36079 | 12/14/2005 |
Data Adequacy Resolution for Pastoria Energy Facility AFC
1 page(s)
| | CEC/Docket Unit | CEC/Desmond |
36078 | 12/13/2005 |
Notice of Prehearing Conference
9 page(s)
| | CEC/Docket Unit | CEC/Desmond/Boyd |
36050 | 12/13/2005 |
Status Report #2
4 page(s)
| | CEC/Desmond/Boyd/Docket Unit | CEC/Reede |
36014 | 11/9/2005 |
Environmental Analysis - Transmission Line Project
55 page(s)
| | CEC/Docket | Calpine |
35995 | 12/5/2005 |
Agency Distribution List.
1 page(s)
| | Agency List/CEC/Docket Unit | CEC/R. Johnson |
35987 | 12/1/2005 |
Librarian Distribution.
1 page(s)
| | Librarian Dist/CEC/Docket Unit | CEC/R. Johnson |
35979 | 11/29/2005 |
Notice of Availability of Final Staff Assessment.
2 page(s)
| | General Dist./CEC/Docket Unit | CEC/R. Johnson |
35956 | 11/23/2005 |
Applicant Status Report # 2
3 page(s)
| | Docket Unit | Ellison, Schneider & Harris |
35894 | 11/16/2005 |
Notice of Final Action - Determination of Compliance (DOC) (05-AFC-01): Project Number 1052027
95 page(s)
| | Paul Richins/CEC/Docket Unit | San Joaquin Valley Air Pollution Control District/Warner |
35860 | 11/9/2005 |
Transmission Line Project Environmental Analysis.
59 page(s)
| | B.B. Blevins/CEC/Docket Unit | Pastoria |
35858 | 11/9/2005 |
Confidential filing on Cultural.
1 page(s)
| | James Reede/CEC/Docket Unit | Pastoria |
35813 | 10/26/2005 |
Comments on Preliminary Determination of Compliance for Pastoria Energy Facility Expansion Project No. S1052027.
13 page(s)
| | Docket Unit | Sierra Research/D. Warner |
35794 | 10/25/2005 |
Applicant's Status Report #1. POS
4 page(s)
| | CEC/Docket Unit | Ellison, Schneider & Harris |
35793 | 10/26/2005 |
Review of the CEC Preliminary Staff Assessment. POS
14 page(s)
| | James Reede/CEC/Docket Unit | Dept of Toxic Substances Control/R. Hume |
35790 | 10/25/2005 |
Pastoria Status Report #1
4 page(s)
| | CEC/Docket Unit/Desmond/Boyd | CEC/Reede |
35781 | 10/20/2005 |
Pastoria Energy Facility Expansion - Comments on Preliminary Staff Assessment
12 page(s)
| | Reede/CEC/Docket Unit | Wheeler Ridge-Maricopa Water Storage District/Kunde |
35773 | 10/21/2005 |
Applicant's response to the Preliminary Staff Assessment. POS
65 page(s)
| | James Reede/CEC/Docket Unit | URS/Ellison, Schneider & Harris |
35763 | 10/19/2005 |
Second Amendment to Option and Water Services Agreement between Pastoria Energy Facility and Kern Water Bank Authority
17 page(s)
| | CEC/Docket | Calpine |
35761 | 10/19/2005 |
Letters to Interested Native Americans dated 10/18/05 regarding the Proposed New Turbine at Pastoria Energy
14 page(s)
| | Intrested Native Americans | CEC/Richin |
35744 | 10/19/2005 |
Comments on Preliminary Determination of Compliance. POS
6 page(s)
| | David Warner/CEC/Docket Unit | CEC/P. Richins |
35607 | 10/6/2005 |
Pastoria Facility Expansion, preliminary Determination of Compliance (PDOC)
8 page(s)
| | CEC/Dave Warner | Gerardo Rios |
35596 | 10/5/2005 |
Comments on the PDOC issued 8/31/05
3 page(s)
| | SJCAPCD/Warner/CEC/Docket Unit | Sierra Research/Rubenstein |
35529 | 9/23/2005 |
District Rule 4p. excerpted from the District's "Rules & Regulations for the Distribution of Water." POS
5 page(s)
| | Natasha Nelson/CEC/Docket Unit | Wheeler Ridge-Maricopa Water Storage District/R. Kunde |
35528 | 9/22/2005 |
Workshop Notice on Preliminary Staff Assessment to be held October 4, 2005. POS
5 page(s)
| | CEC/Docket Unit | CEC/T. O'Brien |
35527 | 9/22/2005 |
Notice of Availability.
2 page(s)
| | CEC/Docket Unit | CEC/R. Johnson |
35526 | 9/22/2005 |
Agency Dist. List
1 page(s)
| | CEC/Docket Unit | CEC/R. Johnson |
35525 | 9/22/2005 |
Librarian dist. letter.
2 page(s)
| | CEC/Docket Unit | CEC/Librarian |
35519 | 9/20/2005 |
Preliminary Staff Assessment. POS
1 page(s)
| | CEC/Docket Unit | CEC/J. Reede |
35495 | 9/15/2005 |
Committee Scheduling Order. POS
6 page(s)
| | CEC/Docket Unit | CEC/Chairman Desmond & Commissioner Boyd |
35444 | 9/6/2005 |
Notice of a Preliminary Determine of Compliance (PDOC)
84 page(s)
| | Andrew Whittome, Pastoria Energy Facility/CEC/Docket Unit | San Joaquin Valley Pollution Control District/D. Warner |
35382 | 8/26/2005 |
Revised POS List
4 page(s)
| | All Parties/CEC/Docket Unit | CEC/Read |
35325 | 8/22/2005 |
SCE Transmission Owner Tariff Facilities Study Agreement
10 page(s)
| | CEC/Docket Unit | SCE/Litzinger |
35256 | 8/12/2005 |
Final Data Responses to address formal and informal Data Requests. POS
31 page(s)
| | Dr. James Reede/CEC/Docket Unit | URS/Calpine |
35207 | 8/10/2005 |
Re: Mitigation Requirements in Worker Safety 3, and a future agreement or contract between Kern County and PEF.
5 page(s)
| | CEC/Reede/Docket Unit | Kern County Fire Dept & Office of Emergency Services/Thompson/Scott |
35204 | 8/10/2005 |
Notice of Public Informational Hearing and Site Visit. POS
10 page(s)
| | CEC/Docket Unit | CEC |
35167 | 8/4/2005 |
Pastoria AFC is Data Adequate for commencement of a 12-month review
1 page(s)
| | CEC/Docket Unit | CEC/Desmond |
35138 | 8/1/2005 |
Letter not Approving 05-AFC-1 Until Such a Contract is Formalizing and Signed Between the County of Kern and PEF
2 page(s)
| | CEC | Kern County Fire Dept |
35121 | 8/1/2005 |
Data Requests
69 page(s)
| | Dockets | URS Corp/McKee |
35070 | 7/27/2005 |
Cal-ISO's review of the System Impact Study performed by SCE - POS
5 page(s)
| | SCE/Lugo/CEC/Docket Unit | California ISO/Miller |
35064 | 7/25/2005 |
"Offset Equivalency Report" as referenced in the PEF Expansion Data Responses: Response #26
5 page(s)
| | CEC/Reede/Docket Unit | Sierra Research/Matthews |
35057 | 7/25/2005 |
Post Construction Report for the Natural Gas Pipeline dated 2004; re: Response to Data Request 34; (1 of 6 documents)
23 page(s)
| | CEC/Docket Unit | Calpine Pastoria Energy Facility |
35056 | 7/25/2005 |
Biological Resources Annual Compliance Report (Report Period March 2004 - March 2005) dated July 2005; re: Response to Data Request 34, (2 of 6 document
35 page(s)
| | CEC/Docket Unit | Calpine Pastoria Energy |
35055 | 7/25/2005 |
Biological Resources Mitigation Implementation & Monitoring Plan; re: Response to Data Request 34, (3 of 6 documents)
200 page(s)
| | CEC/Docket Unit | Calpine Pastoria Energy Facility |
35054 | 7/25/2005 |
Nationwide Permit Notification Corps Of Engineers 404 Permit: re: Response to Data Request 34--included; URS ltr to CA Dept of Fish & Game re: 1603 St
113 page(s)
| | Pastoria Energy/Docket Unit | Nationwide Permit Notification Corps of Engineers |
35053 | 7/25/2005 |
Amended Biological Opinion, issued by the USFWS: re: Response to Data Request 35. (5 of 6 documents)
12 page(s)
| | Gerardo Rios/Docket Unit | Fish & Wildlife Service/ken Sanchez |
35052 | 7/25/2005 |
RE: Response to Data Request 41. (6 of 6 documents)
26 page(s)
| | Pastoria Energy/Docket Unit | Weeler Ridge-Maricopa Water Storage District |
35039 | 7/21/2005 |
Hearing Officer Assignment.
1 page(s)
| | Docket Unit | J. Desmond |
34886 | 7/13/2005 |
Data Requests
14 page(s)
| | Calpine Corporation/Whitmore/CEC/Docket Unit | CEC/Reede |
34885 | 7/13/2005 |
Pastoria Energy Facility Expansion Issue Identification Report
10 page(s)
| | CEC/Desmond/Boyd/Docket Unit | CEC/Reede |
34884 | 7/13/2005 |
Data Request Workshop
1 page(s)
| | CEC/Docket Unit | CEC/O'Brien |
34879 | 7/13/2005 |
Clarification of Applicant and Proposed Owner.
1 page(s)
| | Commissioner Blevins/CEC/Docket Unit | Ellison, Schneider & Harris, LLP |
34842 | 7/7/2005 |
Additional information related to Air quality Impacts in response to informal CEC Staff Requests
3 page(s)
| | CEC/Reede/Docket Unit | Sierra Research/Matthews |
34841 | 7/7/2005 |
REVISED: Additional information related to Air quality Impacts in response to informal CEC Staff Requests
3 page(s)
| | CEC/Reede/Docket Unit | Sierra Research/Matthews |
34699 | 6/15/2005 |
Response to Written Request for Comments on Pastoria Energy
2 page(s)
| | Calpine/Whittome/CEC/Dockets | Depart. of the Army/Sutton |
34672 | 6/17/2005 |
2nd Data Adequacy Recommendation For The Pastoria Energy Facility Expansion Project
30 page(s)
| | Docket Unit/ J. Desmond | CEC |
34668 | 6/15/2005 |
Letter to Provide Corrected Version of the Tables that Include the Erroneous Annual NOx Emissions
7 page(s)
| | SJVAPCD/Goff/CEC/Dockets | Sierra Research/Matthews |
34667 | 6/15/2005 |
Letter from San Joaquin Valley Air Pollution Control Dist. indicating that SJVAPCD Has Not Identified any Sources of Air Emissions That Would Meet t
2 page(s)
| | CEC/Reede/Dockets | Sierra Research/Matthews |
34651 | 6/17/2005 |
Notice of Receipt Application for Certification Supplemental Information Pastoria Energy Facility Expansion Project.
2 page(s)
| | Docket Unit | CEC |
34650 | 6/15/2005 |
Letter From the US Environmental Protection Agency to Andrew Wittome, Pastoria's Energy Facility indicating that EPA has found PEF's Application fr
5 page(s)
| | CEC/Reede/Dockets | Sierra Research/Matthews |
34649 | 6/16/2005 |
Option and Water Services Agreement
54 page(s)
| | Docket Unit | Kern Water Bank Authority |
34620 | 6/14/2005 |
Document Handling - Supplemental Information
1 page(s)
| | Librarian/Dockets | CEC/Johnson |
34619 | 6/14/2005 |
Request for Agency Participation in the Review of the Pastoria Energy Facility - Supplemental Information
1 page(s)
| | Agency Distribution List | CEC/Johnson |
34612 | 6/15/2005 |
Pastoria Energy Facility Expansion Project.
5 page(s)
| | Docket Unit | Sierra Research/ N. Matthews |
34610 | 6/21/2005 |
Comment on Pastoria Energy Facility Expansion.
2 page(s)
| | Docket Unit | Department of The Army/ A. Whittome |
34609 | 6/15/2005 |
Pastoria Energy Facility Expansion Project.
2 page(s)
| | J. Reede/ Docket Unit | Sierra Research |
34608 | 6/15/2005 |
Pastoria Energy Facility Expansion Project
7 page(s)
| | Docket Unit | Sierra Research |
34587 | 6/13/2005 |
Notice 1CD Copy of The Data Adequacy Response PK. (James has the CD in his possession, dockets does not have the CD)
1 page(s)
| | Docket Unit/ J. Reede | URS Corporation/ R. |
34583 | 6/13/2005 |
05-AFC-1 Pastoria Energy Facility 160 MW Expansion Supplement To 05-AFC-1 Data Adequacy Response Pk.
118 page(s)
| | Docket Unit | URS Corporation/ R. M. Grosman for J. Scholl |
34582 | 6/13/2005 |
05-AFC- Pastoria Energy Facility 160 MW Expansion Supplement To 05-AFC-1 (7 Binders 3 CD's)
570 page(s)
| | Docket Unit | Capline |
34567 | 6/9/2005 |
PEF Flood Protection
1 page(s)
| | CEC/Tronaas/Dockets | Kern County Engineering & Survey Services/Fenton |
34449 | 5/27/2005 |
Data Adequacy Recommendation For The Pastoria Energy Facility Expansion Project.
78 page(s)
| | Docket Unit/ J. Desmond | CEC/ S. Matthews |
34428 | 5/25/2005 |
Pastoria Energy Facility Expansion Project # 1052027
10 page(s)
| | Docket Unit | Sierra Research / N. Mathews |
34414 | 5/23/2005 |
Notice of Receipt of Complete Application 05-AFC-1 Project Number : S-1052027
2 page(s)
| | Docket Unit | San Joaquin Valley/ D. Warner |
34277 | 5/5/2005 |
Application for a Prevention of Significant Deterioration Permit
298 page(s)
| | US EPA REgion IX/Rios/Dockets | Calpine/Whittome |
34224 | 5/5/2005 |
Pastoria Energy Facility Expansion Project Application For Authority To Construct.
5 page(s)
| | Docket Unit | Calpine/ B. Mcbride |
34223 | 5/5/2005 |
Pastoria Energy Facility Expansion Project Application For a Prevention of Significant Deterioration Permit.
298 page(s)
| | Docket Unit | Calpine/ A. Wittome |
34217 | 4/29/2005 |
Application for Certification for Pastoria Energy Facility 160 MW Expansion Project
1269 page(s)
| | CEC/Matthews/docket Unit | Calpine/Brown |
34197 | 4/29/2005 |
Phase I ESA for Pastoria Energy Facility
142 page(s)
| | CEC/Matthews/dockets | Calpine/Brown |
34190 | 5/3/2005 |
CEC Responsibilities and Project Description
2 page(s)
| | State Senate/Ashburn | CEC/Johnson |
34189 | 5/3/2005 |
CEC Responsibilities and Project Description
2 page(s)
| | State Assembly/Mccarthy | CEC/Johnson |
34184 | 4/29/2005 |
Permit Book
165 page(s)
| | CEC/Matthews/dockets | Calpine/Brown |
34183 | 4/29/2005 |
Visual Simulation of the Proposed Power Plant Addition From Key Observation Points
3 page(s)
| | CEC/Matthew/dockets | Calpine/Brown |
34182 | 5/2/2005 |
Request for Agency Participation in the Review of Pastoria Energy Facility
3 page(s)
| | Agency Distribution List/Dockets | CEC/Johnson |
34181 | 5/2/2005 |
CEC Responsibilities and Project Description
2 page(s)
| | Kern Co. Board Of Supervisors/Watson/dockets | CEC/Johnson |
34180 | 5/2/2005 |
Notice of Receipt Application for Certification for Pastoria Energy Facility Expansion Project
2 page(s)
| | CEC/Dockets | CEC/Johnson |
34178 | 5/2/2005 |
Document Handling for Pastoria Energy
3 page(s)
| | Librarian/Dockets | CEC/Johnson |
34175 | 4/29/2005 |
Air Quality Monitoring Files, PEF Expansion Project
2 page(s)
| | CEC/Matthews/dockets | Calpine/Brown |
2077-0 | 4/6/2006 |
Hearing
71 page(s)
| | | CEC |
2062-0 | 1/27/2006 |
prehearing conference
74 page(s)
| | | CEC |
2012-0 | 9/20/2005 |
Public Informational Hearing and Site Visit
105 page(s)
| | | CEC |