34222 | 5/5/2005 |
Project Close Out Riverside Energy Resource Center, 04-SPPE-1
3 page(s)
| | Docket Unit | CEC S. Badgett |
33177 | 1/21/2005 |
Comments on the SCAQMD's Proposed Permit for the Riverside Energy Resources Center, SCAQMD Application No. 426694, Facility ID 139796 and (2) Notice of CURE's Intent to Sue the SCAQMD for Violations of the Clean Air Act - POS
16 page(s)
| | Scaqmd/Wallerstein/mueller/cec/docket Unit | Adams Broadwell Joseph & Cardozo/Joseph |
33176 | 1/21/2005 |
Notice of CURE's Intent to Sue the City of Riverside for Violations of the Clean Air Act - POS
25 page(s)
| | City Of Riverside/Loveridge/evans/wright/cec/docke | Adams Broadwell Joseph & Cardozo/Joseph |
32964 | 12/21/2004 |
Riverside Energy Resource Center-Application for Small Power Plant Exemption Riverside County. And POS
84 page(s)
| | Dockets | Hearing Office |
32953 | 12/21/2004 |
Permit to Operate.
107 page(s)
| | J. Reede/Cec/docket Unit | South Coast Aqmd/P. Mueller |
32937 | 12/17/2004 |
Acknowledgement letter that CEC has complied with the State Clearinghouse review requirements for draft environmental documents
2 page(s)
| | CEC/Reede/docket Unit | Governor's Office Of Planning And Research/Roberts |
32935 | 12/15/2004 |
Notice of Adoption of a Mitigated Negative Declaration & Small Power Plant Exemption Decision.
15 page(s)
| | CEC/Docket Unit | CEC Cec |
32933 | 12/15/2004 |
Mitigated Negative Declaration
3 page(s)
| | CEC/Docket Unit | CEC/Keese |
32932 | 12/15/2004 |
Commission Adoption Order
1 page(s)
| | CEC/Docket Unit | CEC/Commissioners |
32925 | 12/14/2004 |
CURE's 12/14/04 Letter to Commissioners regarding changes made in the Errata to the PMPD - POS
8 page(s)
| | CEC/Docket Unit | Adams Broadwell Joseph & Cardozo/Heeley |
32918 | 12/13/2004 |
Errata to the PMPD and Response to Comments - POS
10 page(s)
| | CEC/Docket Unit | CEC/Pfannenstiel/geesman |
32897 | 12/7/2004 |
Comments Regarding the Proposed Decision
3 page(s)
| | CEC/Dockets | Abc/Tennis |
32895 | 12/7/2004 |
Comments of the CURE for Reliable Energy on the Proposed Decision - POS
16 page(s)
| | CEC/Dockets | Adams Broadwell Joseph & Cordozo/Joseph |
32894 | 12/7/2004 |
Comments is to request the additional mitigation measures be adopted as part of the approval for Riverside's power plant application
1 page(s)
| | CEC/Commissioners/dockets | Friends Of Riverside's Hills |
32888 | 12/6/2004 |
Comments on the Proposed Decision. POS
15 page(s)
| | CEC/Docket Unit | Cure/Adams, Broadwell Joseph & Cardozo |
32887 | 12/6/2004 |
Applicant's Comments to the Small Power plant Exemption Decision and Mitigated Negative Declaration - POS
7 page(s)
| | CEC/Dockets | Allan Thompson, Esq. |
32863 | 12/2/2004 |
Determination of No Hazard to Air Navigation.
20 page(s)
| | CEC/Docket Unit | Federal Aviation Administration |
32862 | 12/2/2004 |
Notice of Intent to Adopt Mitigated Negative Declaration & Proposed Small Power Plant Exemption Decision by CEC.
2 page(s)
| | CEC/Docket Unit | D. Cohen, Dept Of Transportation |
32852 | 12/1/2004 |
Staff PMPD Comments. POS
7 page(s)
| | CEC/Docket Unit | CEC/J. Reede |
32743 | 11/15/2004 |
Proposed Decision and Notice of Intent to Adopt a Mitigated Negative Declaration on the Application for an SPPE for the Riverside project - POS
538 page(s)
| | CEC/Docket Unit | CEC/Pfannenstiel/geesman |
32742 | 11/16/2004 |
Notice of Intent to Adopt a Mitigated Negative Declaration & Proposed SPPE Decision by CEC - POS
6 page(s)
| | Opr/California Resources Agency/cec Docket Unit | CEC/Reede |
32739 | 11/15/2004 |
Notice of Availability of the Proposed Decision/Notice of Intent to Adopt a Mitigated Negative Declaration and Notice of Committee Conference and Notice of Commission Hearing
4 page(s)
| | County Of Riverside/County Clerk/cec/docket Unit | CEC/Fay |
32737 | 11/15/2004 |
Notice of Availability of the Proposed Decision/Notice of Intent to Adopt a Mitigated Negative Declaration and Notice of Committee Conference and Notice of Commission Hearing
3 page(s)
| | CEC/Docket Unit | CEC/Pfannenstiel/geesman |
32651 | 11/4/2004 |
ABC's Comments to the 2005 IEPR
28 page(s)
| | CEC/Docket | Abc/Tennis |
32649 | 11/4/2004 |
Response to Comments regarding CURE dated August 10, 2004
11 page(s)
| | Associated Builders Adn Contractors/Tennis | CEC/Therkelsen |
32456 | 10/12/2004 |
Comments on the Riverside decision.
1 page(s)
| | Gary Fay | Terry O'brien |
32439 | 10/6/2004 |
Approval of Engineering Procurement and Construction Contract between the City of Riverside and the Industrial Company for the Riverside Energy Resource Center
2 page(s)
| | Board Of Public Utilities/Cec/docket Unit | City Of Riverside Public Utilities |
32438 | 10/6/2004 |
Approval of Engineering Procurement and Construction Contract between the City of Riverside and the Industrial Company for the Riverside Energy Resource Center
3 page(s)
| | Honorable Mayor And City Council/Cec/docket Unit | City Of Riverside/Evans/caravalho/priamos/mason |
32434 | 10/6/2004 |
Assemblyman Benoit's Comments to the City of Riverside's SPPE
2 page(s)
| | CEC/Pfannenstiel | Assemblymember John J. Benoit |
32431 | 10/5/2004 |
CURE's Reply Brief
54 page(s)
| | CEC/Docket | Adams Broadwell, Joseph & Cardozo/Brazil |
32426 | 10/4/2004 |
Staff's Reply Brief
23 page(s)
| | CEC/Docket | CEC/Decarlo |
32425 | 10/4/2004 |
Applicant's Reply Brief
20 page(s)
| | CEC/Docket | Allan J. Thompson/Thompson |
32421 | 10/4/2004 |
Reply Brief of the California Unions for Reliable Energy
53 page(s)
| | CEC/Docket Unit | Cure/Joseph/peesapati |
32412 | 10/1/2004 |
Minutes of Regular Meeting of the City Council
25 page(s)
| | CEC/Docket Unit | City Of Riverside City Council |
32411 | 10/1/2004 |
Minutes of Regular Meeting of the Board of Public Utilities
7 page(s)
| | CEC/Docket Unit | City Of Riverside Board Of Public Utilities/Evans |
32377 | 9/22/2004 |
Energy Commission Staff's Opening Brief. POS
40 page(s)
| | CEC/Docket | CEC/L. Decarlo |
32373 | 9/22/2004 |
Opening Brief. POS
56 page(s)
| | CEC/Docket | Cure/Adams Broadwell Joseph & Cardozo |
32372 | 9/22/2004 |
MRI Report, Prepared by Midwest Research Institute, dated March 29, 1995.
160 page(s)
| | CEC/Docket | Riverside/A. Thompson, Esq |
32371 | 9/22/2004 |
Applicant's Opening Brief. POS
23 page(s)
| | CEC/Docket | Riverside/A. Thompson, Esq. |
32237 | 9/2/2004 |
Comments on the Final Initial Study for the Riverside Project - POS
4 page(s)
| | CEC/Reede/dockets | Native American Heritage Commission/Gaubatz |
32213 | 8/26/2004 |
Committee Determination upon which topics it will receive Evidence
1 page(s)
| | CEC/Docket | CEC/Fay |
32202 | 8/25/2004 |
Submittal of Noise Reports of Conversation & Emails. POS
8 page(s)
| | CEC/Docket | CEC Cec |
32201 | 8/25/2004 |
Energy Commission Staff's Offer of a Proposed Hearing Schedule. POS
5 page(s)
| | CEC/Docket | CEC Cec |
32197 | 8/26/2004 |
Response and Comments re: "intervenor" and licensing processes in the 2005 Integrated Energy Policy Report.
4 page(s)
| | CEC/Docket List | Assemblymember Dave Cox |
32196 | 8/26/2004 |
Request for the 2005 Integrated Energy Policy Report investigate the abuse of the permitting process by special interest groups with primary objectives unrelated to environmental protection.
28 page(s)
| | CEC/Docket | Abc |
32191 | 8/26/2004 |
Response of CURE to Staff's & Applicant's Proposed Hearing Schedules. POS
6 page(s)
| | CEC/Docket | Cure/Attorneys For Cure |
32187 | 8/26/2004 |
Documents received from LOR in re: to the additional silt samples. POS
7 page(s)
| | CEC/Docket | Riverside/A. J. Thompson, Esq. |
32171 | 8/23/2004 |
Staff's Supplemental Air Quality and Geology Testimony
102 page(s)
| | CEC/Docket | CEC/Decarlo |
32143 | 8/20/2004 |
Energy Commission Staff's Response To Testimony Filed On August 13, 2004, by CURE & the Applicant. POS
16 page(s)
| | CEC/Docket | CEC Cec |
32140 | 8/20/2004 |
Revised & Updated Prehearing Statement & Prepared Rebuttal Testimony. POS
8 page(s)
| | CEC/Docket | Riverside/Allan J. Thompson, Esq. |
32123 | 8/13/2004 |
Testimony of John Baldwin. POS
7 page(s)
| | CEC/Docket | Cure/Adams Broadwell Joseph & Cardozo |
32112 | 8/17/2004 |
Letters from the Public./POS
8 page(s)
| | Riverside Pos | CEC/Reede |
32106 | 8/13/2004 |
Updated Estimates of Hearing Time of CURE. POS
6 page(s)
| | CEC/Docket | Cure/Adams Broadwell Joseph & Cardozo |
32105 | 8/13/2004 |
Testimony of John Baldwin. POS
7 page(s)
| | CEC/Docket | Cure/Adams Broadwell Joseph & Cardozo |
32104 | 8/13/2004 |
Testimony of Camille Sears on Behalf of CURE Energy; and Modeling Files (disk). POS
21 page(s)
| | CEC/Docket | Cure/Adams Broadwell Joseph & Cardozo |
32103 | 8/13/2004 |
Directs Testimonies of D. Wieland; K. Lany; J. Johnston; B. Arnold; K. Waller; D. Clark; J. Baker; S. Badgett; D. McCann - POS
184 page(s)
| | CEC/Dockets | Allan Thompson, Esq. |
32102 | 8/13/2004 |
Figure 2 - Riverside Energy Resource Center Annual PM10 Impacts from On-Site Construction Activities Emission Rate Source: FIS Air Quality Impact Analysis
2 page(s)
| | CEC/Dockets | Riverside Energy |
32101 | 8/13/2004 |
Testimony of John Baldwin, Senior Geologist
3 page(s)
| | CEC/Dockets | William Lettis & Associates, Inc./Baldwin |
32100 | 8/13/2004 |
Testimony of Dr. Phyllis Fox and Dr. Petra Pless on Behalf of the California Unions for Reliable Energy(65 pgs); Exhibits to Fox & Pless Testimony (883 pg); cd of PM 10. POS
948 page(s)
| | CEC/Dockets | Cure/Adams Broadwell Joseph & Cardozo |
32099 | 8/13/2004 |
Request for Confidentiality: Riverside Energy Center/POS
4 page(s)
| | Allan J. Thompson | CEC/Deleon |
32089 | 8/11/2004 |
Initial Study for Certification for a small power plant exemption for the Riverside Energy Resource Center (RERC)
5 page(s)
| | CEC/Dockets/reede | Dept Of Toxic Substances Control/Holmes |
32088 | 8/11/2004 |
Letter supporting the approval of the City of Riverside Public Utilities' application to construct the proposed 96-megawatt Riverside Energy Resource Center plant.
4 page(s)
| | CEC/Dockets/reede | Alvord Unified School Dist/Tucker |
32066 | 8/9/2004 |
CURE Data Requests Set 4 (Nos. 60-93)/POS
27 page(s)
| | CEC/Dockets/reede | Allan J. Thompson, Esq. |
32018 | 8/3/2004 |
Document Handling
2 page(s)
| | Librarian/Dockets | CEC/Richins |
32017 | 8/4/2004 |
Final Initial Study for the Riverside Public Utilities Application
1 page(s)
| | Agency Distribution List/Dockets | CEC/Richins |
32016 | 8/3/2004 |
Additional ROC References - POS
14 page(s)
| | CEC/Reede/dockets | Aspen/Walters |
31992 | 7/30/2004 |
Notice of Evidentiary Hearing - August 5, Sacramento; August 30 and September 1, 2004, Riverside - POS
11 page(s)
| | CEC/Dockets | CEC/Pfannenstiel/geesman |
31991 | 7/29/2004 |
Notice of Availability Final Initial Study
3 page(s)
| | CEC/Dockets | CEC/Richins |
31988 | 8/2/2004 |
Final Initial Study - Air Quality. POS
73 page(s)
| | CEC/Docket | CEC Cec |
31987 | 8/2/2004 |
REVISED Construction Emission Inventory & Air Quality Impact Assessment. POS
55 page(s)
| | CEC/Docket | Riverside/A. Thompson, Esq. |
31981 | 7/29/2004 |
Direct Testimonies
21 page(s)
| | CEC/Docket | Riverside/A. Thompson |
31978 | 7/28/2004 |
Motion of The CA Unions For Reliable Energy to Convert This Proceeding to an Application for Certification and Comments on the Staff's Draft Initial Study. A cd of Construction Related Air Modeling Files also enclosed. POS
311 page(s)
| | CEC/Docket | Riverside/Adams Broadwell Joseph & Cardozo |
31974 | 7/28/2004 |
Plot Plan to replace Figure 2 in the Project Description section of the Draft Initial Study. POS
5 page(s)
| | CEC/Docket | Riverside/A. Thompson, Esq. |
31970 | 7/27/2004 |
Emission Offset Requirements for the City of Riverside Public Utilities Department (04-SPPE-1), ACMD Facility ID No. 139796/POS
20 page(s)
| | CEC/Dockets/reede | Scaqmd/Pang Mueller |
31969 | 7/27/2004 |
ROC - Discussion on their report, the Riverside Airport Land Use Commission/POS
4 page(s)
| | CEC/Dockets/flores | Jackie Gonzales |
31968 | 7/27/2004 |
ROC - Discussion on flight patterns at the Riverside Airport/POS
4 page(s)
| | CEC/Dockets/flores | Jackie Gonzales |
31967 | 7/27/2004 |
ROC - Socioeconomic questions in regard to the Riverside SPPE/POS
4 page(s)
| | CEC/Dockets/diamond | Kevin Lincoln/David Clark |
31966 | 7/28/2004 |
Energy Commission Staff's Motion to Produce Exhibits/POS
5 page(s)
| | CEC/Dockets | CEC/Decarlo |
31964 | 7/27/2004 |
CURE's Motion to Convert Proceeding to an Application for Certification and Comments on the staff's Draft Initial Study
87 page(s)
| | CEC/Docket | Cure/Joseph |
31958 | 7/23/2004 |
Preliminary Comments (Construction-Related Air Quality Impacts). POS
25 page(s)
| | CEC/J. Reede/dockets | Riverside/Adams Broadwell Joseph & Cardozo |
31957 | 7/23/2004 |
Letter from Department of the Army informing the CEC that a permit may be necessary for the Riverside Power Plant. POS
5 page(s)
| | CEC/J. Reede/dockets | Dept Of The Army |
31956 | 7/23/2004 |
Summary of Expenditures by Year. POS
13 page(s)
| | CEC/Dockets | Riverside |
31955 | 7/23/2004 |
Order to Close Discovery. POS
4 page(s)
| | CEC/Dockets | CEC Cec |
31940 | 7/23/2004 |
Motion to Produce Exhibits. POS
7 page(s)
| | CEC/Dockets | Riverside/Allan J. Thompson |
31933 | 7/21/2004 |
Staff's Prehearing Conference Statement - POS
6 page(s)
| | CEC/Docket | CEC/Decarlo |
31932 | 7/21/2004 |
CURE's Prehearing Conference Statement - POS
61 page(s)
| | CEC/Docket | Cure/Joseph |
31931 | 7/21/2004 |
Applicant's Prehearing Conference Statement - POS
95 page(s)
| | CEC/Docket | Allan J. Thompson |
31927 | 7/21/2004 |
Email regarding the removal of site boulders for the Riverside project - POS
4 page(s)
| | CEC/Reede | Power Engineers/Lincoln |
31921 | 7/20/2004 |
Non-Applicability Determination for Prevention of Significant Deterioration Program - POS
5 page(s)
| | Scec/Lany | Usepa/Rios |
31920 | 7/20/2004 |
Comments to the Draft Initial Study - POS
5 page(s)
| | CEC/Reede | Department Of Transportation/Cohen |
31914 | 7/19/2004 |
Applicant Motion to Close Discovery
6 page(s)
| | CEC/Docket | Allan J. Thompson, Esq. |
31910 | 7/16/2004 |
Email report of conversation between Lyle Hill, Riverside and Demetrio Bucaneg, CEC on June 28, 2004, regarding the starting base case for the power flow analysis.
4 page(s)
| | Riverside/Hill | CEC/Bucaneg |
31909 | 7/16/2004 |
Memorandum to James Reede regarding Data Response #29 Received 6-25-04
4 page(s)
| | CEC/Reede | CEC/Torres |
31908 | 7/16/2004 |
Report of Conversation between Brian Arnold, SWCA and Melinda Dorin, CEC on June 22, 2004, regarding The USFWS and CDFG permits for the Habitat Conservation Plan
4 page(s)
| | CEC/Docket | CEC/Dorin |
31907 | 7/16/2004 |
Report of Conversation between Eric Porter, USFWS and Melinda Dorin, CEC on May 27, 2004 regarding Riverside SPPE potential Impacts
4 page(s)
| | CEC/Docket | CEC/Dorin |
31906 | 7/19/2004 |
Report of Conversation between Karl Lany, SCEC and Will Walters, CEC on June 24, 2004, regarding RERC-Definition of Maintenance Hours.
5 page(s)
| | CEC/Docket | CEC/Walter |
31905 | 6/16/2004 |
Report of Conversation between Ted Kowalczyk, SCAQMD and Will Walters, CEC on June 16, 2004, regarding Riverside WWTP Cogen System
5 page(s)
| | CEC/Docket | CEC/Walters |
31904 | 7/16/2004 |
Report of Conversation between Dorothy Torres, CEC, and Patrick Maxon, Archaeologist w/SWCA; re: Data Responses. POS
6 page(s)
| | CEC/Dockets | CEC/D. Torres |
31903 | 7/16/2004 |
Report of Conversation between Dorothy Torres, CEC, and Patrik Maxon & Jim Steely, Archawologist & historian with SWCA; re: Data Responses. POS
4 page(s)
| | CEC/Dockets | CEC/D. Torres |
31902 | 7/16/2004 |
Report of Conversation between Melinda Dorin, CEC, and Ron Baxter; re: proposed Riverside Energy Center. POS
4 page(s)
| | CEC/Dockets | CEC/M. Dorin |
31901 | 7/16/2004 |
Comments re: location & potential impact to Riverside Municipal Airport of the proposed Small Power Plant. POS
5 page(s)
| | CEC/J. Reede/dockets | Riverside/M. Kranenburg |
31890 | 7/8/2004 |
Draft Initial Study for the Riverside Project - POS
336 page(s)
| | CEC/Docket Unit | CEC Cec |
31889 | 7/14/2004 |
Notice of Prehearing Conference. POS
7 page(s)
| | CEC/Dockets | CEC Cec |
31883 | 7/12/2004 |
CURE Data Requests Set 3. POS
92 page(s)
| | CEC/Dockets | Cure |
31882 | 7/12/2004 |
Supplemental Responses (Traffic & Transportation) to CEC Data Requests. POS
7 page(s)
| | CEC/Dockets | Riverside |
31881 | 7/12/2004 |
Request for Confidentiality: submission of an Application for Confidentiality.
2 page(s)
| | CEC/Dockets | CEC/F. Deleon |
31877 | 7/12/2004 |
CURE Data Requests, Set Four. POS
22 page(s)
| | CEC/Dockets | Riverside/Adams Broadwell Joseph & Cardozo |
31867 | 7/8/2004 |
Document Handling for the Riverside Public Utilities Application
3 page(s)
| | Librarian/Dockets | CEC/Richins |
31866 | 7/8/2004 |
Request for Agency Comments on the Draft Initial Study
3 page(s)
| | Agency Distribution List | CEC/Richins |
31863 | 7/8/2004 |
Notice of Availability - Draft Initial Study for Riverside Public Utilities
3 page(s)
| | CEC/Dockets | CEC/Richins |
31861 | 7/7/2004 |
Response to Applicant's Request for Confidential Designation of Documents - POS
7 page(s)
| | CEC/Dockets | Cure/Heeley/peesapati |
31859 | 7/8/2004 |
Cultural Resources Literature Review and Pedestrian Reconnaissance for Riverside.
49 page(s)
| | CEC/Dockets | Power Engineers, Inc/Maxon/steely |
31853 | 7/7/2004 |
Document emails regarding 101414 RPU Riverside ERC #1. Copy of FAA Application Submittal/ #2. ERC Steel Poles/ #3. Transmission line Routing Info. to James Reede frok klincoln/POS
6 page(s)
| | CEC/Dockets/reede | Klincoln |
31851 | 7/7/2004 |
Response to CURE Data Requests Set 2./POS
54 page(s)
| | CEC/Dockets | Allan J. Thompson |
31848 | 7/7/2004 |
July 2, 2004 letter re: Riverside Energy Resources Center's Failure to Obtain Valid Offsets. POS
23 page(s)
| | CEC/J. Reede/dockets | Riverside/Adams Broadwell Joseph & Cardozo |
31842 | 7/2/2004 |
Draft Initial Study Workshop, Thursday, July 15, 2004. POS
5 page(s)
| | CEC/Dockets | CEC/J. Reede |
31832 | 6/30/2004 |
Riverside Energy Resource Center, CEC, RERC PROCESS WASTE WATER/RERC STORM WATER/CONSTRUCTION DEWATERING/WATER RECYCLING REQUIREMENTS./POS
7 page(s)
| | CEC/Dockets/reede | Power Engineers/Robertson/lincoln |
31817 | 6/28/2004 |
"Will Serve" letter from Mr. Bob Gill, PM, City of Riverside Public Utilities (Water Resources), and Sensitive Receptors Within A Six Mile Radius of the Proposed Project (Air Quality)./POS
13 page(s)
| | CEC/Dockets | Allan J. Thompson, Esq. |
31816 | 6/28/2004 |
Response to CURE Data Requests Set 1./POS
111 page(s)
| | CEC/Dockets | Allan J. Thompson, Esq. |
31807 | 6/25/2004 |
Riverside Energy Resource Center Supplemental Data Response - POS
25 page(s)
| | CEC/Dockets | Rpu/Thompson |
31806 | 6/25/2004 |
Confidential Filing
1 page(s)
| | CEC/Dockets | Rpu/Thompson |
31803 | 6/25/2004 |
Correspondence to Suma Pessapati from Allan J. Thompson dated June 23, 2004 - POS
5 page(s)
| | CEC/Dockets | Rpu/Thompson |
31787 | 6/22/2004 |
Service of All Documents Submitted in Riverside Energy Resources Center
2 page(s)
| | Rpu/Thompson/dockets | Adams Broadwell Joseph & Cordozo/Peesapati |
31786 | 6/22/2004 |
Response of the City of Riverside Public Utilities to the CURE Data Requests of June 9, 2004 and CURE Data Requests of June 11, 2004 - POS
6 page(s)
| | CEC/Dockets | Rpu/Thompson |
31783 | 6/14/2004 |
Revised Hard Copies of the Air Quality & Public Health Section and Appendices
268 page(s)
| | CEC/Reede/dockets | City Of Riverside Public Utilities/Thompson |
31780 | 6/21/2004 |
Report of Conversation with Patrick Maxon, Archaeologist with SWCA re: Data Responses - POS
7 page(s)
| | CEC/Dockets | CEC/Torres |
31779 | 6/21/2004 |
Permit to Construct Applications - Proposed 100 MW Power Plant to be Located Riverside Energy Resource Center - POS
4 page(s)
| | CEC/Dockets | Scaqmd/Coats |
31778 | 6/21/2004 |
Report of Conversation with Ron Baxter re: Discussed in Proposed Riverside Energy Center - POS
5 page(s)
| | CEC/Dockets | CEC/Dorin |
31760 | 6/14/2004 |
CD of Air Dispersion Modeling Files June 8, 2004
1 page(s)
| | CEC/Dockets | Riverside Erc/A. Thompson |
31758 | 6/14/2004 |
Response of the City of Riverside Public Utilities to the CURE Data Requests of June 4, 2004
5 page(s)
| | CEC/Dockets | Riverside Erc/A. Thompson |
31731 | 6/14/2004 |
Geotechnical Investigation Acorn Generation Project--Riverside (155pgs); included are the Results of Additional Subsurface Analysis (38pgs).
193 page(s)
| | CEC/J. Reede/dockets | Riverside Erc/Geotechnical Group |
31727 | 6/14/2004 |
Comments of the Riverside Application for Certification for a small power plant exemption. POS
8 page(s)
| | CEC/J. Reede/dockets | Dept. Of Toxic Substances Control/G. Holmes |
31726 | 6/14/2004 |
City of Riverside presented one copy of the Project Labor Agreement (PLA), & the Maintenance Agreement (MA) for the Riverside Energy Resource Center.
50 page(s)
| | CEC/J. Reede/dockets | Riverside Erc/Steve Badgett |
31725 | 6/14/2004 |
Agency Distribution for "Supplemental Material."
1 page(s)
| | CEC/Dockets | CEC/J. Reede |
31724 | 6/14/2004 |
Librarian letter of "Supplemental Material."
1 page(s)
| | CEC/Dockets | CEC/J. Reede |
31723 | 6/14/2004 |
Riverside Responses to CEC Data Requests 1-72 (214pg).
214 page(s)
| | CEC/Dockets | Rerc/Thompson |
31721 | 6/14/2004 |
Revised Public Health section to the SPPE & Appendix A--Aqueous Ammonia Hazard Assessment Attachments (10pgs).
18 page(s)
| | CEC/Docket | Rerc/Thompson |
31720 | 6/14/2004 |
Revised Air Quality section to the SPPE (Environmental Considerations-64pgs)+Appendix A-24pg)+(Appendix B-27pg)+(Appendix C-4pgs)+(Appendix D-23pg)+(Appendix E-9pg)+(Appendix F-18pg)+(Appendix G-26pg)+(Appendix H-18pg)+(Appendix I-9pg)+(Appendix J-45pg).
268 page(s)
| | CEC/Docket | Rerc/Thompson |
31715 | 6/14/2004 |
CURE Data Requests Set 3. POS
14 page(s)
| | CEC/Dockets | Adams, Broadwell, Joseph & Cardozo |
31708 | 6/10/2004 |
Email ROC between James Reede and Suma Peesapati regarding numbering of Data Requests
1 page(s)
| | Adams Broadwell Joseph & Cardozo/Peesapati | CEC/Reede |
31686 | 6/10/2004 |
CURE Data Requests Set Two (Nos. 13-15) - POS
9 page(s)
| | CEC/Docket | Adams Broadwell Joseph & Cardozo/Heeley |
31685 | 6/10/2004 |
Errata-CURE Data Request, Set One - POS
20 page(s)
| | Powers Engineers/Tateosian/lincoln | Adams Broadwell Joseph & Cardozo |
31678 | 6/9/2004 |
Riverside Energy Project, Proof of Service List, Docket No. 04-SPPE-1, current as of June 9, 2004.
4 page(s)
| | All Parties | CEC/Hearing Advisor's Office/fontanilla |
31667 | 6/8/2004 |
Phase I Environmental Site Assessment for Acorn Generation Project
95 page(s)
| | CEC/Docket | Power Engineers/Lincoln |
31652 | 6/7/2004 |
CURE Data Requests, Set One (1 - 12b)
21 page(s)
| | Power Engineers/Tateosian/lincoln | Adams Broadwell Joseph & Cardozo/Peesapati |
31639 | 6/3/2004 |
Data Response Workshop Riverside Energy Resource Center/POS
5 page(s)
| | CEC/Dockets | CEC/Pfannenstiel |
31621 | 6/1/2004 |
Comments on the 1st round data requests to the applicant./POS
5 page(s)
| | CEC/Reede | California Regional Water Quality Control Board/Ad |
31613 | 5/28/2004 |
Scheduling Order - POS
4 page(s)
| | CEC/Docket Unit | CEC/Pfannenstiel/geesman |
31598 | 5/26/2004 |
Order Granting Petition To Intervene to CURE C/O Adams Broadwell Joseph & Cardoxo
3 page(s)
| | CEC/Docket | CEC/Pfannensteil/geesman |
31588 | 5/25/2004 |
Electric power transmission lines maintained by power companies may or may not be hazardous to humans.
5 page(s)
| | CEC/Reede/dockets Unit | Riverside Unified School District/Dixon |
31527 | 5/18/2004 |
Petition to Intervene by California Unions for Reliable Energy - POS
7 page(s)
| | CEC/Dockets | Adams Broadwell Joseph & Cardozo/Joseph |
31495 | 5/14/2004 |
1st Round Data Requests for Riverside Energy Resource Center. POS
28 page(s)
| | CEC/Stephen H. Badgett/dockets | CEC/J. Reede |
31493 | 5/14/2004 |
Issues Identification Report for Riverside Energy Resource Center Project. POS
11 page(s)
| | CEC/Dockets | CEC/Commissioners Pfannenstiel & Geesman |
31469 | 5/13/2004 |
Resolution No: 04-0505-03 - Approving the selection of a Siting Committee for Riverside
1 page(s)
| | CEC/Docket | CEC/Keese |
31448 | 5/12/2004 |
Notice of Public Informational Hearing and Site Visit - POS
8 page(s)
| | CEC/Docket | CEC/Pfannenstiel/geesman |
31426 | 5/10/2004 |
Data Request Workshop - POS
2 page(s)
| | CEC/Docket | CEC/Pfannenstiel |
31384 | 5/5/2004 |
City of Riverside - - Circuit Breaker Stress Study Acorn Generation Project Final Report, prepared by POWER Engineers.
17 page(s)
| | CEC/Dockets | City Of Riverside |
31344 | 4/29/2004 |
Notice of Receipt of the AFC
3 page(s)
| | Interested Parties/Docket | CEC/Richins |
31343 | 4/29/2004 |
Document Handling for the AFC
3 page(s)
| | Library List/Docket | CEC/Richins |
31342 | 4/29/2004 |
Request for Agency Participation in the review of the AFC
2 page(s)
| | Agency List/Docket | CEC/Richins |
31337 | 4/29/2004 |
Application for Certification for Small Power Plant Exemption
627 page(s)
| | CEC/Therkelsen/docket | City Of Riverside/Badgett |
1855-0 | 9/13/2004 |
Evidentiary Hearing
355 page(s)
| | | CEC |
1852-0 | 9/2/2004 |
Evidentiary Hearing
136 page(s)
| | | CEC |
1844-0 | 8/12/2004 |
Evidentiary Hearing
88 page(s)
| | | CEC |
1842-0 | 8/4/2004 |
Prehearing Conference
89 page(s)
| | | CEC |