Docket Log

Docket: 04-SPPE-01
Project Title: Riverside Resource Center (RERC) Project / 40 MW/ Located within the city of Riverside/ Applicant: City of Riverside Public Utilities
Generated On: 4/16/2014 1:39:50 AM

TN #Docketed DateDocument TitleExhibit #ToFrom
342225/5/2005Project Close Out Riverside Energy Resource Center, 04-SPPE-1
Project Close Out Riverside Energy Resource Center, 04-SPPE-1
3 page(s)
 Docket UnitCEC S. Badgett
331761/21/2005Notice of CURE's Intent to Sue the City of Riverside for Violations of the Clean Air Act - POS
Notice of CURE's Intent to Sue the City of Riverside for Violations of the Clean Air Act - POS
25 page(s)
 City Of Riverside/Loveridge/evans/wright/cec/dockeAdams Broadwell Joseph & Cardozo/Joseph
331771/21/2005Comments on the SCAQMD's Proposed Permit for the Riverside Energy Resources Center, SCAQMD Application No. 426694, Facility ID 139796 and (2) Notice of CURE's Intent to Sue the SCAQMD for Violations of the Clean Air Act - POS
Comments on the SCAQMD's Proposed Permit for the Riverside Energy Resources Center, SCAQMD Application No. 426694, Facility ID 139796 and (2) Notice of CURE's Intent to Sue the SCAQMD for Violations of the Clean Air Act - POS
16 page(s)
 Scaqmd/Wallerstein/mueller/cec/docket UnitAdams Broadwell Joseph & Cardozo/Joseph
3295312/21/2004Permit to Operate.
Permit to Operate.
107 page(s)
 J. Reede/Cec/docket UnitSouth Coast Aqmd/P. Mueller
3296412/21/2004Riverside Energy Resource Center-Application for Small Power Plant Exemption Riverside County. And POS
Riverside Energy Resource Center-Application for Small Power Plant Exemption Riverside County. And POS
84 page(s)
 DocketsHearing Office
3293712/17/2004Acknowledgement letter that CEC has complied with the State Clearinghouse review requirements for draft environmental documents
Acknowledgement letter that CEC has complied with the State Clearinghouse review requirements for draft environmental documents
2 page(s)
 CEC/Reede/docket UnitGovernor's Office Of Planning And Research/Roberts
3293212/15/2004Commission Adoption Order
Commission Adoption Order
1 page(s)
 CEC/Docket UnitCEC/Commissioners
3293312/15/2004Mitigated Negative Declaration
Mitigated Negative Declaration
3 page(s)
 CEC/Docket UnitCEC/Keese
3293512/15/2004Notice of Adoption of a Mitigated Negative Declaration & Small Power Plant Exemption Decision.
Notice of Adoption of a Mitigated Negative Declaration & Small Power Plant Exemption Decision.
15 page(s)
 CEC/Docket UnitCEC Cec
3292512/14/2004CURE's 12/14/04 Letter to Commissioners regarding changes made in the Errata to the PMPD - POS
CURE's 12/14/04 Letter to Commissioners regarding changes made in the Errata to the PMPD - POS
8 page(s)
 CEC/Docket UnitAdams Broadwell Joseph & Cardozo/Heeley
3291812/13/2004Errata to the PMPD and Response to Comments - POS
Errata to the PMPD and Response to Comments - POS
10 page(s)
 CEC/Docket UnitCEC/Pfannenstiel/geesman
3289412/7/2004Comments is to request the additional mitigation measures be adopted as part of the approval for Riverside's power plant application
Comments is to request the additional mitigation measures be adopted as part of the approval for Riverside's power plant application
1 page(s)
 CEC/Commissioners/docketsFriends Of Riverside's Hills
3289512/7/2004Comments of the CURE for Reliable Energy on the Proposed Decision - POS
Comments of the CURE for Reliable Energy on the Proposed Decision - POS
16 page(s)
 CEC/DocketsAdams Broadwell Joseph & Cordozo/Joseph
3289712/7/2004Comments Regarding the Proposed Decision
Comments Regarding the Proposed Decision
3 page(s)
 CEC/DocketsAbc/Tennis
3288712/6/2004Applicant's Comments to the Small Power plant Exemption Decision and Mitigated Negative Declaration - POS
Applicant's Comments to the Small Power plant Exemption Decision and Mitigated Negative Declaration - POS
7 page(s)
 CEC/DocketsAllan Thompson, Esq.
3288812/6/2004Comments on the Proposed Decision. POS
Comments on the Proposed Decision. POS
15 page(s)
 CEC/Docket UnitCure/Adams, Broadwell Joseph & Cardozo
3286212/2/2004Notice of Intent to Adopt Mitigated Negative Declaration & Proposed Small Power Plant Exemption Decision by CEC.
Notice of Intent to Adopt Mitigated Negative Declaration & Proposed Small Power Plant Exemption Decision by CEC.
2 page(s)
 CEC/Docket UnitD. Cohen, Dept Of Transportation
3286312/2/2004Determination of No Hazard to Air Navigation.
Determination of No Hazard to Air Navigation.
20 page(s)
 CEC/Docket UnitFederal Aviation Administration
3285212/1/2004Staff PMPD Comments. POS
Staff PMPD Comments. POS
7 page(s)
 CEC/Docket UnitCEC/J. Reede
3274211/16/2004Notice of Intent to Adopt a Mitigated Negative Declaration & Proposed SPPE Decision by CEC - POS
Notice of Intent to Adopt a Mitigated Negative Declaration & Proposed SPPE Decision by CEC - POS
6 page(s)
 Opr/California Resources Agency/cec Docket UnitCEC/Reede
3273711/15/2004Notice of Availability of the Proposed Decision/Notice of Intent to Adopt a Mitigated Negative Declaration and Notice of Committee Conference and Notice of Commission Hearing
Notice of Availability of the Proposed Decision/Notice of Intent to Adopt a Mitigated Negative Declaration and Notice of Committee Conference and Notice of Commission Hearing
3 page(s)
 CEC/Docket UnitCEC/Pfannenstiel/geesman
3273911/15/2004Notice of Availability of the Proposed Decision/Notice of Intent to Adopt a Mitigated Negative Declaration and Notice of Committee Conference and Notice of Commission Hearing
Notice of Availability of the Proposed Decision/Notice of Intent to Adopt a Mitigated Negative Declaration and Notice of Committee Conference and Notice of Commission Hearing
4 page(s)
 County Of Riverside/County Clerk/cec/docket UnitCEC/Fay
3274311/15/2004Proposed Decision and Notice of Intent to Adopt a Mitigated Negative Declaration on the Application for an SPPE for the Riverside project - POS
Proposed Decision and Notice of Intent to Adopt a Mitigated Negative Declaration on the Application for an SPPE for the Riverside project - POS
538 page(s)
 CEC/Docket UnitCEC/Pfannenstiel/geesman
3264911/4/2004Response to Comments regarding CURE dated August 10, 2004
Response to Comments regarding CURE dated August 10, 2004
11 page(s)
 Associated Builders Adn Contractors/TennisCEC/Therkelsen
3265111/4/2004ABC's Comments to the 2005 IEPR
ABC's Comments to the 2005 IEPR
28 page(s)
 CEC/DocketAbc/Tennis
3245610/12/2004Comments on the Riverside decision.
Comments on the Riverside decision.
1 page(s)
 Gary FayTerry O'brien
3243410/6/2004Assemblyman Benoit's Comments to the City of Riverside's SPPE
Assemblyman Benoit's Comments to the City of Riverside's SPPE
2 page(s)
 CEC/PfannenstielAssemblymember John J. Benoit
3243810/6/2004Approval of Engineering Procurement and Construction Contract between the City of Riverside and the Industrial Company for the Riverside Energy Resource Center
Approval of Engineering Procurement and Construction Contract between the City of Riverside and the Industrial Company for the Riverside Energy Resource Center
3 page(s)
 Honorable Mayor And City Council/Cec/docket UnitCity Of Riverside/Evans/caravalho/priamos/mason
3243910/6/2004Approval of Engineering Procurement and Construction Contract between the City of Riverside and the Industrial Company for the Riverside Energy Resource Center
Approval of Engineering Procurement and Construction Contract between the City of Riverside and the Industrial Company for the Riverside Energy Resource Center
2 page(s)
 Board Of Public Utilities/Cec/docket UnitCity Of Riverside Public Utilities
3243110/5/2004CURE's Reply Brief
CURE's Reply Brief
54 page(s)
 CEC/DocketAdams Broadwell, Joseph & Cardozo/Brazil
3242110/4/2004Reply Brief of the California Unions for Reliable Energy
Reply Brief of the California Unions for Reliable Energy
53 page(s)
 CEC/Docket UnitCure/Joseph/peesapati
3242510/4/2004Applicant's Reply Brief
Applicant's Reply Brief
20 page(s)
 CEC/DocketAllan J. Thompson/Thompson
3242610/4/2004Staff's Reply Brief
Staff's Reply Brief
23 page(s)
 CEC/DocketCEC/Decarlo
3241110/1/2004Minutes of Regular Meeting of the Board of Public Utilities
Minutes of Regular Meeting of the Board of Public Utilities
7 page(s)
 CEC/Docket UnitCity Of Riverside Board Of Public Utilities/Evans
3241210/1/2004Minutes of Regular Meeting of the City Council
Minutes of Regular Meeting of the City Council
25 page(s)
 CEC/Docket UnitCity Of Riverside City Council
323719/22/2004Applicant's Opening Brief. POS
Applicant's Opening Brief. POS
23 page(s)
 CEC/DocketRiverside/A. Thompson, Esq.
323729/22/2004MRI Report, Prepared by Midwest Research Institute, dated March 29, 1995.
MRI Report, Prepared by Midwest Research Institute, dated March 29, 1995.
160 page(s)
 CEC/DocketRiverside/A. Thompson, Esq
323739/22/2004Opening Brief. POS
Opening Brief. POS
56 page(s)
 CEC/DocketCure/Adams Broadwell Joseph & Cardozo
323779/22/2004Energy Commission Staff's Opening Brief. POS
Energy Commission Staff's Opening Brief. POS
40 page(s)
 CEC/DocketCEC/L. Decarlo
322379/2/2004Comments on the Final Initial Study for the Riverside Project - POS
Comments on the Final Initial Study for the Riverside Project - POS
4 page(s)
 CEC/Reede/docketsNative American Heritage Commission/Gaubatz
321878/26/2004Documents received from LOR in re: to the additional silt samples. POS
Documents received from LOR in re: to the additional silt samples. POS
7 page(s)
 CEC/DocketRiverside/A. J. Thompson, Esq.
321918/26/2004Response of CURE to Staff's & Applicant's Proposed Hearing Schedules. POS
Response of CURE to Staff's & Applicant's Proposed Hearing Schedules. POS
6 page(s)
 CEC/DocketCure/Attorneys For Cure
321968/26/2004Request for the 2005 Integrated Energy Policy Report investigate the abuse of the permitting process by special interest groups with primary objectives unrelated to environmental protection.
Request for the 2005 Integrated Energy Policy Report investigate the abuse of the permitting process by special interest groups with primary objectives unrelated to environmental protection.
28 page(s)
 CEC/DocketAbc
321978/26/2004Response and Comments re: "intervenor" and licensing processes in the 2005 Integrated Energy Policy Report.
Response and Comments re: "intervenor" and licensing processes in the 2005 Integrated Energy Policy Report.
4 page(s)
 CEC/Docket ListAssemblymember Dave Cox
322138/26/2004Committee Determination upon which topics it will receive Evidence
Committee Determination upon which topics it will receive Evidence
1 page(s)
 CEC/DocketCEC/Fay
322018/25/2004Energy Commission Staff's Offer of a Proposed Hearing Schedule. POS
Energy Commission Staff's Offer of a Proposed Hearing Schedule. POS
5 page(s)
 CEC/DocketCEC Cec
322028/25/2004Submittal of Noise Reports of Conversation & Emails. POS
Submittal of Noise Reports of Conversation & Emails. POS
8 page(s)
 CEC/DocketCEC Cec
321718/23/2004Staff's Supplemental Air Quality and Geology Testimony
Staff's Supplemental Air Quality and Geology Testimony
102 page(s)
 CEC/DocketCEC/Decarlo
321408/20/2004Revised & Updated Prehearing Statement & Prepared Rebuttal Testimony. POS
Revised & Updated Prehearing Statement & Prepared Rebuttal Testimony. POS
8 page(s)
 CEC/DocketRiverside/Allan J. Thompson, Esq.
321438/20/2004Energy Commission Staff's Response To Testimony Filed On August 13, 2004, by CURE & the Applicant. POS
Energy Commission Staff's Response To Testimony Filed On August 13, 2004, by CURE & the Applicant. POS
16 page(s)
 CEC/DocketCEC Cec
321128/17/2004Letters from the Public./POS
Letters from the Public./POS
8 page(s)
 Riverside PosCEC/Reede
320998/13/2004Request for Confidentiality: Riverside Energy Center/POS
Request for Confidentiality: Riverside Energy Center/POS
4 page(s)
 Allan J. ThompsonCEC/Deleon
321008/13/2004Testimony of Dr. Phyllis Fox and Dr. Petra Pless on Behalf of the California Unions for Reliable Energy(65 pgs); Exhibits to Fox & Pless Testimony (883 pg); cd of PM 10. POS
Testimony of Dr. Phyllis Fox and Dr. Petra Pless on Behalf of the California Unions for Reliable Energy(65 pgs); Exhibits to Fox & Pless Testimony (883 pg); cd of PM 10. POS
948 page(s)
 CEC/DocketsCure/Adams Broadwell Joseph & Cardozo
321018/13/2004Testimony of John Baldwin, Senior Geologist
Testimony of John Baldwin, Senior Geologist
3 page(s)
 CEC/DocketsWilliam Lettis & Associates, Inc./Baldwin
321028/13/2004Figure 2 - Riverside Energy Resource Center Annual PM10 Impacts from On-Site Construction Activities Emission Rate Source: FIS Air Quality Impact Analysis
Figure 2 - Riverside Energy Resource Center Annual PM10 Impacts from On-Site Construction Activities Emission Rate Source: FIS Air Quality Impact Analysis
2 page(s)
 CEC/DocketsRiverside Energy
321038/13/2004Directs Testimonies of D. Wieland; K. Lany; J. Johnston; B. Arnold; K. Waller; D. Clark; J. Baker; S. Badgett; D. McCann - POS
Directs Testimonies of D. Wieland; K. Lany; J. Johnston; B. Arnold; K. Waller; D. Clark; J. Baker; S. Badgett; D. McCann - POS
184 page(s)
 CEC/DocketsAllan Thompson, Esq.
321048/13/2004Testimony of Camille Sears on Behalf of CURE Energy; and Modeling Files (disk). POS
Testimony of Camille Sears on Behalf of CURE Energy; and Modeling Files (disk). POS
21 page(s)
 CEC/DocketCure/Adams Broadwell Joseph & Cardozo
321058/13/2004Testimony of John Baldwin. POS
Testimony of John Baldwin. POS
7 page(s)
 CEC/DocketCure/Adams Broadwell Joseph & Cardozo
321068/13/2004Updated Estimates of Hearing Time of CURE. POS
Updated Estimates of Hearing Time of CURE. POS
6 page(s)
 CEC/DocketCure/Adams Broadwell Joseph & Cardozo
321238/13/2004Testimony of John Baldwin. POS
Testimony of John Baldwin. POS
7 page(s)
 CEC/DocketCure/Adams Broadwell Joseph & Cardozo
320888/11/2004Letter supporting the approval of the City of Riverside Public Utilities' application to construct the proposed 96-megawatt Riverside Energy Resource Center plant.
Letter supporting the approval of the City of Riverside Public Utilities' application to construct the proposed 96-megawatt Riverside Energy Resource Center plant.
4 page(s)
 CEC/Dockets/reedeAlvord Unified School Dist/Tucker
320898/11/2004Initial Study for Certification for a small power plant exemption for the Riverside Energy Resource Center (RERC)
Initial Study for Certification for a small power plant exemption for the Riverside Energy Resource Center (RERC)
5 page(s)
 CEC/Dockets/reedeDept Of Toxic Substances Control/Holmes
320668/9/2004CURE Data Requests Set 4 (Nos. 60-93)/POS
CURE Data Requests Set 4 (Nos. 60-93)/POS
27 page(s)
 CEC/Dockets/reedeAllan J. Thompson, Esq.
320178/4/2004Final Initial Study for the Riverside Public Utilities Application
Final Initial Study for the Riverside Public Utilities Application
1 page(s)
 Agency Distribution List/DocketsCEC/Richins
320168/3/2004Additional ROC References - POS
Additional ROC References - POS
14 page(s)
 CEC/Reede/docketsAspen/Walters
320188/3/2004Document Handling
Document Handling
2 page(s)
 Librarian/DocketsCEC/Richins
319878/2/2004REVISED Construction Emission Inventory & Air Quality Impact Assessment. POS
REVISED Construction Emission Inventory & Air Quality Impact Assessment. POS
55 page(s)
 CEC/DocketRiverside/A. Thompson, Esq.
319888/2/2004Final Initial Study - Air Quality. POS
Final Initial Study - Air Quality. POS
73 page(s)
 CEC/DocketCEC Cec
319927/30/2004Notice of Evidentiary Hearing - August 5, Sacramento; August 30 and September 1, 2004, Riverside - POS
Notice of Evidentiary Hearing - August 5, Sacramento; August 30 and September 1, 2004, Riverside - POS
11 page(s)
 CEC/DocketsCEC/Pfannenstiel/geesman
319817/29/2004Direct Testimonies
Direct Testimonies
21 page(s)
 CEC/DocketRiverside/A. Thompson
319917/29/2004Notice of Availability Final Initial Study
Notice of Availability Final Initial Study
3 page(s)
 CEC/DocketsCEC/Richins
319667/28/2004Energy Commission Staff's Motion to Produce Exhibits/POS
Energy Commission Staff's Motion to Produce Exhibits/POS
5 page(s)
 CEC/DocketsCEC/Decarlo
319747/28/2004Plot Plan to replace Figure 2 in the Project Description section of the Draft Initial Study. POS
Plot Plan to replace Figure 2 in the Project Description section of the Draft Initial Study. POS
5 page(s)
 CEC/DocketRiverside/A. Thompson, Esq.
319787/28/2004Motion of The CA Unions For Reliable Energy to Convert This Proceeding to an Application for Certification and Comments on the Staff's Draft Initial Study. A cd of Construction Related Air Modeling Files also enclosed. POS
Motion of The CA Unions For Reliable Energy to Convert This Proceeding to an Application for Certification and Comments on the Staff's Draft Initial Study. A cd of Construction Related Air Modeling Files also enclosed. POS
311 page(s)
 CEC/DocketRiverside/Adams Broadwell Joseph & Cardozo
319647/27/2004CURE's Motion to Convert Proceeding to an Application for Certification and Comments on the staff's Draft Initial Study
CURE's Motion to Convert Proceeding to an Application for Certification and Comments on the staff's Draft Initial Study
87 page(s)
 CEC/DocketCure/Joseph
319677/27/2004ROC - Socioeconomic questions in regard to the Riverside SPPE/POS
ROC - Socioeconomic questions in regard to the Riverside SPPE/POS
4 page(s)
 CEC/Dockets/diamondKevin Lincoln/David Clark
319687/27/2004ROC - Discussion on flight patterns at the Riverside Airport/POS
ROC - Discussion on flight patterns at the Riverside Airport/POS
4 page(s)
 CEC/Dockets/floresJackie Gonzales
319697/27/2004ROC - Discussion on their report, the Riverside Airport Land Use Commission/POS
ROC - Discussion on their report, the Riverside Airport Land Use Commission/POS
4 page(s)
 CEC/Dockets/floresJackie Gonzales
319707/27/2004Emission Offset Requirements for the City of Riverside Public Utilities Department (04-SPPE-1), ACMD Facility ID No. 139796/POS
Emission Offset Requirements for the City of Riverside Public Utilities Department (04-SPPE-1), ACMD Facility ID No. 139796/POS
20 page(s)
 CEC/Dockets/reedeScaqmd/Pang Mueller
319407/23/2004Motion to Produce Exhibits. POS
Motion to Produce Exhibits. POS
7 page(s)
 CEC/DocketsRiverside/Allan J. Thompson
319557/23/2004Order to Close Discovery. POS
Order to Close Discovery. POS
4 page(s)
 CEC/DocketsCEC Cec
319567/23/2004Summary of Expenditures by Year. POS
Summary of Expenditures by Year. POS
13 page(s)
 CEC/DocketsRiverside
319577/23/2004Letter from Department of the Army informing the CEC that a permit may be necessary for the Riverside Power Plant. POS
Letter from Department of the Army informing the CEC that a permit may be necessary for the Riverside Power Plant. POS
5 page(s)
 CEC/J. Reede/docketsDept Of The Army
319587/23/2004Preliminary Comments (Construction-Related Air Quality Impacts). POS
Preliminary Comments (Construction-Related Air Quality Impacts). POS
25 page(s)
 CEC/J. Reede/docketsRiverside/Adams Broadwell Joseph & Cardozo
319277/21/2004Email regarding the removal of site boulders for the Riverside project - POS
Email regarding the removal of site boulders for the Riverside project - POS
4 page(s)
 CEC/ReedePower Engineers/Lincoln
319317/21/2004Applicant's Prehearing Conference Statement - POS
Applicant's Prehearing Conference Statement - POS
95 page(s)
 CEC/DocketAllan J. Thompson
319327/21/2004CURE's Prehearing Conference Statement - POS
CURE's Prehearing Conference Statement - POS
61 page(s)
 CEC/DocketCure/Joseph
319337/21/2004Staff's Prehearing Conference Statement - POS
Staff's Prehearing Conference Statement - POS
6 page(s)
 CEC/DocketCEC/Decarlo
319207/20/2004Comments to the Draft Initial Study - POS
Comments to the Draft Initial Study - POS
5 page(s)
 CEC/ReedeDepartment Of Transportation/Cohen
319217/20/2004Non-Applicability Determination for Prevention of Significant Deterioration Program - POS
Non-Applicability Determination for Prevention of Significant Deterioration Program - POS
5 page(s)
 Scec/LanyUsepa/Rios
319067/19/2004Report of Conversation between Karl Lany, SCEC and Will Walters, CEC on June 24, 2004, regarding RERC-Definition of Maintenance Hours.
Report of Conversation between Karl Lany, SCEC and Will Walters, CEC on June 24, 2004, regarding RERC-Definition of Maintenance Hours.
5 page(s)
 CEC/DocketCEC/Walter
319147/19/2004Applicant Motion to Close Discovery
Applicant Motion to Close Discovery
6 page(s)
 CEC/DocketAllan J. Thompson, Esq.
319017/16/2004Comments re: location & potential impact to Riverside Municipal Airport of the proposed Small Power Plant. POS
Comments re: location & potential impact to Riverside Municipal Airport of the proposed Small Power Plant. POS
5 page(s)
 CEC/J. Reede/docketsRiverside/M. Kranenburg
319027/16/2004Report of Conversation between Melinda Dorin, CEC, and Ron Baxter; re: proposed Riverside Energy Center. POS
Report of Conversation between Melinda Dorin, CEC, and Ron Baxter; re: proposed Riverside Energy Center. POS
4 page(s)
 CEC/DocketsCEC/M. Dorin
319037/16/2004Report of Conversation between Dorothy Torres, CEC, and Patrik Maxon & Jim Steely, Archawologist & historian with SWCA; re: Data Responses. POS
Report of Conversation between Dorothy Torres, CEC, and Patrik Maxon & Jim Steely, Archawologist & historian with SWCA; re: Data Responses. POS
4 page(s)
 CEC/DocketsCEC/D. Torres
319047/16/2004Report of Conversation between Dorothy Torres, CEC, and Patrick Maxon, Archaeologist w/SWCA; re: Data Responses. POS
Report of Conversation between Dorothy Torres, CEC, and Patrick Maxon, Archaeologist w/SWCA; re: Data Responses. POS
6 page(s)
 CEC/DocketsCEC/D. Torres
319077/16/2004Report of Conversation between Eric Porter, USFWS and Melinda Dorin, CEC on May 27, 2004 regarding Riverside SPPE potential Impacts
Report of Conversation between Eric Porter, USFWS and Melinda Dorin, CEC on May 27, 2004 regarding Riverside SPPE potential Impacts
4 page(s)
 CEC/DocketCEC/Dorin
319087/16/2004Report of Conversation between Brian Arnold, SWCA and Melinda Dorin, CEC on June 22, 2004, regarding The USFWS and CDFG permits for the Habitat Conservation Plan
Report of Conversation between Brian Arnold, SWCA and Melinda Dorin, CEC on June 22, 2004, regarding The USFWS and CDFG permits for the Habitat Conservation Plan
4 page(s)
 CEC/DocketCEC/Dorin
319097/16/2004Memorandum to James Reede regarding Data Response #29 Received 6-25-04
Memorandum to James Reede regarding Data Response #29 Received 6-25-04
4 page(s)
 CEC/ReedeCEC/Torres
319107/16/2004Email report of conversation between Lyle Hill, Riverside and Demetrio Bucaneg, CEC on June 28, 2004, regarding the starting base case for the power flow analysis.
Email report of conversation between Lyle Hill, Riverside and Demetrio Bucaneg, CEC on June 28, 2004, regarding the starting base case for the power flow analysis.
4 page(s)
 Riverside/HillCEC/Bucaneg
318897/14/2004Notice of Prehearing Conference. POS
Notice of Prehearing Conference. POS
7 page(s)
 CEC/DocketsCEC Cec
318777/12/2004CURE Data Requests, Set Four. POS
CURE Data Requests, Set Four. POS
22 page(s)
 CEC/DocketsRiverside/Adams Broadwell Joseph & Cardozo
318817/12/2004Request for Confidentiality: submission of an Application for Confidentiality.
Request for Confidentiality: submission of an Application for Confidentiality.
2 page(s)
 CEC/DocketsCEC/F. Deleon
318827/12/2004Supplemental Responses (Traffic & Transportation) to CEC Data Requests. POS
Supplemental Responses (Traffic & Transportation) to CEC Data Requests. POS
7 page(s)
 CEC/DocketsRiverside
318837/12/2004CURE Data Requests Set 3. POS
CURE Data Requests Set 3. POS
92 page(s)
 CEC/DocketsCure
318597/8/2004Cultural Resources Literature Review and Pedestrian Reconnaissance for Riverside.
Cultural Resources Literature Review and Pedestrian Reconnaissance for Riverside.
49 page(s)
 CEC/DocketsPower Engineers, Inc/Maxon/steely
318637/8/2004Notice of Availability - Draft Initial Study for Riverside Public Utilities
Notice of Availability - Draft Initial Study for Riverside Public Utilities
3 page(s)
 CEC/DocketsCEC/Richins
318667/8/2004Request for Agency Comments on the Draft Initial Study
Request for Agency Comments on the Draft Initial Study
3 page(s)
 Agency Distribution ListCEC/Richins
318677/8/2004Document Handling for the Riverside Public Utilities Application
Document Handling for the Riverside Public Utilities Application
3 page(s)
 Librarian/DocketsCEC/Richins
318907/8/2004Draft Initial Study for the Riverside Project - POS
Draft Initial Study for the Riverside Project - POS
336 page(s)
 CEC/Docket UnitCEC Cec
318487/7/2004July 2, 2004 letter re: Riverside Energy Resources Center's Failure to Obtain Valid Offsets. POS
July 2, 2004 letter re: Riverside Energy Resources Center's Failure to Obtain Valid Offsets. POS
23 page(s)
 CEC/J. Reede/docketsRiverside/Adams Broadwell Joseph & Cardozo
318517/7/2004Response to CURE Data Requests Set 2./POS
Response to CURE Data Requests Set 2./POS
54 page(s)
 CEC/DocketsAllan J. Thompson
318537/7/2004Document emails regarding 101414 RPU Riverside ERC #1. Copy of FAA Application Submittal/ #2. ERC Steel Poles/ #3. Transmission line Routing Info. to James Reede frok klincoln/POS
Document emails regarding 101414 RPU Riverside ERC #1. Copy of FAA Application Submittal/ #2. ERC Steel Poles/ #3. Transmission line Routing Info. to James Reede frok klincoln/POS
6 page(s)
 CEC/Dockets/reedeKlincoln
318617/7/2004Response to Applicant's Request for Confidential Designation of Documents - POS
Response to Applicant's Request for Confidential Designation of Documents - POS
7 page(s)
 CEC/DocketsCure/Heeley/peesapati
318427/2/2004Draft Initial Study Workshop, Thursday, July 15, 2004. POS
Draft Initial Study Workshop, Thursday, July 15, 2004. POS
5 page(s)
 CEC/DocketsCEC/J. Reede
318326/30/2004Riverside Energy Resource Center, CEC, RERC PROCESS WASTE WATER/RERC STORM WATER/CONSTRUCTION DEWATERING/WATER RECYCLING REQUIREMENTS./POS
Riverside Energy Resource Center, CEC, RERC PROCESS WASTE WATER/RERC STORM WATER/CONSTRUCTION DEWATERING/WATER RECYCLING REQUIREMENTS./POS
7 page(s)
 CEC/Dockets/reedePower Engineers/Robertson/lincoln
318166/28/2004Response to CURE Data Requests Set 1./POS
Response to CURE Data Requests Set 1./POS
111 page(s)
 CEC/DocketsAllan J. Thompson, Esq.
318176/28/2004"Will Serve" letter from Mr. Bob Gill, PM, City of Riverside Public Utilities (Water Resources), and Sensitive Receptors Within A Six Mile Radius of the Proposed Project (Air Quality)./POS
"Will Serve" letter from Mr. Bob Gill, PM, City of Riverside Public Utilities (Water Resources), and Sensitive Receptors Within A Six Mile Radius of the Proposed Project (Air Quality)./POS
13 page(s)
 CEC/DocketsAllan J. Thompson, Esq.
318036/25/2004Correspondence to Suma Pessapati from Allan J. Thompson dated June 23, 2004 - POS
Correspondence to Suma Pessapati from Allan J. Thompson dated June 23, 2004 - POS
5 page(s)
 CEC/DocketsRpu/Thompson
318066/25/2004Confidential Filing
Confidential Filing
1 page(s)
 CEC/DocketsRpu/Thompson
318076/25/2004Riverside Energy Resource Center Supplemental Data Response - POS
Riverside Energy Resource Center Supplemental Data Response - POS
25 page(s)
 CEC/DocketsRpu/Thompson
317866/22/2004Response of the City of Riverside Public Utilities to the CURE Data Requests of June 9, 2004 and CURE Data Requests of June 11, 2004 - POS
Response of the City of Riverside Public Utilities to the CURE Data Requests of June 9, 2004 and CURE Data Requests of June 11, 2004 - POS
6 page(s)
 CEC/DocketsRpu/Thompson
317876/22/2004Service of All Documents Submitted in Riverside Energy Resources Center
Service of All Documents Submitted in Riverside Energy Resources Center
2 page(s)
 Rpu/Thompson/docketsAdams Broadwell Joseph & Cordozo/Peesapati
317786/21/2004Report of Conversation with Ron Baxter re: Discussed in Proposed Riverside Energy Center - POS
Report of Conversation with Ron Baxter re: Discussed in Proposed Riverside Energy Center - POS
5 page(s)
 CEC/DocketsCEC/Dorin
317796/21/2004Permit to Construct Applications - Proposed 100 MW Power Plant to be Located Riverside Energy Resource Center - POS
Permit to Construct Applications - Proposed 100 MW Power Plant to be Located Riverside Energy Resource Center - POS
4 page(s)
 CEC/DocketsScaqmd/Coats
317806/21/2004Report of Conversation with Patrick Maxon, Archaeologist with SWCA re: Data Responses - POS
Report of Conversation with Patrick Maxon, Archaeologist with SWCA re: Data Responses - POS
7 page(s)
 CEC/DocketsCEC/Torres
319056/16/2004Report of Conversation between Ted Kowalczyk, SCAQMD and Will Walters, CEC on June 16, 2004, regarding Riverside WWTP Cogen System
Report of Conversation between Ted Kowalczyk, SCAQMD and Will Walters, CEC on June 16, 2004, regarding Riverside WWTP Cogen System
5 page(s)
 CEC/DocketCEC/Walters
317156/14/2004CURE Data Requests Set 3. POS
CURE Data Requests Set 3. POS
14 page(s)
 CEC/DocketsAdams, Broadwell, Joseph & Cardozo
317206/14/2004Revised Air Quality section to the SPPE (Environmental Considerations-64pgs)+Appendix A-24pg)+(Appendix B-27pg)+(Appendix C-4pgs)+(Appendix D-23pg)+(Appendix E-9pg)+(Appendix F-18pg)+(Appendix G-26pg)+(Appendix H-18pg)+(Appendix I-9pg)+(Appendix J-45pg).
Revised Air Quality section to the SPPE (Environmental Considerations-64pgs)+Appendix A-24pg)+(Appendix B-27pg)+(Appendix C-4pgs)+(Appendix D-23pg)+(Appendix E-9pg)+(Appendix F-18pg)+(Appendix G-26pg)+(Appendix H-18pg)+(Appendix I-9pg)+(Appendix J-45pg).
268 page(s)
 CEC/DocketRerc/Thompson
317216/14/2004Revised Public Health section to the SPPE & Appendix A--Aqueous Ammonia Hazard Assessment Attachments (10pgs).
Revised Public Health section to the SPPE & Appendix A--Aqueous Ammonia Hazard Assessment Attachments (10pgs).
18 page(s)
 CEC/DocketRerc/Thompson
317236/14/2004Riverside Responses to CEC Data Requests 1-72 (214pg).
Riverside Responses to CEC Data Requests 1-72 (214pg).
214 page(s)
 CEC/DocketsRerc/Thompson
317246/14/2004Librarian letter of "Supplemental Material."
Librarian letter of "Supplemental Material."
1 page(s)
 CEC/DocketsCEC/J. Reede
317256/14/2004Agency Distribution for "Supplemental Material."
Agency Distribution for "Supplemental Material."
1 page(s)
 CEC/DocketsCEC/J. Reede
317266/14/2004City of Riverside presented one copy of the Project Labor Agreement (PLA), & the Maintenance Agreement (MA) for the Riverside Energy Resource Center.
City of Riverside presented one copy of the Project Labor Agreement (PLA), & the Maintenance Agreement (MA) for the Riverside Energy Resource Center.
50 page(s)
 CEC/J. Reede/docketsRiverside Erc/Steve Badgett
317276/14/2004Comments of the Riverside Application for Certification for a small power plant exemption. POS
Comments of the Riverside Application for Certification for a small power plant exemption. POS
8 page(s)
 CEC/J. Reede/docketsDept. Of Toxic Substances Control/G. Holmes
317316/14/2004Geotechnical Investigation Acorn Generation Project--Riverside (155pgs); included are the Results of Additional Subsurface Analysis (38pgs).
Geotechnical Investigation Acorn Generation Project--Riverside (155pgs); included are the Results of Additional Subsurface Analysis (38pgs).
193 page(s)
 CEC/J. Reede/docketsRiverside Erc/Geotechnical Group
317586/14/2004Response of the City of Riverside Public Utilities to the CURE Data Requests of June 4, 2004
Response of the City of Riverside Public Utilities to the CURE Data Requests of June 4, 2004
5 page(s)
 CEC/DocketsRiverside Erc/A. Thompson
317606/14/2004CD of Air Dispersion Modeling Files June 8, 2004
CD of Air Dispersion Modeling Files June 8, 2004
1 page(s)
 CEC/DocketsRiverside Erc/A. Thompson
317836/14/2004Revised Hard Copies of the Air Quality & Public Health Section and Appendices
Revised Hard Copies of the Air Quality & Public Health Section and Appendices
268 page(s)
 CEC/Reede/docketsCity Of Riverside Public Utilities/Thompson
316856/10/2004Errata-CURE Data Request, Set One - POS
Errata-CURE Data Request, Set One - POS
20 page(s)
 Powers Engineers/Tateosian/lincolnAdams Broadwell Joseph & Cardozo
316866/10/2004CURE Data Requests Set Two (Nos. 13-15) - POS
CURE Data Requests Set Two (Nos. 13-15) - POS
9 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo/Heeley
317086/10/2004Email ROC between James Reede and Suma Peesapati regarding numbering of Data Requests
Email ROC between James Reede and Suma Peesapati regarding numbering of Data Requests
1 page(s)
 Adams Broadwell Joseph & Cardozo/PeesapatiCEC/Reede
316786/9/2004Riverside Energy Project, Proof of Service List, Docket No. 04-SPPE-1, current as of June 9, 2004.
Riverside Energy Project, Proof of Service List, Docket No. 04-SPPE-1, current as of June 9, 2004.
4 page(s)
 All PartiesCEC/Hearing Advisor's Office/fontanilla
316676/8/2004Phase I Environmental Site Assessment for Acorn Generation Project
Phase I Environmental Site Assessment for Acorn Generation Project
95 page(s)
 CEC/DocketPower Engineers/Lincoln
316526/7/2004CURE Data Requests, Set One (1 - 12b)
CURE Data Requests, Set One (1 - 12b)
21 page(s)
 Power Engineers/Tateosian/lincolnAdams Broadwell Joseph & Cardozo/Peesapati
316396/3/2004Data Response Workshop Riverside Energy Resource Center/POS
Data Response Workshop Riverside Energy Resource Center/POS
5 page(s)
 CEC/DocketsCEC/Pfannenstiel
316216/1/2004Comments on the 1st round data requests to the applicant./POS
Comments on the 1st round data requests to the applicant./POS
5 page(s)
 CEC/ReedeCalifornia Regional Water Quality Control Board/Ad
316135/28/2004Scheduling Order - POS
Scheduling Order - POS
4 page(s)
 CEC/Docket UnitCEC/Pfannenstiel/geesman
315985/26/2004Order Granting Petition To Intervene to CURE C/O Adams Broadwell Joseph & Cardoxo
Order Granting Petition To Intervene to CURE C/O Adams Broadwell Joseph & Cardoxo
3 page(s)
 CEC/DocketCEC/Pfannensteil/geesman
315885/25/2004Electric power transmission lines maintained by power companies may or may not be hazardous to humans.
Electric power transmission lines maintained by power companies may or may not be hazardous to humans.
5 page(s)
 CEC/Reede/dockets UnitRiverside Unified School District/Dixon
315275/18/2004Petition to Intervene by California Unions for Reliable Energy - POS
Petition to Intervene by California Unions for Reliable Energy - POS
7 page(s)
 CEC/DocketsAdams Broadwell Joseph & Cardozo/Joseph
314935/14/2004Issues Identification Report for Riverside Energy Resource Center Project. POS
Issues Identification Report for Riverside Energy Resource Center Project. POS
11 page(s)
 CEC/DocketsCEC/Commissioners Pfannenstiel & Geesman
314955/14/20041st Round Data Requests for Riverside Energy Resource Center. POS
1st Round Data Requests for Riverside Energy Resource Center. POS
28 page(s)
 CEC/Stephen H. Badgett/docketsCEC/J. Reede
314695/13/2004Resolution No: 04-0505-03 - Approving the selection of a Siting Committee for Riverside
Resolution No: 04-0505-03 - Approving the selection of a Siting Committee for Riverside
1 page(s)
 CEC/DocketCEC/Keese
314485/12/2004Notice of Public Informational Hearing and Site Visit - POS
Notice of Public Informational Hearing and Site Visit - POS
8 page(s)
 CEC/DocketCEC/Pfannenstiel/geesman
314265/10/2004Data Request Workshop - POS
Data Request Workshop - POS
2 page(s)
 CEC/DocketCEC/Pfannenstiel
313845/5/2004City of Riverside - - Circuit Breaker Stress Study Acorn Generation Project Final Report, prepared by POWER Engineers.
City of Riverside - - Circuit Breaker Stress Study Acorn Generation Project Final Report, prepared by POWER Engineers.
17 page(s)
 CEC/DocketsCity Of Riverside
313374/29/2004Application for Certification for Small Power Plant Exemption
Application for Certification for Small Power Plant Exemption
627 page(s)
 CEC/Therkelsen/docketCity Of Riverside/Badgett
313424/29/2004Request for Agency Participation in the review of the AFC
Request for Agency Participation in the review of the AFC
2 page(s)
 Agency List/DocketCEC/Richins
313434/29/2004Document Handling for the AFC
Document Handling for the AFC
3 page(s)
 Library List/DocketCEC/Richins
313444/29/2004Notice of Receipt of the AFC
Notice of Receipt of the AFC
3 page(s)
 Interested Parties/DocketCEC/Richins