35699 | 10/14/2005 |
Comments on the September 23, 2005 Hearing on the CEC Draft Committee Report-Strategic Transmission Investment Plan
5 page(s)
| | CEC/Docket Unit | Southern California Edison/Alvarez |
35629 | 10/4/2005 |
Comments regarding the IEPR Greenhouse Gas Performance Standard
2 page(s)
| | CEC/Docket Unit | Trans-Elect, Inc./Mitchell |
35625 | 10/7/2005 |
CEED's comments on Draft 2005 IEPR (9/05)
89 page(s)
| | CEC/Docket Unit | CEED |
35582 | 9/30/2005 |
Report of the Imperial Valley Study Group. (1 of 5 documents)
67 page(s)
| | CEC/Docket Unit | Imperial Valley Study Group |
35569 | 9/30/2005 |
Imperial Valley Study Group--"Appendix D" Transmission Planning Studies--Vol 4
108 page(s)
| | CEC/Docket Unit | CEC/Clare Laufenberg |
35568 | 9/30/2005 |
Imperial Valley Study Group--"Appendix C" Transmission Planning Studies Vol 3.
196 page(s)
| | CEC/Docket Unit | CEC/Clare Laufenberg |
35567 | 9/30/2005 |
Imperial Valley Study Group- "Appendix B" Transmission Planning Studies-Vol 2
139 page(s)
| | CEC/Docket Unit | CEC/Clare Laufenberg |
35566 | 9/30/2005 |
Imperial Valley Study Group " Appendix A" Transmission Planning Studies--Vol 1
265 page(s)
| | CEC/Docket Unit | CEC/Clare Laufenberg |
35187 | 8/8/2005 |
Response of Vulcan Power Company; Loading Order Workshop and Transmission Staff Report
5 page(s)
| | CEC/Docket Unit | Milbank, Tweed, Hadley & McCloy LLP |
35168 | 8/5/2005 |
CEC Staff Report, Upgrading California's Electric Transmission System
10 page(s)
| | CEC/Docket Unit | L A Dept of Water and Power/Howard |
35165 | 8/5/2005 |
Comments June 2005 Consultant entitled "Strategic Value Analysis for Integrating Renewable Technologies in Meeting Target Renewable Penetration.
3 page(s)
| | Docket Unit | SDG&E |
35160 | 8/4/2005 |
Comments on Strategic Planning and Transmission Staff Report.
2 page(s)
| | CEC/Docket Unit | DWR/State Water Project |
35156 | 8/3/2005 |
New ISO Transmission Planning Process
2 page(s)
| | CEC | SDGE/Perez |
35153 | 8/2/2005 |
Strategic Transmission Planning Issues and Transmission Staff Report
3 page(s)
| | Dockets | League of CA Cities/Kneene/Hunter/Mannion |
35152 | 5/20/2005 |
Comments on Corridor and Strategic Transmission Planning Workshop
4 page(s)
| | Dockets | League of CA Cities//Kneen/Hunter/Mannion |
35146 | 7/29/2005 |
Comments on CEC Draft Report Entitled Options for Energy Efficiency Improvements in Existing Buildings
5 page(s)
| | CEC/Dockets | PG&E/Guliasi |
35143 | 8/2/2005 |
Comments of PG&E on the IEPR Committee Workshop on Strategic Value Analysis
6 page(s)
| | CEC/Dockets | PG&E/Guliasi |
35108 | 7/29/2005 |
Review of SCE's Economic Evaluation Methodology for the Devers Palo Verde Line No. 2 (DPV2)
7 page(s)
| | CEC/Docket Unit | CERTS |
35107 | 7/29/2005 |
Final Agenda for the 2005 Energy Report Committee Hearing on Strategic Transmission Planning Issues and Transmission Staff Report
1 page(s)
| | CEC/Docket Unit | CEC |
35106 | 7/29/2005 |
Upgrading California's Electric Transmission System: Issues and Actions for 2005 and Beyond
7 page(s)
| | CEC/Docket Unit | CEC/Grau |
35105 | 7/29/2005 |
2005 Strategic Transmission Planning Issues CEC Hearing
19 page(s)
| | CEC/Docket Unit | PG&E/Thomas |
35098 | 7/28/2005 |
Assessing Low-Probability, High-Impact Events
33 page(s)
| | CEC/Docket Unit | CEC/Grau |
35095 | 7/27/2005 |
Facing the Transmission Challenges of Tomorrow Presentation
8 page(s)
| | CEC/Laufenberg/Docket Unit | IID Energy/Kiener |
35094 | 7/27/2005 |
Upgrading California's Electric Transmission System: Issues and Actions for 2005 and Beyond
197 page(s)
| | CEC/Docket Unit | CEC/Strand |
35093 | 7/27/2005 |
Strategic Transmission Planning Issues
24 page(s)
| | CEC/Docket Unit | Navigant Consulting |
35075 | 7/26/2005 |
PG&E's Comments re: the Strategic Value Analysis process
6 page(s)
| | CEC/Docket Unit | PG&E/Guliasi |
35073 | 7/26/2005 |
Presentation received at the IEPR Committee Hearing on Strategic Transmission Planning
13 page(s)
| | CEC/Docket Unit | SDG&E/Avery |
35009 | 7/22/2005 |
Comments of The California Wind Energy Association on Strategic Value Analysis For Integrating Renewable Technologies in Meeting Target Renewable Penetration and Supporting Documents.
5 page(s)
| | Docket Unit | N. Rader/ CALWEA |
34912 | 7/15/2005 |
Notice of Committee Hearing on Strategic Transmission Planning Issues and Transmission Staff Report.
4 page(s)
| | CEC/Docket Unit | CEC/Commissioner Geesman & Boyd |
34631 | 6/16/2005 |
Notice of Committee Workshop On Strategic Value Analysis for Integrating Renewable Resources To Help Meet California Renewable Portfolio Standard Goals.
3 page(s)
| | Docket Unit | CEC |
34506 | 6/1/2005 |
Comments on Corridor and Strategic Planning Issues
3 page(s)
| | CEC/Geesman/Boyd/Dockets | CA Farm Bureau Federation/Mills |
34484 | 6/1/2005 |
Comments on Corridor and Stratospheric Planning Issues.
3 page(s)
| | Docket Unit | K.N. Mills |
34455 | 5/27/2005 |
Corridor and Strategic Transmission Planning Issues.
1 page(s)
| | Docket Unit | CEC |
34413 | 5/24/2005 |
Comments on Renewables Workshop
2 page(s)
| | Docket Unit | EnerNex/ Corporation |
34409 | 5/20/2005 |
2004-2005 Integrated Energy Policy Report 04-IEP-1F Comments for PPM Boyd
4 page(s)
| | Docket Unit | Ellsion, Schineider & Harris L.L.P. |
34408 | 5/20/2005 |
04-IEP-1F Workshop Sign in Sheet for May 19, 2005
4 page(s)
| | Docket Unit | CEC |
34405 | 5/20/2005 |
Souther California Edison's Comments Regarding the " Assessment of Reliability and Operational Issues for integration of Renewable Generation.
7 page(s)
| | Docket Unit | SCE/ G. Shooyan / Janos Kakuk |
34404 | 5/20/2005 |
Southern California Edison's Comments Regarding The "Assessment of Reliability and Operational Issues for Integration of Renewable Generation"
7 page(s)
| | Docket Unit | SCE/G. Schoonyan |
34394 | 5/19/2005 |
Presentation given by Jorge Chacon, SCE, at the May 19, 2005, Transmission Corridor Planning Workshop. (7 slides)
7 page(s)
| | CEC/Docket Unit | CEC/C. Laufenberg |
34393 | 5/19/2005 |
Comments relating to the May 9 & 10, 2005, Renewable Workshops.
97 page(s)
| | CEC/Docket Unit | PG&E/L. Guliasi |
34390 | 5/19/2005 |
Comments to the May 9th Committee Workshop on Renewable Resource Potential In CA & Interstate Renewable Resources.
3 page(s)
| | CEC/Docket Unit | CALPINE, Jack Pigott |
34387 | 5/19/2005 |
Presentation by R. Peter Mackin, Navigant Consulting, Inc., given at the Transmission Corridor IEPR Workshop on May 19, 2005. (14 slides)
14 page(s)
| | CEC/Docket Unit | CEC/C. Laufenberg |
34384 | 5/17/2005 |
Presentation by Eric Toolson, Pinnacle Consulting LLC, given at the Transmission Corridor IEPR Workshop on May 19, 2005. (19 slides)
19 page(s)
| | CEC/Docket Unit | CEC/C. Laufenberg |
34383 | 5/17/2005 |
Presentation by Joe Eto, SCE's FERC & CPUC, given at the Transmission Corridor IEPR Workshop on May 19, 2005. (10slides)
10 page(s)
| | CEC/Docket Unit | CEC/C. Laufenberg |
34382 | 5/17/2005 |
Presentation by Joe Eto, CAISO, given at the Transmission Corridor IEPR Workshop on May 19, 2005. (14 slides)
14 page(s)
| | CEC/Docket Unit | CEC/C. Laufenberg |
34381 | 5/17/2005 |
Presentation by Duane Marti (BLM) & Bob Hawkins (FS), at the Transmission Corridor IEPR Workshop on May 19, 2005. (6 slides)
6 page(s)
| | CEC/Docket Unit | CEC/C. Laufenberg |
34380 | 5/17/2005 |
Presentation by PIER at the Transmission Corridor IEPR Workshop on May 19, 2005. (15 slides)
15 page(s)
| | CEC/Docket Unit | CEC/C. Laufenberg |
34378 | 5/17/2005 |
Presentation by Laura McDonald, SDG&E, given at the Transmission Corridor IEPR Workshop on May 19, 2005. (18 slides)
18 page(s)
| | CEC/Docket Unit | CEC/C. Laufenberg |
34357 | 5/18/2005 |
Comments on the Renewable Energy Resource Assessments being considered by the Commission.
5 page(s)
| | CEC/Docket Unit | Geothermal Energy Assoc/K. Gawell |
34355 | 5/18/2005 |
Presentation given by Chifong Thomas, PG&E, at the Committee Workshop on May 19, 2005, for Corridors & Strategic Plan Update #1.
22 page(s)
| | CEC/Docket Unit | PG&E |
34354 | 5/18/2005 |
Presentation given by Judy Grau, CEC, at the Committee Workshop on May 19, 2005, for Corridors & Strategic Plan Update #1.
11 page(s)
| | CEC/Docket Unit | CEC/C. Laufenberg |
34353 | 5/18/2005 |
Presentation given by Jim Bartridge, CEC, at the Committee Workshop on May 19, 2005, for Corridors & Strategic Plan Update #1.
7 page(s)
| | CEC/Docket Unit | Jim Bartridge/CEC |
34352 | 5/18/2005 |
Protest of the City of Los Angeles Department of Water and Power (exhibits included).
16 page(s)
| | Kevin Kennedy/CEC/Docket Unit | Rockard J. Delgadillo/City Attorney of LA |
34263 | 5/10/2005 |
Presentation to the CEC on the May 10, 2005 workshop on Renewables Operational Integration Issues #2. (16 slides)
16 page(s)
| | CEC/Docket Unit | EnerNex/R. Zavadil |
34262 | 5/10/2005 |
Presentation by CEC at the Committee Workshop on Assessment of Reliability & Operational Issues for Integration of Renewable Generation. (58 slides)
58 page(s)
| | CEC/Docket Unit | CEC/C. Laufenberg |
34259 | 5/9/2005 |
Proposed Alternative Process for Transmission Line Planning That Avoids Land Use Preemption
1 page(s)
| | Dockets | League Of California Cities |
34236 | 5/6/2005 |
WECC Low Voltage Ride Through Standard
8 page(s)
| | CEC/Docket Unit | California Iso/Miller |
34235 | 5/6/2005 |
Agenda for the 2005 Energy Report Committee Workshop for Corridors and Strategic Plan Update #1
9 page(s)
| | CEC/Docket Unit | CEC Cec |
34219 | 5/5/2005 |
Agenda for the 2005 Energy Report Committee Workshop on Renewable Transmission Operational Integration Issues Update #2
2 page(s)
| | CEC/Docket Unit | CEC Cec |
34193 | 5/3/2005 |
Assessment of Reliability and Operational Issues for Integration of Renewable Generation - CEC Workshop 5/10/05
55 page(s)
| | Dockets | Electric Power Group |
34188 | 5/3/2005 |
Senate Bill 1059 - Oppose Unless Amended
1 page(s)
| | Energy Utilities & Communications Committee/Escult | So. Ca Edison/Ross |
34187 | 5/3/2005 |
Notice of League Opposition, Unless Amended
2 page(s)
| | State Capitol/Senator Escutia/dockets | League Of Ca Cities/Hunter |
34095 | 4/27/2005 |
Letter Re: Plan to Work With Silicon Valley Power and The City of Palo Alto.
2 page(s)
| | Docket Unit | Alameda Power & Telecom / V. O. Fong |
34094 | 4/27/2005 |
Brief Initial Response: Will Be Working With Alameda and Palo Alto.
3 page(s)
| | Docket Unit | Silicon Valley Power/ J. Jonas |
33945 | 4/18/2005 |
Notice of Committee Workshop on Renewable Resource Potential In California and Interstate Renewable Resources.
3 page(s)
| | Docket Unit | CEC Cec |
33942 | 4/18/2005 |
Notice of Committee Workshop on Renewables Operational Integration Issues #2.
2 page(s)
| | Docket Unit | CEC Cec |
33904 | 4/11/2005 |
Interstate Transmission Capability
11 page(s)
| | Dockets | Davis Power/Davis |
33903 | 4/11/2005 |
Strategic Value Analysis - Geo Transmission Workshop
14 page(s)
| | Dockets | Pier/Sison-lebrilla |
33902 | 4/11/2005 |
California Transmission Policy Suggestions to Facilitate Geo RPS Supplies
54 page(s)
| | Dockets | Vulcan |
33900 | 2/3/2005 |
Renewable Gaslit Power Issues
20 page(s)
| | CEC/Geesman/dockets | Ulcan Power/Munson |
33898 | 4/12/2005 |
CEC 2005 IEPR Workshop Sign-In Sheet
3 page(s)
| | CEC/Docket Unit | CEC Cec |
33890 | 4/12/2005 |
Presentation - Imperial Valley Study Group Transmission Planning Collaborative
5 page(s)
| | CEC/Docket Unit | Imperial Valley/Olsen |
33889 | 4/11/2005 |
Presentation - IID Energy Green Path Initiative
6 page(s)
| | CEC/Docket Unit | Iid Energy |
33888 | 4/11/2005 |
Presentation - Transmission Constraints to Geothermal Resource Development
12 page(s)
| | CEC/Docket Unit | Sdge |
33887 | 4/11/2005 |
Presentation - Strategic Value Analysis-Geothermal
30 page(s)
| | CEC/Docket Unit | Pier/Sison-lebrilla |
33871 | 4/8/2004 |
Transmission Constraints to Geo Resource Development - CEC IEPR Workshop
12 page(s)
| | Dockets | Sempra |
33870 | 4/8/2005 |
Revised Transmission Planning Collaborative
10 page(s)
| | Dockets | Imperial Valley Study Group/Olsen |
33869 | 4/8/2005 |
Geothermal Resources Available to California Markets
19 page(s)
| | Dockets | Geothermex, Inc./Lovekin |
33868 | 4/11/2005 |
Transmission Planning Collaborative
10 page(s)
| | Dockets | Imperial Valley Study Group/Olsen |
33863 | 4/8/2005 |
Solicit Unified Support From Various Entities on Common Problem Resolution
13 page(s)
| | Dockets | Iid Energy |
33862 | 4/8/2005 |
Interstate Transmission Capability - Geo Transmission Workshop
11 page(s)
| | Dockets | Davis Power Consultants/Davis |
33840 | 3/17/2005 |
Comments from PPM Energy
7 page(s)
| | CEC/Geesman/boyd/docket Unit | Ellison, Schneider & Harris/Ellison |
33777 | 3/30/2005 |
Comments from PPM Energy
7 page(s)
| | CEC/Geesman/boyd | Ellison Schnider & Harris/Ellison |
33570 | 3/1/2005 |
Notice of Committee Workshop on Transmission Renewables Integration Issues.
2 page(s)
| | Dockets | CEC Cec |
33564 | 3/1/2005 |
Agenda 2005 Report Committee Workshop on Transmission Renewables Operational Integration Issues.
3 page(s)
| | Dockets | CEC Cec |
33563 | 3/1/2005 |
Reply Comments of The California Wind Energy Association on Operational Integration Issues Associated with Transmission and Renewable Generations.
12 page(s)
| | Dockets | CEC Cec |
33552 | 2/28/2005 |
Comments in response to the February 3, 2005, Integrated Energy Policy Report Committee Workshop.
3 page(s)
| | CEC/Docket Unit | American Wind Energy Association |
33474 | 2/17/2005 |
Reply Comments on Operational Integration Issues Associated With Transmission and Renewable Generation
12 page(s)
| | Dockets | Ca Wind Energy Association/Rader |
33460 | 2/17/2005 |
Comments Regarding the Assessment of Reliability and Operational Issues
5 page(s)
| | Dockets | So. Cal Edison/Schoonyan |
33363 | 2/15/2005 |
CEC Committee Workshop on Transmission - Renewable Integration Issues
7 page(s)
| | CEC/Docket Unit | Certs |
33281 | 2/7/2005 |
Wind Generation Operating Issues: CAISO Perspective Experience (revised)
25 page(s)
| | Dockets | California Iso |
33280 | 2/7/2005 |
Wind Generation Operating Issues: CAISO Perspective & Experience (original)
25 page(s)
| | Dockets | California Iso |
33279 | 2/7/2005 |
Wind Generation Operating Issues: CAISO Perspective & Experience.
25 page(s)
| | Dockets | California Iso |
33278 | 2/7/2005 |
Assessment of Reliability and Operational Issues for Integration of Renewable Generation. Energy Commission Committee Workshop
31 page(s)
| | Dockets | Electric Power Group / Certs |
33277 | 2/7/2005 |
Assessment of Reliability and Operational Issues for integration of Renewable Generation / Background Material for California Energy Commission Stakeholder Workshop.
37 page(s)
| | Dockets | CEC Cec |
33276 | 2/7/2005 |
Intermittency Management and High Penetration Renewables
16 page(s)
| | Dockets | Ge Energy/ N. W. Miller / J. P. Lyons |
33261 | 2/3/2005 |
California Energy Commission 2005 IEPR Work Shop Sign-In Sheet Transmission-Renewables Integration for February 3, 2005.
9 page(s)
| | Dockets | CEC Cec |
33185 | 1/21/2005 |
Notice of Committee Workshop on Transmission - Renewables Integration Issues.
3 page(s)
| | CEC/Docket Unit | CEC Cec |
33072 | 11/29/2004 |
November 15, 2004 Workshop South Coast Air Quality Comments on the California Energy Commission Staff's Proposed Scope of Work & Other Information Presented to CEC's November 15, 2004 Committee Workshop.
5 page(s)
| | CEC/ Dockets | Office Of The Executive Officer / B. Wallerstein |
33023 | 12/29/2004 |
Intermittent Wind Generation: Summary Report of Impacts on Grid System Operations.
37 page(s)
| | CEC/Docket Unit | CEC Cec |
32905 | 12/8/2004 |
Comments submitted in response to the CEC staff paper titled Proposal to Access Supply, Resource and Bulk Transmission Planning Data released 12/2/04.
3 page(s)
| | CEC/Docket Unit | Dept Of Water & Power, City Of Los Angeles,randy S |
32889 | 12/6/2004 |
Comments re: directives of the study and proper state agency coordination in order to prevent duplication & delays in building new transmission.
2 page(s)
| | CEC/Docket Unit | Sempra/B. Orozco |
32871 | 12/3/2004 |
Comments of the Proposal to Assess Electricity Supply, Resource, and Bulk Transmission Planning Data.
25 page(s)
| | CEC/Docket Unit | Cac & Epuc |
32867 | 12/2/2004 |
Comments on the November 2004 CEC Staff report: Proposal to Access Electricity Supply, Resource, and Bulk Transmission Planning Data.
3 page(s)
| | CEC/Docket Unit | La Dept Water & Power |
32866 | 12/2/2004 |
Comments on the Staff Paper "Proposal to Assess Electricity Supply, Resource, and Bulk Transmission Planning Data.
9 page(s)
| | CEC/Docket Unit | Southern Ca Edison/Alvarez |
32822 | 11/29/2004 |
Comments on the 2005 Energy Report November 18 Workshop
2 page(s)
| | CEC/Docket Unit | League Of Women Voters Of California/Jacobberger |
32767 | 11/19/2004 |
ISO Comments on the CEC Proposal to Assess Electricity Supply, Resource, and Bulk Transmission Planning Data
3 page(s)
| | CEC/Docket Unit | CEC Cec |
32765 | 11/19/2004 |
Agenda for the Energy Report Committee Workshop on the Proposal to Assess Electricity Supply and Bulk Transmission Planning and Related Data Needs
1 page(s)
| | CEC/Dockets Unit | CEC Cec |
32763 | 11/19/2004 |
2005 Energy Report Proceeding - Staff Proposal for Electricity and Transmission Planning Data Submittals
9 page(s)
| | CEC/Docket Unit | CEC/Vidaver/hesters |
32761 | 11/19/2004 |
2005 Energy Report Proceeding - Staff Proposal for Electricity Supply and Transmission Planning
7 page(s)
| | CEC/Docket Unit | CEC/Jaske/grau |
32759 | 11/19/2004 |
Questions for Workshop Participants: 2005 Integrated Energy Policy Report - Workshop on the Proposal to Assess Electricity Supply and Bulk Transmission Planning and Related Data Needs
2 page(s)
| | CEC/Docket Unit | CEC Cec |
32757 | 11/19/2004 |
2005 Integrated Energy Policy Report - Committee Workshop on the Proposal to Assess Electricity Supply, Resource, and Bulk Transmission Planning Data
5 page(s)
| | CEC/Docket Unit | CEC/Kennedy |
1977-0 | 7/26/2005 |
2005 Energy Report Committee Workshop on Strategic Value Analysis for Integ
286 page(s)
| | | |
1943 | 5/20/2005 |
Renewable Resource Potential in CA & Interstate Renewable Resources
259 page(s)
| | | |
1914 | 2/18/2005 |
Prep of 2005 IEPR Re: Transmission - Renewables Integration Issues
146 page(s)
| | | |