Docket Log

Docket: 03-AFC-02C
Project Title: Los Esteros Phase II Compliance
Generated On: 3/25/2026 8:46:50 AM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
2691902/13/2026 12PhII PGE - Appendix H - Short Circuit Study Resultspdf
12PhII PGE - Appendix H - Short Circuit Study Results.pdf
29 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691892/13/2026 C12PhII PGE - Appendix B - System Assumptionspdf
C12PhII PGE - Appendix B - System Assumptions.pdf
56 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691882/13/2026 Appendix I - Deliverability Assessment Results_GBA_C12P2pdf
Appendix I - Deliverability Assessment Results_GBA_C12P2.pdf
5 page(s)
 CEC/Docket UnitClimate Edge Law Group
2691872/13/2026 C12PhII_GreaterBayArea_Interconnection_Area_Report_Addendum01pdf
C12PhII_GreaterBayArea_Interconnection_Area_Report_Addendum01.pdf
53 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691862/13/2026 C12PhII_GreaterBayArea_Interconnection_Area_Reportpdf
C12PhII_GreaterBayArea_Interconnection_Area_Report.pdf
53 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691852/13/2026 C12PhII PGE Greater Bay Area - Appendix J - Energy Storage Charging Reliability Power Flow Resultspdf
C12PhII PGE Greater Bay Area - Appendix J - Energy Storage Charging Reliability Power Flow Results.pdf
138 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691842/13/2026 C12PhII PGE Greater Bay Area - Appendix G - Reliability Assessment Resultspdf
C12PhII PGE Greater Bay Area - Appendix G - Reliability Assessment Results.pdf
3 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691832/13/2026 C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plotspdf
C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots.pdf
960 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691822/13/2026 C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots (reduced)pdf
C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots (reduced).pdf
960 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691812/13/2026 C12PhII PGE Greater Bay Area - Appendix E - Reliability Power Flow Resultspdf
C12PhII PGE Greater Bay Area - Appendix E - Reliability Power Flow Results.pdf
29 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691802/13/2026 C12PhII PGE Greater Bay Area - Appendix D - Power Flow Plotspdf
C12PhII PGE Greater Bay Area - Appendix D - Power Flow Plots.pdf
51 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691792/13/2026 C12PhII PGE Greater Bay Area - Appendix C - Contingency Listspdf
C12PhII PGE Greater Bay Area - Appendix C - Contingency Lists.pdf
955 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691782/13/2026 62 C12Ph2 - Attachment 6 - Generator Dynamic Data - Q1550pdf
6.2 C12Ph2 - Attachment 6 - Generator Dynamic Data - Q1550.pdf
8 page(s)
 CEC/Docket Unit Climate Edge Law Group
2691712/13/2026 12PhII PGE - Appendix H - Short Circuit Study Resultspdf
12PhII PGE - Appendix H - Short Circuit Study Results.pdf
29 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691702/13/2026 C12PhII PGE - Appendix B - System Assumptionspdf
C12PhII PGE - Appendix B - System Assumptions.pdf
56 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691692/13/2026 Appendix I - Deliverability Assessment Results_GBA_C12P2pdf
Appendix I - Deliverability Assessment Results_GBA_C12P2.pdf
5 page(s)
 CEC/Docket UnitClimate Edge Law Group
2691682/13/2026 C12PhII_GreaterBayArea_Interconnection_Area_Report_Addendum01pdf
C12PhII_GreaterBayArea_Interconnection_Area_Report_Addendum01.pdf
53 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691672/13/2026 C12PhII_GreaterBayArea_Interconnection_Area_Reportpdf
C12PhII_GreaterBayArea_Interconnection_Area_Report.pdf
53 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691662/13/2026 C12PhII PGE Greater Bay Area - Appendix J - Energy Storage Charging Reliability Power Flow Resultspdf
C12PhII PGE Greater Bay Area - Appendix J - Energy Storage Charging Reliability Power Flow Results.pdf
138 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691652/13/2026 C12PhII PGE Greater Bay Area - Appendix G - Reliability Assessment Resultspdf
C12PhII PGE Greater Bay Area - Appendix G - Reliability Assessment Results.pdf
3 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691642/13/2026 C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plotspdf
C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots.pdf
960 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691632/13/2026 C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots (reduced)pdf
C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots (reduced).pdf
960 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691622/13/2026 C12PhII PGE Greater Bay Area - Appendix E - Reliability Power Flow Resultspdf
C12PhII PGE Greater Bay Area - Appendix E - Reliability Power Flow Results.pdf
29 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691612/13/2026 C12PhII PGE Greater Bay Area - Appendix D - Power Flow Plotspdf
C12PhII PGE Greater Bay Area - Appendix D - Power Flow Plots.pdf
51 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691602/13/2026 C12PhII PGE Greater Bay Area - Appendix C - Contingency Listspdf
C12PhII PGE Greater Bay Area - Appendix C - Contingency Lists.pdf
955 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691592/13/2026 62 C12Ph2 - Attachment 6 - Generator Dynamic Data - Q1550pdf
6.2 C12Ph2 - Attachment 6 - Generator Dynamic Data - Q1550.pdf
8 page(s)
 CEC/Docket Unit Climate Edge Law Group
2691582/13/2026 61 C12Ph2 - Attachment 10 - Substation and Transmission Line Work Scope -Q1550pdf
6.1 C12Ph2 - Attachment 10 - Substation and Transmission Line Work Scope -Q1550.pdf
10 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691472/13/2026 12PhII PGE - Appendix H - Short Circuit Study Resultspdf
12PhII PGE - Appendix H - Short Circuit Study Results.pdf
29 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691462/13/2026 C12PhII PGE - Appendix B - System Assumptionspdf
C12PhII PGE - Appendix B - System Assumptions.pdf
56 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691452/13/2026 Appendix I - Deliverability Assessment Results_GBA_C12P2pdf
Appendix I - Deliverability Assessment Results_GBA_C12P2.pdf
5 page(s)
 CEC/Docket UnitClimate Edge Law Group
2691442/13/2026 C12PhII_GreaterBayArea_Interconnection_Area_Report_Addendum01pdf
C12PhII_GreaterBayArea_Interconnection_Area_Report_Addendum01.pdf
53 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691432/13/2026 C12PhII_GreaterBayArea_Interconnection_Area_Reportpdf
C12PhII_GreaterBayArea_Interconnection_Area_Report.pdf
53 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691422/13/2026 C12PhII PGE Greater Bay Area - Appendix J - Energy Storage Charging Reliability Power Flow Resultspdf
C12PhII PGE Greater Bay Area - Appendix J - Energy Storage Charging Reliability Power Flow Results.pdf
138 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691412/13/2026 C12PhII PGE Greater Bay Area - Appendix G - Reliability Assessment Resultspdf
C12PhII PGE Greater Bay Area - Appendix G - Reliability Assessment Results.pdf
3 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691402/13/2026 C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plotspdf
C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots.pdf
960 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691392/13/2026 C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots (reduced)pdf
C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots (reduced).pdf
960 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691382/13/2026 C12PhII PGE Greater Bay Area - Appendix E - Reliability Power Flow Resultspdf
C12PhII PGE Greater Bay Area - Appendix E - Reliability Power Flow Results.pdf
29 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691372/13/2026 C12PhII PGE Greater Bay Area - Appendix D - Power Flow Plotspdf
C12PhII PGE Greater Bay Area - Appendix D - Power Flow Plots.pdf
51 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691362/13/2026 C12PhII PGE Greater Bay Area - Appendix C - Contingency Listspdf
C12PhII PGE Greater Bay Area - Appendix C - Contingency Lists.pdf
955 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691352/13/2026 62 C12Ph2 - Attachment 6 - Generator Dynamic Data - Q1550pdf
6.2 C12Ph2 - Attachment 6 - Generator Dynamic Data - Q1550.pdf
8 page(s)
 CEC/Docket Unit Climate Edge Law Group
2691342/13/2026 61 C12Ph2 - Attachment 10 - Substation and Transmission Line Work Scope -Q1550pdf
6.1 C12Ph2 - Attachment 10 - Substation and Transmission Line Work Scope -Q1550.pdf
10 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691332/13/2026 68 Q1550_Tanager Storage_C12PhII_Cover Letterpdf
6.8 Q1550_Tanager Storage_C12PhII_Cover Letter.pdf
1 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691302/13/2026 12PhII PGE - Appendix H - Short Circuit Study Resultspdf
12PhII PGE - Appendix H - Short Circuit Study Results.pdf
29 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691292/13/2026 C12PhII PGE - Appendix B - System Assumptionspdf
C12PhII PGE - Appendix B - System Assumptions.pdf
56 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691282/13/2026 Appendix I - Deliverability Assessment Results_GBA_C12P2pdf
Appendix I - Deliverability Assessment Results_GBA_C12P2.pdf
5 page(s)
 CEC/Docket UnitClimate Edge Law Group
2691272/13/2026 C12PhII_GreaterBayArea_Interconnection_Area_Report_Addendum01pdf
C12PhII_GreaterBayArea_Interconnection_Area_Report_Addendum01.pdf
53 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691262/13/2026 C12PhII_GreaterBayArea_Interconnection_Area_Reportpdf
C12PhII_GreaterBayArea_Interconnection_Area_Report.pdf
53 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691252/13/2026 C12PhII PGE Greater Bay Area - Appendix J - Energy Storage Charging Reliability Power Flow Resultspdf
C12PhII PGE Greater Bay Area - Appendix J - Energy Storage Charging Reliability Power Flow Results.pdf
138 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691242/13/2026 C12PhII PGE Greater Bay Area - Appendix G - Reliability Assessment Resultspdf
C12PhII PGE Greater Bay Area - Appendix G - Reliability Assessment Results.pdf
3 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691232/13/2026 C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plotspdf
C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots.pdf
960 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691222/13/2026 C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots (reduced)pdf
C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots (reduced).pdf
960 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691212/13/2026 C12PhII PGE Greater Bay Area - Appendix E - Reliability Power Flow Resultspdf
C12PhII PGE Greater Bay Area - Appendix E - Reliability Power Flow Results.pdf
29 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691202/13/2026 C12PhII PGE Greater Bay Area - Appendix D - Power Flow Plotspdf
C12PhII PGE Greater Bay Area - Appendix D - Power Flow Plots.pdf
51 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691192/13/2026 C12PhII PGE Greater Bay Area - Appendix C - Contingency Listspdf
C12PhII PGE Greater Bay Area - Appendix C - Contingency Lists.pdf
955 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691182/13/2026 62 C12Ph2 - Attachment 6 - Generator Dynamic Data - Q1550pdf
6.2 C12Ph2 - Attachment 6 - Generator Dynamic Data - Q1550.pdf
8 page(s)
 CEC/Docket Unit Climate Edge Law Group
2691172/13/2026 61 C12Ph2 - Attachment 10 - Substation and Transmission Line Work Scope -Q1550pdf
6.1 C12Ph2 - Attachment 10 - Substation and Transmission Line Work Scope -Q1550.pdf
10 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691162/13/2026 68 Q1550_Tanager Storage_C12PhII_Cover Letterpdf
6.8 Q1550_Tanager Storage_C12PhII_Cover Letter.pdf
1 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691152/13/2026 e 67 Q1550-Tanager Storage-Appendix_A-C12PhIIpdf Title
e 6.7 Q1550-Tanager Storage-Appendix_A-C12PhII.pdf
27 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691142/13/2026 12PhII PGE - Appendix H - Short Circuit Study Resultspdf
12PhII PGE - Appendix H - Short Circuit Study Results.pdf
29 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691132/13/2026 C12PhII PGE - Appendix B - System Assumptionspdf
C12PhII PGE - Appendix B - System Assumptions.pdf
56 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691122/13/2026 Appendix I - Deliverability Assessment Results_GBA_C12P2pdf
Appendix I - Deliverability Assessment Results_GBA_C12P2.pdf
5 page(s)
 CEC/Docket UnitClimate Edge Law Group
2691112/13/2026 C12PhII_GreaterBayArea_Interconnection_Area_Report_Addendum01pdf
C12PhII_GreaterBayArea_Interconnection_Area_Report_Addendum01.pdf
53 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691102/13/2026 C12PhII_GreaterBayArea_Interconnection_Area_Reportpdf
C12PhII_GreaterBayArea_Interconnection_Area_Report.pdf
53 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691092/13/2026 C12PhII PGE Greater Bay Area - Appendix J - Energy Storage Charging Reliability Power Flow Resultspdf
C12PhII PGE Greater Bay Area - Appendix J - Energy Storage Charging Reliability Power Flow Results.pdf
138 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691082/13/2026 C12PhII PGE Greater Bay Area - Appendix G - Reliability Assessment Resultspdf
C12PhII PGE Greater Bay Area - Appendix G - Reliability Assessment Results.pdf
3 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691072/13/2026 C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plotspdf
C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots.pdf
960 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691062/13/2026 C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots (reduced)pdf
C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots (reduced).pdf
960 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691052/13/2026 C12PhII PGE Greater Bay Area - Appendix E - Reliability Power Flow Resultspdf
C12PhII PGE Greater Bay Area - Appendix E - Reliability Power Flow Results.pdf
29 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691042/13/2026 C12PhII PGE Greater Bay Area - Appendix D - Power Flow Plotspdf
C12PhII PGE Greater Bay Area - Appendix D - Power Flow Plots.pdf
51 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691032/13/2026 C12PhII PGE Greater Bay Area - Appendix C - Contingency Listspdf
C12PhII PGE Greater Bay Area - Appendix C - Contingency Lists.pdf
955 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691022/13/2026 62 C12Ph2 - Attachment 6 - Generator Dynamic Data - Q1550pdf
6.2 C12Ph2 - Attachment 6 - Generator Dynamic Data - Q1550.pdf
8 page(s)
 CEC/Docket Unit Climate Edge Law Group
2691012/13/2026 61 C12Ph2 - Attachment 10 - Substation and Transmission Line Work Scope -Q1550pdf
6.1 C12Ph2 - Attachment 10 - Substation and Transmission Line Work Scope -Q1550.pdf
10 page(s)
 CEC/Drew BohanClimate Edge Law Group
2691002/13/2026 68 Q1550_Tanager Storage_C12PhII_Cover Letterpdf
6.8 Q1550_Tanager Storage_C12PhII_Cover Letter.pdf
1 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690992/13/2026 e 67 Q1550-Tanager Storage-Appendix_A-C12PhIIpdf Title
e 6.7 Q1550-Tanager Storage-Appendix_A-C12PhII.pdf
27 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690982/13/2026 66 C12_Q1550_Tanager Storage_PhIIResultMin_FINALpdf
6.6 C12_Q1550_Tanager Storage_PhIIResultMin_FINAL.pdf
12 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690952/13/2026 12PhII PGE - Appendix H - Short Circuit Study Resultspdf
12PhII PGE - Appendix H - Short Circuit Study Results.pdf
29 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690942/13/2026 C12PhII PGE - Appendix B - System Assumptionspdf
C12PhII PGE - Appendix B - System Assumptions.pdf
56 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690932/13/2026 Appendix I - Deliverability Assessment Results_GBA_C12P2pdf
Appendix I - Deliverability Assessment Results_GBA_C12P2.pdf
5 page(s)
 CEC/Docket UnitClimate Edge Law Group
2690922/13/2026 C12PhII_GreaterBayArea_Interconnection_Area_Report_Addendum01pdf
C12PhII_GreaterBayArea_Interconnection_Area_Report_Addendum01.pdf
53 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690912/13/2026 C12PhII_GreaterBayArea_Interconnection_Area_Reportpdf
C12PhII_GreaterBayArea_Interconnection_Area_Report.pdf
53 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690902/13/2026 C12PhII PGE Greater Bay Area - Appendix J - Energy Storage Charging Reliability Power Flow Resultspdf
C12PhII PGE Greater Bay Area - Appendix J - Energy Storage Charging Reliability Power Flow Results.pdf
138 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690892/13/2026 C12PhII PGE Greater Bay Area - Appendix G - Reliability Assessment Resultspdf
C12PhII PGE Greater Bay Area - Appendix G - Reliability Assessment Results.pdf
3 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690882/13/2026 C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plotspdf
C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots.pdf
960 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690872/13/2026 C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots (reduced)pdf
C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots (reduced).pdf
960 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690862/13/2026 C12PhII PGE Greater Bay Area - Appendix E - Reliability Power Flow Resultspdf
C12PhII PGE Greater Bay Area - Appendix E - Reliability Power Flow Results.pdf
29 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690852/13/2026 C12PhII PGE Greater Bay Area - Appendix D - Power Flow Plotspdf
C12PhII PGE Greater Bay Area - Appendix D - Power Flow Plots.pdf
51 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690842/13/2026 C12PhII PGE Greater Bay Area - Appendix C - Contingency Listspdf
C12PhII PGE Greater Bay Area - Appendix C - Contingency Lists.pdf
955 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690832/13/2026 62 C12Ph2 - Attachment 6 - Generator Dynamic Data - Q1550pdf
6.2 C12Ph2 - Attachment 6 - Generator Dynamic Data - Q1550.pdf
8 page(s)
 CEC/Docket Unit Climate Edge Law Group
2690822/13/2026 61 C12Ph2 - Attachment 10 - Substation and Transmission Line Work Scope -Q1550pdf
6.1 C12Ph2 - Attachment 10 - Substation and Transmission Line Work Scope -Q1550.pdf
10 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690812/13/2026 68 Q1550_Tanager Storage_C12PhII_Cover Letterpdf
6.8 Q1550_Tanager Storage_C12PhII_Cover Letter.pdf
1 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690802/13/2026 e 67 Q1550-Tanager Storage-Appendix_A-C12PhIIpdf Title
e 6.7 Q1550-Tanager Storage-Appendix_A-C12PhII.pdf
27 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690792/13/2026 66 C12_Q1550_Tanager Storage_PhIIResultMin_FINALpdf
6.6 C12_Q1550_Tanager Storage_PhIIResultMin_FINAL.pdf
12 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690782/13/2026 64 C12Ph2 - Attachment 8 - Preliminary Protection Requirements - Q1550_Rev2pdf
6.4 C12Ph2 - Attachment 8 - Preliminary Protection Requirements - Q1550_Rev2.pdf
3 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690772/13/2026 12PhII PGE - Appendix H - Short Circuit Study Resultspdf
12PhII PGE - Appendix H - Short Circuit Study Results.pdf
29 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690762/13/2026 C12PhII PGE - Appendix B - System Assumptionspdf
C12PhII PGE - Appendix B - System Assumptions.pdf
56 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690752/13/2026 Appendix I - Deliverability Assessment Results_GBA_C12P2pdf
Appendix I - Deliverability Assessment Results_GBA_C12P2.pdf
5 page(s)
 CEC/Docket UnitClimate Edge Law Group
2690742/13/2026 C12PhII_GreaterBayArea_Interconnection_Area_Report_Addendum01pdf
C12PhII_GreaterBayArea_Interconnection_Area_Report_Addendum01.pdf
53 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690732/13/2026 C12PhII_GreaterBayArea_Interconnection_Area_Reportpdf
C12PhII_GreaterBayArea_Interconnection_Area_Report.pdf
53 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690722/13/2026 C12PhII PGE Greater Bay Area - Appendix J - Energy Storage Charging Reliability Power Flow Resultspdf
C12PhII PGE Greater Bay Area - Appendix J - Energy Storage Charging Reliability Power Flow Results.pdf
138 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690712/13/2026 C12PhII PGE Greater Bay Area - Appendix G - Reliability Assessment Resultspdf
C12PhII PGE Greater Bay Area - Appendix G - Reliability Assessment Results.pdf
3 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690702/13/2026 C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plotspdf
C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots.pdf
960 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690692/13/2026 C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots (reduced)pdf
C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots (reduced).pdf
960 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690682/13/2026 C12PhII PGE Greater Bay Area - Appendix E - Reliability Power Flow Resultspdf
C12PhII PGE Greater Bay Area - Appendix E - Reliability Power Flow Results.pdf
29 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690672/13/2026 C12PhII PGE Greater Bay Area - Appendix D - Power Flow Plotspdf
C12PhII PGE Greater Bay Area - Appendix D - Power Flow Plots.pdf
51 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690662/13/2026 C12PhII PGE Greater Bay Area - Appendix C - Contingency Listspdf
C12PhII PGE Greater Bay Area - Appendix C - Contingency Lists.pdf
955 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690652/13/2026 62 C12Ph2 - Attachment 6 - Generator Dynamic Data - Q1550pdf
6.2 C12Ph2 - Attachment 6 - Generator Dynamic Data - Q1550.pdf
8 page(s)
 CEC/Docket Unit Climate Edge Law Group
2690642/13/2026 61 C12Ph2 - Attachment 10 - Substation and Transmission Line Work Scope -Q1550pdf
6.1 C12Ph2 - Attachment 10 - Substation and Transmission Line Work Scope -Q1550.pdf
10 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690632/13/2026 68 Q1550_Tanager Storage_C12PhII_Cover Letterpdf
6.8 Q1550_Tanager Storage_C12PhII_Cover Letter.pdf
1 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690622/13/2026 e 67 Q1550-Tanager Storage-Appendix_A-C12PhIIpdf Title
e 6.7 Q1550-Tanager Storage-Appendix_A-C12PhII.pdf
27 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690612/13/2026 66 C12_Q1550_Tanager Storage_PhIIResultMin_FINALpdf
6.6 C12_Q1550_Tanager Storage_PhIIResultMin_FINAL.pdf
12 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690602/13/2026 64 C12Ph2 - Attachment 8 - Preliminary Protection Requirements - Q1550_Rev2pdf
6.4 C12Ph2 - Attachment 8 - Preliminary Protection Requirements - Q1550_Rev2.pdf
3 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690592/13/2026 63 C12Ph2 - Attachment 7 - Transient Stability Plots - Q1550pdf
6.3 C12Ph2 - Attachment 7 - Transient Stability Plots - Q1550.pdf
67 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690532/13/2026 12PhII PGE - Appendix H - Short Circuit Study Resultspdf
12PhII PGE - Appendix H - Short Circuit Study Results.pdf
29 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690522/13/2026 C12PhII PGE - Appendix B - System Assumptionspdf
C12PhII PGE - Appendix B - System Assumptions.pdf
56 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690512/13/2026 Appendix I - Deliverability Assessment Results_GBA_C12P2pdf
Appendix I - Deliverability Assessment Results_GBA_C12P2.pdf
5 page(s)
 CEC/Docket UnitClimate Edge Law Group
2690502/13/2026 C12PhII_GreaterBayArea_Interconnection_Area_Report_Addendum01pdf
C12PhII_GreaterBayArea_Interconnection_Area_Report_Addendum01.pdf
53 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690492/13/2026 C12PhII_GreaterBayArea_Interconnection_Area_Reportpdf
C12PhII_GreaterBayArea_Interconnection_Area_Report.pdf
53 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690482/13/2026 C12PhII PGE Greater Bay Area - Appendix J - Energy Storage Charging Reliability Power Flow Resultspdf
C12PhII PGE Greater Bay Area - Appendix J - Energy Storage Charging Reliability Power Flow Results.pdf
138 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690472/13/2026 C12PhII PGE Greater Bay Area - Appendix G - Reliability Assessment Resultspdf
C12PhII PGE Greater Bay Area - Appendix G - Reliability Assessment Results.pdf
3 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690462/13/2026 C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plotspdf
C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots.pdf
960 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690452/13/2026 C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots (reduced)pdf
C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots (reduced).pdf
960 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690442/13/2026 C12PhII PGE Greater Bay Area - Appendix E - Reliability Power Flow Resultspdf
C12PhII PGE Greater Bay Area - Appendix E - Reliability Power Flow Results.pdf
29 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690432/13/2026 C12PhII PGE Greater Bay Area - Appendix D - Power Flow Plotspdf
C12PhII PGE Greater Bay Area - Appendix D - Power Flow Plots.pdf
51 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690422/13/2026 C12PhII PGE Greater Bay Area - Appendix C - Contingency Listspdf
C12PhII PGE Greater Bay Area - Appendix C - Contingency Lists.pdf
955 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690412/13/2026 62 C12Ph2 - Attachment 6 - Generator Dynamic Data - Q1550pdf
6.2 C12Ph2 - Attachment 6 - Generator Dynamic Data - Q1550.pdf
8 page(s)
 CEC/Docket Unit Climate Edge Law Group
2690402/13/2026 61 C12Ph2 - Attachment 10 - Substation and Transmission Line Work Scope -Q1550pdf
6.1 C12Ph2 - Attachment 10 - Substation and Transmission Line Work Scope -Q1550.pdf
10 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690392/13/2026 68 Q1550_Tanager Storage_C12PhII_Cover Letterpdf
6.8 Q1550_Tanager Storage_C12PhII_Cover Letter.pdf
1 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690382/13/2026 e 67 Q1550-Tanager Storage-Appendix_A-C12PhIIpdf Title
e 6.7 Q1550-Tanager Storage-Appendix_A-C12PhII.pdf
27 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690372/13/2026 66 C12_Q1550_Tanager Storage_PhIIResultMin_FINALpdf
6.6 C12_Q1550_Tanager Storage_PhIIResultMin_FINAL.pdf
12 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690362/13/2026 64 C12Ph2 - Attachment 8 - Preliminary Protection Requirements - Q1550_Rev2pdf
6.4 C12Ph2 - Attachment 8 - Preliminary Protection Requirements - Q1550_Rev2.pdf
3 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690352/13/2026 63 C12Ph2 - Attachment 7 - Transient Stability Plots - Q1550pdf
6.3 C12Ph2 - Attachment 7 - Transient Stability Plots - Q1550.pdf
67 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690342/13/2026 Q1550-Tanager Storage-2021_Reassessment_Report_Addendum 1-5pdf
Q1550-Tanager Storage-2021_Reassessment_Report_Addendum 1-5.pdf
61 page(s)
 CEC/Docket UnitClimate Edge Law Group
2690333/11/2026 CEC Response to Los Esteros Critical Energy Facilities' Application for Confidential Designation
Response to (TN 268635).
2 page(s)
 Jeff Harris / Climate Edge Group California Energy Commission
2690322/13/2026 12PhII PGE - Appendix H - Short Circuit Study Resultspdf
12PhII PGE - Appendix H - Short Circuit Study Results.pdf
29 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690312/13/2026 C12PhII PGE - Appendix B - System Assumptionspdf
C12PhII PGE - Appendix B - System Assumptions.pdf
56 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690302/13/2026 Appendix I - Deliverability Assessment Results_GBA_C12P2pdf
Appendix I - Deliverability Assessment Results_GBA_C12P2.pdf
5 page(s)
 CEC/Docket UnitClimate Edge Law Group
2690292/13/2026 C12PhII_GreaterBayArea_Interconnection_Area_Report_Addendum01pdf
C12PhII_GreaterBayArea_Interconnection_Area_Report_Addendum01.pdf
53 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690282/13/2026 C12PhII_GreaterBayArea_Interconnection_Area_Reportpdf
C12PhII_GreaterBayArea_Interconnection_Area_Report.pdf
53 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690272/13/2026 C12PhII PGE Greater Bay Area - Appendix J - Energy Storage Charging Reliability Power Flow Resultspdf
C12PhII PGE Greater Bay Area - Appendix J - Energy Storage Charging Reliability Power Flow Results.pdf
138 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690262/13/2026 C12PhII PGE Greater Bay Area - Appendix G - Reliability Assessment Resultspdf
C12PhII PGE Greater Bay Area - Appendix G - Reliability Assessment Results.pdf
3 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690252/13/2026 C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plotspdf
C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots.pdf
960 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690242/13/2026 C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots (reduced)pdf
C12PhII PGE Greater Bay Area - Appendix F - Bulk System Transient Stability Plots (reduced).pdf
960 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690232/13/2026 C12PhII PGE Greater Bay Area - Appendix E - Reliability Power Flow Resultspdf
C12PhII PGE Greater Bay Area - Appendix E - Reliability Power Flow Results.pdf
29 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690222/13/2026 C12PhII PGE Greater Bay Area - Appendix D - Power Flow Plotspdf
C12PhII PGE Greater Bay Area - Appendix D - Power Flow Plots.pdf
51 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690212/13/2026 C12PhII PGE Greater Bay Area - Appendix C - Contingency Listspdf
C12PhII PGE Greater Bay Area - Appendix C - Contingency Lists.pdf
955 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690202/13/2026 62 C12Ph2 - Attachment 6 - Generator Dynamic Data - Q1550pdf
6.2 C12Ph2 - Attachment 6 - Generator Dynamic Data - Q1550.pdf
8 page(s)
 CEC/Docket Unit Climate Edge Law Group
2690192/13/2026 61 C12Ph2 - Attachment 10 - Substation and Transmission Line Work Scope -Q1550pdf
6.1 C12Ph2 - Attachment 10 - Substation and Transmission Line Work Scope -Q1550.pdf
10 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690182/13/2026 68 Q1550_Tanager Storage_C12PhII_Cover Letterpdf
6.8 Q1550_Tanager Storage_C12PhII_Cover Letter.pdf
1 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690172/13/2026 e 67 Q1550-Tanager Storage-Appendix_A-C12PhIIpdf Title
e 6.7 Q1550-Tanager Storage-Appendix_A-C12PhII.pdf
27 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690162/13/2026 66 C12_Q1550_Tanager Storage_PhIIResultMin_FINALpdf
6.6 C12_Q1550_Tanager Storage_PhIIResultMin_FINAL.pdf
12 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690152/13/2026 64 C12Ph2 - Attachment 8 - Preliminary Protection Requirements - Q1550_Rev2pdf
6.4 C12Ph2 - Attachment 8 - Preliminary Protection Requirements - Q1550_Rev2.pdf
3 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690142/13/2026 63 C12Ph2 - Attachment 7 - Transient Stability Plots - Q1550pdf
6.3 C12Ph2 - Attachment 7 - Transient Stability Plots - Q1550.pdf
67 page(s)
 CEC/Drew BohanClimate Edge Law Group
2690132/13/2026 Q1550-Tanager Storage-2021_Reassessment_Report_Addendum 1-5pdf
Q1550-Tanager Storage-2021_Reassessment_Report_Addendum 1-5.pdf
61 page(s)
 CEC/Docket UnitClimate Edge Law Group
2690122/13/2026 Confidential Attachment DR-A46, One-Line Diagram of Los Esteros Substation 4919-6753-8316 v2pdf
Confidential Attachment DR-A46, One-Line Diagram of Los Esteros Substation 4919-6753-8316 v.2.pdf
1 page(s)
 CEC/Drew Bohan Climate Edge Law Group
2688692/27/2026 Data Response Set 2B Tanager Battery Energy Storage System Project
Data Response Set 2B Tanager Battery Energy Storage System Project
Transmission System Engineering
4 page(s)
 CEC/DocketsClimate Edge Law Group
2686352/13/2026 Application for Confidential Designation_Interconnection Documents
Application for Confidential Designation_Interconnection Documents
4 page(s)
  Climate Edge Law Group
2685091/29/2026 Slip Sheet Confidential Filing CEC Docket
Slip Sheet Confidential Filing CEC Docket
1 page(s)
 CEC/Docket UnitClimate Edge Law Group
2685062/6/2026 e CECs response to Climate Edge Law Group's Application for Confidentiality

2 page(s)
 CEC/DocketsCalifornia Energy Commission
2684161/30/2026 Data Response Set 2A Tanager BESS
Data Response Set 2A Tanager BESS
Project Description
37 page(s)
 CEC/Docket UnitClimate Edge Law Group
2683661/29/2026 Repeated Application for Confidential Designation
Repeated Application for Confidential Designation
2 page(s)
 CEC/Docket Unit/Drew BohanClimate Edge Law Group
2682681/20/2026 Los Esteros Critical Energy Facility, Data Response Set 1C
Los Esteros Critical Energy Facility, Data Response Set 1C
27 page(s)
 CEC/DocketsClimate Edge Law Group
26757311/18/2025 Petition for Post Certification Modification for Los Esteros Tanager BESS
(03-AFC-02C) Project Staff's Data Request Set 2, A42 through A63
Compliance
9 page(s)
 CEC Docket UnitCalifornia Energy Commission
26746211/17/2025 Tanager BESS Project Data Response Set 1B

112 page(s)
 CEC/Docket UnitClimate Edge Law Group
26711410/15/2025 CONFIDENTIAL_DO NOT DOCKET_Attachment_UL_9540A_Test_Report
CONFIDENTIAL_DO NOT DOCKET_Attachment_UL_9540A_Test_Report
40 page(s)
 CEC/Drew BohanClimate Edge Law Group
26711311/10/2025 California Energy Comission's Response Letter to Los Esteros App for Confidentiality

4 page(s)
 CEC/DocketsCalifornia Energy Commission
26698910/7/2025 Confidential Data Response A15_Cultural Memos
  Climate Edge Law Group
26698811/3/2025 CEC Response to Los Esteros Critical Energy's Repeated Application for Confidentiality

2 page(s)
 Jeff Harris / Samantha NeumyerCalifornia Energy Commission
26696410/31/2025 ROC - CEC and CARB HFC Reduction Team
ROC between CEC STEP AQ unit staff and CARB's HFC Reduction team
Greenhouse Gases
3 page(s)
 CEC/DocketsCalifornia Energy Commission
26660110/15/2025 LECEF Tanager BESS_Application for Confidential Designation_Worker Safety and Fire Protection
LECEF Tanager BESS_Application for Confidential Designation_Worker Safety and Fire Protection
4 page(s)
 CEC/Drew BohanClimate Edge Law Group
26636810/7/2025 Repeated Application for Confidential Designation Cultural DRA15
  Climate Edge Law Group
26630510/3/2025 LECEF Tanager BESS Data Response Set 1
LECEF Tanager BESS Data Response Set 1
Project Description
38 page(s)
 CEC/Docket Unit Climate Edge Law Group
2644526/25/2025 Tanager BESS Data Request Set 1
Tanager BESS Data Request Set 1
Compliance
14 page(s)
 Brenda McBride, Calpine CorporationCalifornia Energy Commission
2622341/24/2025 LECEF Petition for Modification Tanager BESS Project Confidential Appendix C - Biological Environmental Setting Assessment

48 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2622331/24/2025 LECEF Petition for Modification Tanager BESS Project Confidential Appendix E – Cultural Resources Assessment

1 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2622233/18/2025 CEC’s Response Letter to Los Estero’s Applications for Confidential Designation - Bio and

3 page(s)
 Samantha N. / Jeffery H.California Energy Commission
2621023/5/2025 Los Esteros Staff Change to Verification of AQ-45
Lost Esteros Staff Change to Verification of AQ-45
Compliance
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2619732/25/2025 Ada Marquez Comments - Comment period

1 page(s)
 CEC / Docket UnitAda Marquez
2617282/12/2025 Los Esteros Critical Energy Facility (03-AFC-02C) Petition for Modification Tanager Battery Energy Storage System Project
Summary of Post Certification Petition
Compliance
3 page(s)
 CEC/Docket Unit California Energy Commission
2612841/24/2025 Los Esteros Critical Energy Facility (03-AFC-02C) Application for Confidential Designation for Cultural Resources Information

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2612811/24/2025 Los Esteros Critical Energy Facility (03-AFC-02C) Application for Confidential Designation for Biological Resources Information

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2612801/24/2025 Los Esteros Critical Energy Facility (03-AFC-02C) Petition for Modification Tanager Battery Energy Storage System Project

230 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
2343828/20/2020 Statement of Staff Approval of Proposed Change

43 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23112312/11/2019 Annual Compliance Report 2018-2019

75 page(s)
 CEC/John HeiserLos Esteros Critical Energy Facility, LLC
2293058/9/2019 Los Esteros Critical Energy Facility Responses to Staff Data Requests Set 2 A1-A6 and Minor Revisions to Proposed Modification

12 page(s)
 CEC/John HeiserEllison Schneider Harris & Donlan LLP
2292688/7/2019 Los Esteros Critical Energy Facility Cooling Tower Amendment Response to Staff's Data Requests Set 2 A1 through A4

14 page(s)
 CEC/John HeiserEllison Schneider Harris & Donlan LLP
2282375/13/2019 Staff’s Data Requests Set 2 A1 through A6
Post-Certification Petition for Los Esteros Critical Energy Facility
4 page(s)
 Calpine Corporation/Barbara McBrideCalifornia Energy Commission
2282245/9/2019 CEC Staff's Data Requests, Set 2, A1 through A4

4 page(s)
 Calpine Corporation/Barbara McBrideCalifornia Energy Commission
2278014/19/2019 Record of Conversation between Project Owner and Staff
Record of Conversation regarding clarification on proposed vanadium flow battery chemistry
Hazardous Materials
10 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22599111/30/2018 Applicant's Responses to Staff's Data Requests, Set 1, A1 through A8

6 page(s)
 CEC/John HeiserEllison Schneider Harris & Donlan LLP
22560110/30/2018 Compliance Docketing Policy

3 page(s)
 Plant ManagerCalifornia Energy Commission
22554610/30/2018 Cooling Tower Amendment to Los Esteros Critical Energy Facility License, Staff's Data Requests, Set 1, A1 Through A8
Letter
6 page(s)
 Calpine Corporation/Barbara McBrideCalifornia Energy Commission
22487010/2/2018 Los Esteros Critical Energy Facility Responses to Staff's Data Requests, Set 1, A1 through A23

25 page(s)
 CEC/John HeiserEllison Schneider Harris & Donlan LLP
2247479/18/2018 Petition to Amend the California Energy Commission Decision

3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2246799/10/2018 Los Esteros Critical Energy Facility II Phase 2 - Final Commission Decision
October 2006
435 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2245698/22/2018 Petition to Amend (PTA) the Commission Decision
The Petition to Amend (PTA) requests modification of the conditions of certification for the facility to increase the water circulation rate through the cooling tower and modification of the air quality conditions of certification to conform to the Title V Operating Permit and remove provisions that are longer applicable.
Compliance
71 page(s)
 CEC/DocketsCalifornia Energy Commission
22196012/13/2017 Post-Certification Petition for Los Esteros Critical Energy Facility (03-AFC-02C), Staff's Data Requests, Set 1, A1 through A23

10 page(s)
 Calpine Corporation/Barbara McBrideCalifornia Energy Commission
22163710/27/2017 Notice of Receipt Petition to Amend the California Energy Commission Decision for the Los Esteros Critical Energy Facility

3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
221243-19/19/2017 Los Esteros Critical Energy Center Cover Letter for Petition for Modification
Petition for Modification for addition of battery storage at the Los Esteros Critical Energy Facility.
1 page(s)
 CEC/Anwar AliCalpine
221243-29/19/2017 Los Esteros Critical Energy Center Amendment Petition for Modification
Petition for Modification to add battery storage at the Los Esteros Critical Energy Facility
23 page(s)
 CEC/Anwar AliCalpine
2018052/27/2014 CEC Response to Application for Confidential Designation of Final Paleontological Resources Report

2 page(s)
 Ellison Schneider & Harris, LLP.California Energy Commission
2017221/27/2014 CONFIDENTIAL - PAL-6 Final Paleontological Resources Report

Geology/Paleontology
17 page(s)
 CEC/Robert OglesbyEllison, Schneider & Harris L.L.P.
2016051/27/2014 Application for Confidential Designation

Geology/Paleontology
3 page(s)
 CEC/Robert OglesbyEllison, Schneider & Harris L.L.P.
2004049/6/2013 Order Approving Petition to Amend the Monitoring and Initial Source Testing Conditions and Allow for Additional Turbine On-Site

Air Quality
12 page(s)
  California Energy Commission
2003588/27/2013 Los Esteros 2 AQ Amend Notice of Decision
Notice of Decision for 2013 AQ Amendments
2 page(s)
  California Energy Commission
2001338/8/2013 Comments by the Los Esteros Critical Energy Facility on the CEC Staff Analysis of Proposed Air Quality Amendments

2 page(s)
 CEC/Craig HoffmanEllison, Schneider & Harris L.L.P.
716917/22/2013 Staff Analysis of Proposed Air Quality Amendments, Including Monitoring, Initial Source Testing, and Other Administrative Conditions

30 page(s)
 Interested PartiesCEC/C.Hoffman
710275/10/2013 Los Esteros Letter to C. Stora re BAAQMD Application 24977

1 page(s)
 CEC/C. StoraLos Esteros
710265/10/2013 BAAQMD Draft Evaluation Report

26 page(s)
 CEC/Docket UnitCEC/ C. Stora
6886812/13/2012 Data Request no. 1 and 2

2 page(s)
 Los Esteros Critical Energy Facility/K.SchwagerCEC/C.Stora
6878712/6/2012 LECEF Amendment No. 5 - Section 5.1 List of Property Owners

1 page(s)
 CEC/Docket UnitCEC/Christine Stora
6873412/3/2012 Notice of Receipt - Petition to Amend

3 page(s)
 CEC/Docket UnitCEC/C.Marxen
6869911/28/2012 Amendment No.5

22 page(s)
 CEC/C.StoraEllison, Schneider & Harris L.L.P./D.Wittenborn
604555/2/2011 Los Esteros Letter regarding Start of Construction

1 page(s)
 Los Esteros Energy Facility/ M. WeinbergCEC/ C. Hoffman
604294/28/2011 Condition of Certification CUL-3 Cultural Resources Monitoring and Mitigation Plan

74 page(s)
 CEC/C.HoffmanLos Esteros Critical Energy Facility LLC/A.Bryan
604284/28/2011 Condition of Certification TRANS-1 Construction Traffic Plan

17 page(s)
 CEC/C.HoffmanLos Esteros Critical Energy Facility LLC/A.Bryan
596412/8/2011 Order Amending The Energy Commission Decision

16 page(s)
 CEC/ Docket UnitCEC/ K. Douglas
596092/7/2011 Notice of Decision in Compliance by CEC C. Snow

1 page(s)
 Califirnia Resources AgencyCEC/ C. Snow
594211/5/2011 Notice of Energy Commission Staff Errata to Staff Assessment Air Quality Section

5 page(s)
 CEC/Docket UnitCEC/ C. Snow
5927612/17/2010 Staff Analysis of Proposed Project Modifications

50 page(s)
 CEC/ DocketUnitCEC/C. Marxen
5894911/4/2010 Request for Renewal - Authority to Construct

60 page(s)
 CEC/Docket UnitCEC/C. Stora
5894611/3/2010 Nitrogen Dioxide Modeling

1 page(s)
 CEC/C. StoraCalpine Corp./B. McBride
5893311/2/2010 1 Hour NO2 Modeling Assessment

9 page(s)
 CEC/C. StoraLos Esteros Critical Energy Facility LLC
5878510/14/2010 Approval of Facility Design Change

1 page(s)
 Los Esteros Critical Energy Facility/B. McBrideCEC/J. Caswell
5428311/30/2009 Amendment #4 Data Request 1

3 page(s)
 Ellison Schneider & Harris LLP/ G. WheatlandCEC/ C. Davis
5406111/12/2009 Notice of Receipt - Petition to Amend

3 page(s)
 CEC/ Docket UnitCEC/ E. Allen
526588/3/2009 Los Estero Critical Energy Facility - Phase 2 CBO MOU

7 page(s)
 CEC/ A. Jarez-GarciaAIMS Corporation/ D. Wimberly
503753/4/2009 Letter to Withdraw Amendment Petition

1 page(s)
 CEC/ C. DavisCalpine/ B. McBride
3855812/5/2006 Notice of Recipt of petition to amend

3 page(s)
 CEC/ Dockets unitCEC/ R. Johnson
3809410/6/2006 Petition to amend los esteros ce facility's cond of cer

1 page(s)
 CEC/ L. ShawCalpine/ B. McBride
372216/30/2006 E-mail informing that the Applicant will not be filing a response.

2 page(s)
 G. Fay/ CECJ. Harris/ Ellison, Schneider & Harris L.L.P.
371616/22/2006 Los Esteros Critical Energy Facility (03-AFC-2C Simple-Cycle Project) Waste-6 Petition to Amend Data Requests.

3 page(s)
 Calpine South Bay Projects/C. SpandriCEC/L. Shaw
368675/1/2006 NOTICE OF RECEIPT__Petition to Amend the Energy Commission Decision for the 03-AFC-2C

3 page(s)
 CEC/Docket UnitCEC/R Johnson
368124/20/2006 Email response to CEC concerning Waste- 6 Amendment for Los Esteros.

2 page(s)
 Lance Shaw/CEC/Docket UnitCALPine/Chuck Spandri
367334/14/2006 Petition to amend Los Esteros critical Energy Facility, LLC. Conditions of Certification.

5 page(s)
 CEC/ShawCalpine/Spandri
366393/27/2006 Petition to Amend Conditions of Certification

5 page(s)
 Mr. Lance Shaw/CEC/Docket UnitCALPINE/C. Spandri
352008/10/2005 Data Requests.

7 page(s)
 Dana Petrin/CEC/Docket UnitCEC/L. Shaw
348946/28/2005 Petition to Amend Los Esteros Critical Energy Facility Conditions of Certification.

15 page(s)
 Lance Shaw/CEC/Docket UnitCalPine
341724/19/2005 Permit

2 page(s)
 CEC/DocketsSanta Clara Valley Water District/Tippets
341654/19/2005 Permit

3 page(s)
 Docket UnitSanta Clara Valley Water Distric/ S. A. Tippets