202397 | 5/29/2014 |
Air Quality E-mail from Project Air Quality 1 page(s)
| | CEC / Dale Runquist | Palomar Jason Dobbs |
202396 | 5/29/2014 |
Palomar CEMS Start-up Data Air Quality 6 page(s)
| | | California Energy Commission |
43325 | 11/13/2007 |
Visible Plume Analysis
7 page(s)
| | CEC / Docket Unit | CEC / D. Rundquist |
42581 | 10/1/2007 |
Letter Regarding the CAISO Approved Maximum Output for the PEP
1 page(s)
| | SDG&E/L. Brown | CAISO/J. Nickel |
39569 | 3/12/2007 |
Bimbo Bakeries USA Response to Notice of insignificant change to add inlet chiller for the palomar energy center.
3 page(s)
| | CEC/C. Bruins | BB/ G. Clark |
39116 | 2/6/2002 |
Exhibit List for the Palomar Energy Project
8 page(s)
| | CEC/ Docket Unit | CEC/ R. Rodriguez |
36417 | 2/28/2006 |
Petition for change of ownership and Operational Control.
3 page(s)
| | Docket Unit | CEC/ C. Bruins |
29936 | 9/23/2003 |
Revised Proof of Service (revised 9/23/03).
4 page(s)
| | All Parties/Cec/dockets | Read/Cec |
29924 | 9/17/2003 |
Palomar Order for Reconsideration
2 page(s)
| | CEC/Reed/docket | C. Briggs |
29886 | 9/12/2003 |
Palomar Order for Reconsideration
2 page(s)
| | Read/Cec/dockets | Briggs/Briggs Law Corporation |
29857 | 9/9/2003 |
Declaration of Song Her for the Palomar Energy Project
2 page(s)
| | CEC/Dockets | Song Her |
29855 | 9/9/2003 |
Commission Order Upon Reconsideration, Order #03-0909-05 - POS.
7 page(s)
| | CEC/Dockets | Keese/Pernell/geesman/cec |
29849 | 9/8/2003 |
Internenor Bill Powers' Petition for Reconsideration of Commission decision on Palomar Energy Project and Adoption Order - POS.
8 page(s)
| | CEC/Dockets | Briggs/Briggs Law Corporation |
29846 | 9/8/2003 |
Applicant's Responses to Intervenor's Petition for Reconsideration of Commission Decision on Palomar Energy Project and Adoption Order and Applicant's Response to Intervenor's Request that Commission Order Adopted on 8/6/03 be Nullified and Voided - POS.
12 page(s)
| | Epps/Cec/dockets | Miller/Palomar Energy |
29710 | 8/26/2003 |
Intervenor's request that Commission Order Adopted on August 6, 2003, be nullified and voided
5 page(s)
| | Dockets/Cec | Energy Resources Conservation & Development Commis |
29578 | 8/11/2003 |
Evidentiary Hearing Before the California Energy Resources Conservation and Development
57 page(s)
| | CEC/Dockets | CEC Cec |
29561 | 8/8/2003 |
Final Commission Decision (August 2003) for Palomar Energy Project
424 page(s)
| | CEC/Dockets | CEC/Commissioners |
29530 | 8/11/2003 |
State OKs Escondido power plant. After 18 months of review, state officials decided Wednesday that Escondido indeed be home to Sempra Energy Resources' proposed 546-megawatt power plant.
3 page(s)
| | CEC/Dockets | Nctimes.com/Massey |
29529 | 8/11/2003 |
The California Energy Commission yesterday unanimously approved granting Sempra Energy Resources a license to build and operate a 550-megawatt power plant on the city's west side.
2 page(s)
| | CEC/Dockets | Signonsandiego.com/Chacon |
29500 | 8/6/2003 |
Letter regarding desire to address commission
1 page(s)
| | Public Advisor/Cec | Briggs |
29488 | 8/6/2003 |
Filing of Notice of Decision in Compliance with Public Resources Code Section 21080.5 and Title 20, California Code fo Regulations, Section 1768
3 page(s)
| | Office Of Planning/Research/ California Resources | CEC Cec |
29483 | 8/5/2003 |
Report of Conversation
1 page(s)
| | CEC/Dockets | CEC/Gefter |
29482 | 8/5/2003 |
Intervenor's Request for Formal Explanation of Comment Suggesting Ex Parte Communication Between Commission and Applicant
20 page(s)
| | CEC/Dockets | Briggs Law Corporation |
29478 | 8/6/2003 |
Errata to the Presiding Member's Proposed Decision
10 page(s)
| | CEC Cec | CEC/Keese/geesman |
29474 | 8/1/2003 |
Palomar Testimony
1 page(s)
| | CEC/Dockets | S. Lorusso |
29472 | 8/1/2003 |
Mr. Sarvey's Comments on the PMPD for the Palomar Project.
12 page(s)
| | CEC/Dockets | B. Sarvey |
29460 | 8/1/2003 |
Response to Applicant's July 24, 2003 Comments on the PMPD - Response to Three Air Quality Issues Identified in the Notice of Committee Conference. -- POS
67 page(s)
| | CEC/Dockets | Powers Engineering/B. Powers |
29444 | 7/29/2003 |
Water Agencies Blame Each Other for Shortage Risk
3 page(s)
| | CEC/Dockets | Conaughton |
29443 | 7/29/2003 |
San Diego Facing Possibility of Water Shortages in Summer Heat
2 page(s)
| | CEC/Dockets | Hettena |
29436 | 7/30/2003 |
Letter regarding reconsideration of PMPD
1 page(s)
| | CEC/Dockets | Klavzar |
29425 | 7/24/2003 |
Comments on PMPD for POS
11 page(s)
| | CEC/Geesman/keese/dockets | Powers/Powers |
29418 | 7/25/2003 |
Applicants Comments on the PMPD for Palomar Energy Project
2 page(s)
| | CEC/Dockets | Sempra/Marin |
29389 | 7/24/2003 |
Enclosed 11 copies of the Applicant's Comments on the Presiding Member's Proposed Decision---POS
15 page(s)
| | Dockets | Palomar Energy/Miller |
29380 | 7/24/2003 |
Commission Staff's PMPD Comments, The Energy Commission staff ("staff") offers the following comments and corrections regarding the Presiding Member's Proposed Decision for the Palomar Energy Project---POS
11 page(s)
| | CEC/Energy Resources Conservation & Development Co | CEC/Kramer |
29376 | 7/23/2003 |
PEP, Presiding Member's Proposed Decision (PMPD) The summary decision indicates that the rational for determining if the PEP compilies with all applicable laws, ordinances, regulations, and standards, and therefore be licensed is based exclusively upon the record established during the certification proceedings.
2 page(s)
| | CEC/Docket | Rodriguez |
29374 | 7/24/2003 |
Enclosed for filing are the original and twelve copies of the Comments of the City of Escondido on the Presiding Member's Proposed Decision.
10 page(s)
| | Docket/Cec | Braun & Blaising/Blaising |
29341 | 7/8/2003 |
E-mail regarding opening the record of the Palomar Project to admit additional source and the possibility of others that have been omitted from the record. The 1,900 tons of air contaminants per year fromt his source alone would require additional mitigation and the probability of additional sources being omitted is extremely high. -POS
3 page(s)
| | CEC/Dockets | Mark Rodriguez |
29147 | 7/2/2003 |
Questions regarding article that appeared in North County Times - POS
3 page(s)
| | CEC/Dockets | Herron |
29144 | 7/2/2003 |
Stripulation Regarding Exhibit 112 - POS
10 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
29126 | 6/27/2003 |
Presiding Member's Proposed Decision - Publication # P800-03-008
537 page(s)
| | CEC/Dockets | CEC Cec |
29112 | 6/27/2003 |
Notice of Availability of the PMPD and Notice of Committee Conference and Notice of Committee Hearing
4 page(s)
| | CEC/Dockets | CEC/Geesman/keese |
28930 | 6/10/2003 |
Addendum # 4 to Staff Assessment - POS
4 page(s)
| | CEC/Geesman/keese/dockets | CEC/Eller |
28892 | 6/2/2003 |
Applicant's Reply Brief (Contested Topics)
17 page(s)
| | CEC/Dockets | Palomar/Miller |
28876 | 6/3/2003 |
Reply Brief of Intervenor Bill Powers Following Evidentiary Hearing on Contested Topics in Opposition to Certification of Application POS
4 page(s)
| | CEC/Dockets | CEC/Briggs |
28873 | 6/2/2003 |
Commission Staff's Post Hearing Rebuttal Brief (Contested Topics) POS
5 page(s)
| | CEC/Dockets | CEC/Kramer |
28853 | 5/30/2003 |
Letter re: Misleading the public on the proposed Palomar Energy Project
1 page(s)
| | CEC/Dockets | Rodriguez |
28832 | 5/27/2003 |
Brief of Intervenor Bill Powers Following Evidentiary Hearing on Contested Topics in Opposition to Certification of Application - POS
67 page(s)
| | CEC/Dockets | Briggs Law Corp/Gonzalez |
28745 | 5/23/2003 |
Applicant's Opening Brief (Contested Topics) - POS
128 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
28743 | 5/23/2003 |
Commission Staff's Post Hearing Brief (Contested Topics) - POS
7 page(s)
| | CEC/Dockets | CEC/Kramer |
28691 | 5/16/2003 |
Exhibit C - Agreement for Reclaimed Water - Recycled Water Service Agreement among City of Escondido , Rincon del Diablo Municipal Water District and Palomar Energy
16 page(s)
| | CEC/Dockets | City Of Escondido |
28690 | 5/12/2003 |
Site Arrangement - Figure 2.4-1
11 page(s)
| | CEC/Dockets | Burns & Mcdonnell |
28687 | 5/15/2003 |
Applicant's Exhibit # 40 - POS
4 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
28619 | 5/2/2003 |
Public Comment Form: Traffic
1 page(s)
| | CEC/Dockets | Morrill |
28617 | 5/2/2003 |
NC Time newspaper article, "Sempre, State Debate Power Plant"
3 page(s)
| | CEC/Dockets | |
28616 | 5/2/2003 |
NC Times Newspaper article, " State Experts: Few Health Risks from Proposed Power Plant"
3 page(s)
| | CEC/Dockets | |
28610 | 5/2/2003 |
Addendum #3 to Staff Assessment - POS
7 page(s)
| | CEC/Geesman/keese/dockets | CEC/Eller |
28604 | 5/1/2003 |
Public Adviser's Status Report # 1
4 page(s)
| | CEC/Geesman/keese/dockets | CEC/Mendonca |
28603 | 5/1/2003 |
Project Mailing List - Evidentiary Hearings
1 page(s)
| | CEC/Dockets | CEC Cec |
28602 | 5/1/2003 |
Public Comment Form - Approving the project
1 page(s)
| | CEC/Dockets | City Of Escondido/Lorey |
28601 | 5/1/2003 |
Comments re: Air-cooling
1 page(s)
| | CEC/Dockets | Concerned Neighbors Of Quail Hills/Lorusso |
28550 | 4/21/2003 |
Commission Staff's Initial Brief (Uncontested Topics) - POS
6 page(s)
| | CEC/Dockets | CEC/Kramer |
28538 | 4/21/2003 |
Applicant's Opening Brief (Uncontested Topics) - POS
133 page(s)
| | CEC/Dockets | Palomar/Miller |
28509 | 4/10/2003 |
Second Repeated Application of Confidential Designation re: Cultural Resources Information
1 page(s)
| | CEC/Larson/docket | Palomar Energy/Miller |
28489 | 4/11/2003 |
Addendum to Tentative Exhibit List
52 page(s)
| | CEC/Dockets | Powers |
28445 | 4/7/2003 |
Rebuttal Testimony Errata - POS
4 page(s)
| | CEC/Dockets | Powers |
28437 | 4/10/2003 |
Modifications to Exhibit 51
2 page(s)
| | CEC/Dockets | |
28432 | 4/8/2003 |
Tentative BPPWG Exhibit List for Palomar
623 page(s)
| | Dockets | Powers |
28431 | 4/8/2003 |
Use of Degraded Water Sources as Cooling Water in Power Plants - Final Report
17 page(s)
| | CEC/Dockets | Epri/Zammit |
28427 | 4/4/2003 |
Commission Staff's Rebuttal Testimony ( Air Quality) - POS
8 page(s)
| | CEC/Dockets | CEC/Kramer |
28420 | 4/4/2003 |
Applicant's Rebuttal Testimony - POS
19 page(s)
| | CEC/Dockets | Palomar/Miller |
28417 | 4/4/2003 |
Rebuttal Testimony of Bill Powers - POS
12 page(s)
| | CEC/Dockets | Powers |
28416 | 4/1/2003 |
Letter requesting CEC to make an efficient pollution free project
2 page(s)
| | CEC/Dockets | Morrill |
28415 | 4/2/2003 |
CD's containing computer files relating to analyses in Palomar Energy's prefiled testimony
4 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
28410 | 4/2/2003 |
Applicant's Errata Sheets for Direct Testimony 0 POS
17 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
28405 | 3/26/2003 |
Applicant's Direct Testimony - POS
186 page(s)
| | CEC/Gefter/dockets | Palomar/Miller |
28401 | 3/26/2003 |
Letter from Albert Abreu, Sempra Energy Resources, 3/26/03, to Mike Lake, San Diego Air Pollution Control District regarding Additional ERC's for Palomar - POS
4 page(s)
| | CEC/Dockets | Palomar/Miller |
28376 | 3/20/2003 |
Notice of Evidentiary Hearings and Hearing Order - POS
11 page(s)
| | CEC/Dockets | CEC/Geesman/keese |
28332 | 3/24/2003 |
Public Comment Form re: Particulate Matter/Air Quality
3 page(s)
| | CEC/Dockets | Shaputnic |
28331 | 3/24/2003 |
Addendum # 2 to Staff Assessment - POS
6 page(s)
| | CEC/Geesman/keese/dockets | CEC/Eller |
28327 | 3/18/2003 |
Bill Powers Expert Testimony Errata - POS
3 page(s)
| | CEC/Dockets | Powers |
28324 | 3/18/2003 |
Article - Consultant Protest Power Plant Plan
3 page(s)
| | CEC/Dockets | North County Times |
28264 | 3/14/2003 |
Bill Powers, P.E. Expert Testimony
15 page(s)
| | CEC/Dockets | Border Power Plant Working Group/Powers |
28263 | 3/17/2003 |
Prehearing Conference Statement Supplement POS
5 page(s)
| | CEC/Dockets | Border Power Plant Working Group/Powers |
28262 | 3/17/2003 |
Ammonia Strip Rate Nomograph Description POS
4 page(s)
| | CEC/Dockets | Khandan |
28261 | 3/17/2003 |
Comments on Prehearing Conference
2 page(s)
| | CEC/Docket | Rodriguez |
28257 | 3/14/2003 |
Bill Powers P.E. Expert Testimony - POS
17 page(s)
| | CEC/Dockets | Border Power Plant Working Group /Powers |
28246 | 3/6/2003 |
Applicant's Pre-Hearing Conference Statement for Palomar - POS
78 page(s)
| | CEC/Dockets | Palomar/Miller |
28245 | 3/6/2003 |
Commission Staff's Pre-Hearing Conference Statement - POS
7 page(s)
| | CEC/Dockets | CEC/Kramer |
28232 | 3/6/2003 |
Pre-Hearing Conference Statement - POS
35 page(s)
| | CEC/Dockets | Boarder Power Plan Working Group/Powers |
28231 | 3/7/2003 |
1. US Fish & Wildlife Service Bio Opinion on the ERTC; 2. Dept of Fish & Game Streambed Alteration Agreement; 3. Calif. Regional Water Quality Control Baoard SWA Sec. 401 Certification; 4. Depart of Army Nationwide Sec. 404 Permit Authoriza5ion for ERTC; and Receipt dated 2/7/03 from State Water Res. Controal Board of the ERTC, Intent to Comp
75 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
28230 | 3/6/2003 |
Public Comments re: 3Pre-Hearing Conference - POS
3 page(s)
| | CEC/Pao/dockets | Rodriguez |
28229 | 3/7/2003 |
Addendum to Staff Assessment - POS
17 page(s)
| | CEC/Geesman/keese/dockets | CEC/Eller |
28228 | 3/10/2003 |
Letter re: Complete Offset Package as Part of its Pre-Hearing Conference Statement
2 page(s)
| | CEC/Gefter/dockets | Air Polluction Control District/Lake |
28216 | 3/3/2003 |
Supplement to Final Determination of Compliance Concerning Prevention of Significant Deterioration Requirement - POS
6 page(s)
| | Sempra/Kelly/cec/eller/dockets | Air Pollution Contrrol Dist/Lake |
28195 | 3/4/2003 |
Comments on the Final Staff Assessment for Palomar
2 page(s)
| | CEC/Dockets | Department Of Toxic Substance Control/Salloum |
28188 | 3/5/2003 |
Issuance of Prevention of Significant Deterioration Permit for Palomar Energy - POS
4 page(s)
| | San Diego Co. Air Pollution Control Dist/Lake/cec/ | Us Environmental Protection Agency/Rios |
28142 | 2/25/2003 |
Qualitative Cumulative Air Analysis
3 page(s)
| | CEC/Eller/dockets | Rodriguez |
28128 | 2/21/2003 |
Comments on the FSA
2 page(s)
| | CEC/Eller/dockets | Dept Of Toxic Substance |
28127 | 2/21/2003 |
E-mail response to Mark Rodriguez
2 page(s)
| | Rodriguezs/Cec/mendonca/dockets | CEC/Eller |
28043 | 2/11/2003 |
E-mail opposing Sempra Power Plant
1 page(s)
| | CEC/Dockets | Clyde |
28041 | 2/13/2003 |
Applicant's Proposed Revisions to Selected Conditions of Certification - POS
18 page(s)
| | CEC/Dockets | Palomar/Miller |
27992 | 2/6/2003 |
Notice of Site Visit and Pre-Hearing Conference - POS
10 page(s)
| | CEC/Dockets | CEC/Geeseman/keese |
27990 | 2/6/2003 |
Comments on the Project Concerning Transmission System Engineering - POS
4 page(s)
| | CEC/Dockets | Rodriguez |
27986 | 2/5/2003 |
Palomar's Proposed Amendment to Staff's Proposed Condition VIS-9 - POS
9 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
27983 | 2/7/2003 |
Project Mailing List - Air Quality and Visual Resources Workshop
2 page(s)
| | CEC/Dockets | CEC Cec |
27979 | 2/7/2003 |
Errata to Palomar Energy Project - Comments for 2/7/03 Workshop on Air Quality and Visual Resources Issues Raised in FSA - POS
7 page(s)
| | CEC/Dockets | Border Power Plant Working Group |
27960 | 2/5/2003 |
Comments for February 7 2003 Workshop on Air Quality and Visual Resources Issues Raised in FSA - POS
7 page(s)
| | CEC/Mendonca/dockets | Powers |
27932 | 1/28/2003 |
Document Handling for the Final Staff Assessment
3 page(s)
| | Librarian | CEC/Kennedy |
27931 | 1/28/2003 |
Request for Agency Comment on the Final Staff Assessment
2 page(s)
| | Agency Distribution | CEC/Kennedy |
27930 | 1/28/2003 |
Notice of Availability-Final Staff Assessment
3 page(s)
| | CEC/Dockets | CEC/Kennedy |
27917 | 1/30/2003 |
E-mail - Article: State Energy Panel Staff Likes Sempra Project
3 page(s)
| | CEC/Dockets | North County Times |
27890 | 1/27/2003 |
Workshop Notice - Air Quality and Visual Workshop - POS
5 page(s)
| | CEC/Dockets | CEC/Geesman |
27877 | 1/24/2003 |
Final Staff Assessment - POS
595 page(s)
| | CEC/Dockets | CEC Cec |
27856 | 1/24/2003 |
Testimony of Irina Green Re: Transmission System Reliability POS
26 page(s)
| | CEC/Dockets | California Iso |
27824 | 1/8/2003 |
Letter Concerning Native American Monitors for Cultural Resources - POS
4 page(s)
| | CEC/Dockets | Palomar/Miller |
27794 | 1/8/2003 |
Support Letter for the Use of Recycled Water - POS
4 page(s)
| | CEC/Geesman/dockets | San Diego County Water Authority/Weinberg |
27793 | 1/8/2003 |
Letter Concerning Native American Monitors for Cultural Resources - POS
4 page(s)
| | CEC/Dockets | Palomar/Miller |
27790 | 1/7/2003 |
Mitigation Monitoring and Reporting Program POS
18 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
27704 | 12/23/2002 |
Response to Bill Power's December 2, 2002 Comments on Palomar Energy's November 12, 2002 Submittal Concerning Power Plant Cooling System - POS
20 page(s)
| | CEC/Dockets | Palomar Enerfy/Miller |
27688 | 12/19/2002 |
Changes to Specific Plan for Bio
2 page(s)
| | CEC/Eller/dockets | Brindle |
27668 | 12/17/2002 |
Final Determination of Compliance - POS
108 page(s)
| | CEC/Eller/dockets | Air Pollution Control Dist/Lake |
27588 | 12/9/2002 |
ERTC's Specific Plan POS
126 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
27587 | 12/9/2002 |
Palomar's Final Determination of Compliance POS
109 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
27572 | 12/6/2002 |
ERTC Final Environmental Impact Report POS
576 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
27537 | 12/2/2002 |
Resolutions of the City Council of the City of Escondido Approving the ERTC Specific Plan POS
72 page(s)
| | CEC/Dockets | Palomar/Miller |
27535 | 11/27/2002 |
Applicant's Status Report # 8 - POS
7 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
27532 | 12/2/2002 |
Response to Sempra Energy 11-12-2- Submittal Titled, "Information Concerning Advantages and Disadvantages of Wet and Dry Cooling Systems" - POS
102 page(s)
| | CEC/Mendonca/dockets | Border Power Plant Working Group |
27529 | 12/2/2002 |
Escondido OKs Power Plant
3 page(s)
| | CEC/Dockets | North County Times/Massey |
27524 | 11/26/2002 |
Status Report #8 POS
6 page(s)
| | CEC/Geesman/keese/dockets | CEC/Eller |
27499 | 11/22/2002 |
News article titled, Sempra offers Escondido power deal
3 page(s)
| | CEC/Dockets | Sempra |
27492 | 11/21/2002 |
News article titled Planners approve Sempra
3 page(s)
| | CEC/Dockets | Sempra |
27459 | 11/18/2002 |
News article from North County Times, "City to review Sempra project Tuesday"
3 page(s)
| | CEC/Dockets | Sempra |
27397 | 11/13/2002 |
Information Concerning Cooling Systems - POS
19 page(s)
| | CEC/Dockets | Palomar/Miller |
27396 | 11/13/2002 |
Final Environmental Impact Report
583 page(s)
| | Dockets | City Of Escondido |
27373 | 11/12/2002 |
Comments regarding Palomar Energy Project
2 page(s)
| | City Of Escondido/Cec/dockets | Rodriguez |
27365 | 11/13/2002 |
Information Concerning Cooling Systems - POS
19 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
27357 | 11/8/2002 |
Transmission Issues - POS
17 page(s)
| | CEC/Eller/dockets | Palomar Energy/Miller |
27333 | 11/6/2002 |
Emissions Reductions Calculations POS
6 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
27228 | 10/31/2002 |
Notice of Public Hearing
2 page(s)
| | CEC/Dockets | City Of Escondido/ |
27220 | 10/31/2002 |
Letter requesting reconsideration of the cooling method for Palomar
1 page(s)
| | CEC/Mendonca | Sierra Club/Perkins |
27208 | 10/30/2002 |
Second Scheduling Change for Palomar
1 page(s)
| | CEC/Eller/dockets | Air Pollution Control Dist/Speer |
27167 | 10/28/2002 |
Applicant's Status Report No. 7 POS
7 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
27166 | 10/28/2002 |
Letter of Opposition
1 page(s)
| | CEC/Pao/dockets | Horn |
27132 | 10/23/2002 |
Alternative Cooling for Palomar Energy Project
49 page(s)
| | CEC/Dockets | Powers |
27127 | 10/23/2002 |
Newspaper article, titled "Workshop Examines Power-Plant Impact"
3 page(s)
| | CEC/Dockets | Sempra |
27096 | 10/21/2002 |
Candidates mixed on power plant oversight
3 page(s)
| | CEC/Dockets | North County Times |
27072 | 10/17/2002 |
Response to Bill Powers Data Request Set 3 POS
5 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
27018 | 10/11/2002 |
Workshop Notice Air Quality and Cooling POS
5 page(s)
| | CEC/Dockets | CEC/Geesman |
27010 | 10/15/2002 |
PM10 CEQA Mitigation Plan POS
43 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
26994 | 10/10/2002 |
Data Responses to Bill Power POS
39 page(s)
| | CEC/Dockcets | Palomar Energy/Miller |
26961 | 10/3/2002 |
Commission Staff's Response to Petition for Committee Workshop on Alternative Cooling Options - POS
5 page(s)
| | CEC/Dockets | CEC/Kramer |
26937 | 10/7/2002 |
Order Denying Petition for Committee Workshop - POS
6 page(s)
| | CEC/Dockets | CEC/Geesman |
26927 | 10/8/2002 |
Current Proof of Service List for Palomar
4 page(s)
| | All Parties/Cec/dockets | CEC/Mcclintock |
26871 | 10/2/2002 |
Response to Petition from Bill Powers for Committee Workshop on the Subject of Alternative Cooling Options POS
10 page(s)
| | CEC/Geesman/dockets | Palomar Energy/Miller |
26849 | 9/30/2002 |
Comments on the Preliminary Staff Assessment for Palomar
2 page(s)
| | CEC/Eller/dockets | Department Of Toxic Control/Salloum |
26844 | 10/1/2002 |
Comments on the Preliminary Staff Assessment
2 page(s)
| | CEC/Eller/dockets | Sempra Energy/Rose |
26810 | 9/27/2002 |
Comments on the CEC Preliminary Staff Assessment POS
30 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
26786 | 9/25/2002 |
Applicant's Status Report # 6 - POS
7 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
26783 | 9/26/2002 |
Escondido Research and Technology Center Specific Plan Draft Environmental Impact Report
15 page(s)
| | City Of Escondido/Delgadillo | Us Fish & Wildlife Ser./Ca Dept. Of Fish & Game |
26782 | 9/26/2002 |
Petition for Committee Workshop on the Subject of Alternative Cooling Options - POS
8 page(s)
| | CEC/Dockets | Powers |
26774 | 9/25/2002 |
Comments on the Preliminary Staff Report Assessment
2 page(s)
| | CEC/Eller/dockets | California Regional Water Quality Control District |
26773 | 9/25/2002 |
Status Report No. 6 POS
5 page(s)
| | CEC/Geesman/keese/dockets | CEC/Eller |
26772 | 9/25/2002 |
Comment on PDOC
8 page(s)
| | San Diego County Air Pollution Control Dist/Lake/c | Us Epa/Rios |
26766 | 9/24/2002 |
Escondido Research and Technology Center
1 page(s)
| | CEC/Dockets | Di Luca |
26758 | 9/23/2002 |
Newspaper article titled "State questions, air biology of Sempra plant"
3 page(s)
| | CEC/Dockets | |
26757 | 9/23/2002 |
Air Quality Mitigation
1 page(s)
| | Rodrguez/Cec/dockets | Birdsall |
26756 | 9/23/2002 |
Scheduling Change
1 page(s)
| | CEC/Eller/dockets | San Diego Air Pollution Control District/Lake |
26755 | 9/23/2002 |
Extension of Permit Processing Period for Determination Of Compliance
1 page(s)
| | San Diego Air Pollution Control District/Speer/cec | Palomar Energy/Kelly |
26738 | 9/20/2002 |
Project Mailing List Sign-in-Sheet
3 page(s)
| | CEC/Dockets | CEC Cec |
26736 | 9/20/2002 |
Objections to Data Request Filed by Bill Powers (Set 1, 2, and 3) - POS
6 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
26715 | 9/19/2002 |
ERTC as two separate projects
2 page(s)
| | CEC/Eller/dockets | Rodriguez |
26712 | 9/19/2002 |
Newspaper article from North County Times " Landowners question Sempra's delays"
5 page(s)
| | CEC/Dockets | |
26667 | 9/17/2002 |
Data Request Set 3 - POS
12 page(s)
| | CEC/Dockets | Powers Engineering/Powers |
26666 | 9/17/2002 |
Data Request Set #2 - POS
3 page(s)
| | CEC/Dockets | Powers Engineering/Powers |
26645 | 9/9/2002 |
E-mail re: The EIR Has Failed to Include in its Cumulative Project Impact a Major Transportation/Circulation and Air Quality Project
1 page(s)
| | CEC/Mendonca/dockets | M. Rodriguez |
26644 | 9/9/2002 |
Workshop Notice - PSA Workshop for Palomar - POS
5 page(s)
| | CEC/Dockets | CEC/Geesman |
26629 | 9/13/2002 |
Draft EIR Review for the Escondido Research and Technology Center-SCH - POS
14 page(s)
| | City Of Escondido/Brindle/cec/dockets | CEC/Eller |
26617 | 9/9/2002 |
Data Request of Bill Powers, Set One - POS
4 page(s)
| | CEC/Dockets | Powers Engineering/Powers |
26603 | 9/5/2002 |
Comment on San Diego County APCD July 3, 2002 Preliminary Determination Compliance
2 page(s)
| | San Diego Co. Air Pollution Control District/Lake/ | Us Epa/Rios |
26601 | 9/4/2002 |
North County Time newspaper article entitled "Sempra energized by state questions on power plant"
2 page(s)
| | CEC/Dockets | |
26600 | 9/4/2002 |
Comment on Transmission System Issues Workshop
3 page(s)
| | CEC/Dockets | Rodriguez |
26596 | 9/4/2002 |
Second Update to Project ERC Information POS
5 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
26589 | 9/3/2002 |
Letter from San Diego Union Tribune
1 page(s)
| | CEC/Dockets | Rodriguez |
26551 | 8/29/2002 |
Revised Scheduling Order -POS
5 page(s)
| | CEC/Dockets | CEC/Geesman/keese |
26550 | 8/28/2002 |
Document Handling for Preliminary Staff Assessment
2 page(s)
| | Librarian/Dockets | CEC/Kennedy |
26549 | 8/28/2002 |
Notice of Availability Preliminary Staff Assessment
2 page(s)
| | CEC/Dockets | CEC/Kennedy |
26548 | 8/28/2002 |
Request for Agency Comments on the Preliminary Staff Assessment
2 page(s)
| | Agency Distribution List/Dockets | CEC/Kennedy |
26524 | 8/26/2002 |
Applicant's Status Report # 5 -POS
6 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
26521 | 8/23/2002 |
Status Report # 5 - POS
6 page(s)
| | CEC/Geesman/keese/dockets | CEC/Eller |
26473 | 8/19/2002 |
Order Denying Request to Delay Preliminary Staff Assessment - POS
5 page(s)
| | CEC/Dockets | CEC/Geesman |
26446 | 8/12/2002 |
Description of Alternative Uses for Reclaimed Water Currently Proposed as Cooling Water - POS
521 page(s)
| | CEC/Keese/dockets | Powers Engineering/Powers |
26444 | 8/13/2002 |
Comments on July 17, 2002 Sempra Energy Evaluation of Dry Cooling as an Alternative to Evaporative Cooling - POS
27 page(s)
| | CEC/Keese/dockets | Powers Engineering/Borrmann |
26443 | 8/13/2002 |
Request that the CEC Prepare Alternative Cooling Systems Evaluation - POS
22 page(s)
| | CEC/Keese/dockets | Powers Engineering/Powers |
26441 | 8/13/2002 |
Palomar Energy Application for Confidential Designation: Fogging Frequency Curve - POS
5 page(s)
| | Palomar Energy/Miller/dockets | CEC/Larson |
26428 | 8/12/2002 |
Letter of opposition
1 page(s)
| | CEC/Dockets | Rodriguez |
26423 | 8/12/2002 |
Review of Preliminary Determination of Compliance
13 page(s)
| | San Diego Air Pollution Control District/Speer/cec | Palomar Energy/Kelly |
26399 | 8/7/2002 |
CAl ISO Review
2 page(s)
| | Cal Iso/Miller/cec/dockets | Sdg&e/Patel |
26326 | 8/2/2002 |
Comments on Preliminary Determination of Compliance (PDOC) - POS
4 page(s)
| | San Diego Aqmd/Lake/dockets | CEC/O'brien |
26324 | 8/5/2002 |
Copy of Memorandum of Understanding POS
8 page(s)
| | CEC/Kramer | City Of Escondido/James |
26304 | 7/25/2002 |
Applicant's Status Report #4 POS
6 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
26286 | 7/24/2002 |
Application for Confidential Designation re: Fogging Frequency Curve POS
5 page(s)
| | CEC/Larson/dockets | Palomar Energy/Miller |
26285 | 7/24/2002 |
CD-Roms concerning the detailed analysis of the cooling towerplume abatement referred to in Supplemental Data Response #110
1 page(s)
| | CEC/Eller/dockets | Palomar Energy/Miller |
26284 | 7/24/2002 |
Status Report No. 4 POS
6 page(s)
| | CEC/Keese/dockets | CEC/Eller |
26247 | 7/23/2002 |
Supplemental Response to Data Request No. 110 POS
5 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
26210 | 7/17/2002 |
Air Emission Offset Information Update POS
5 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
26172 | 7/15/2002 |
e-mail of opposition
1 page(s)
| | CEC/Bos/dockets | Rodriguez |
26103 | 7/9/2002 |
Preliminary Determination of Compliance for Palomar - POS
91 page(s)
| | CEC/Eller/dockets | Air Pollution Control Dist/Lake |
26042 | 6/28/2002 |
Preliminary Assessment Shallow Subsurface 6-Acre Portion - POS
43 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
26009 | 6/26/2002 |
Figures 145(a) and 145(b) to respond to Data Request No. 145 of May 23, 2002 POS
4 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
26004 | 6/24/2002 |
Responses to CEC Staff Data Request Nos. 136.a.a, 136.b., and 137 through 146 of May 23, 2002 POS
18 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
25982 | 6/21/2002 |
Applicant's Status Report #3 POS
6 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
25967 | 6/20/2002 |
Status Report No. 3 POS
6 page(s)
| | CEC/Laurie/keese/dockets | CEC/Eller |
25966 | 6/19/2002 |
Fourth Repeated Application for Confidential Designation re: Cultural Resources
67 page(s)
| | CEC/Larson/dockets | Palomar Energy/Miller |
25962 | 6/19/2002 |
Supplemental Response to CEC Staff Data Request # 25 of 3/8/02 and; Supplemental Response to CEC Staff Data Requests #'s 120. 121 and 122 of 5/3/02 - POS
21 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
25923 | 6/14/2002 |
Cal ISO Review of Detailed Facilities Study Report
11 page(s)
| | Sempra Energy Resources/Padilla/cec/dockets | California Iso |
25846 | 6/11/2002 |
Concerns
1 page(s)
| | Rodriguez/Dockets | CEC/Eller |
25809 | 6/4/2002 |
Third Repeated Application for Confidential Designation re Cultural Resources
2 page(s)
| | CEC/Larson/dockets | Palomar Energy |
25777 | 6/3/2002 |
Responses to CEC Staff Data Requests of May 3, 2002 POS
39 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
25776 | 6/3/2002 |
Letter of opposition
1 page(s)
| | CEC/Mendonca/eller/dockets | Rodriguez |
25775 | 5/31/2002 |
Powers Engineering letter to San Diego APCD Responding to April 16, 2002 Palomar Energy letter to the APCD
4 page(s)
| | CEC/Dockets | Powers Engineering/Powers |
25774 | 5/31/2002 |
Workshop Notice Transmission System Issues POS
6 page(s)
| | CEC/Dockets | CEC/Laurie |
25709 | 5/22/2002 |
Applicant's Status Report #2 POS
6 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
25707 | 5/24/2002 |
Data Requests POS
7 page(s)
| | Palomar Energy/Miller/dockets | CEC/Eller |
25706 | 5/21/2002 |
Letter dated May 20, 2002 re Reliability of the SDG&E Gas System POS
10 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
25705 | 5/21/2002 |
Comments on the Health Risk Assessment POS
7 page(s)
| | Air Resource Board/Tollstrup/cec/dockets | Air Resource Board/Donohue |
25704 | 5/22/2002 |
Status Report No. 4 POS
6 page(s)
| | CEC/Laurie/keese/dockets | CEC/Eller |
25657 | 5/15/2002 |
Technical Work Plan, Limited Subsurface Assessment - POS
7 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
25566 | 5/8/2002 |
Applicant's Supplemental Responses to CEC Staff Data Requests POS
375 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
25542 | 5/8/2002 |
CD - Visual Simulation - Response to Data Requests 81-83, 102 and 107
1 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
25512 | 5/3/2002 |
Data Requests - POS
11 page(s)
| | Palomar Energy/Miller/cec/dockets | CEC/Eller |
25465 | 5/1/2002 |
Summary of Palomar Energy Project Data Response and Issues Workshop - POS
9 page(s)
| | Palomar Energy Project/Cec/dockets | CEC/Eller |
25427 | 4/29/2002 |
U.S. Geological Survey report concerning Geohyrdology of the Escondido Hydrologic Subarea, San Diego, CA POS
24 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
25420 | 4/26/2002 |
Concerns regarding the adequacy of the analysis of potential impact on SDG&E natural gas supply system
4 page(s)
| | CEC/Eller/dockets | County Of San Diego Air Pollution Control District |
25386 | 4/22/2002 |
Status Report # 1 - POS
7 page(s)
| | CEC/Laurie/keese/dockets | CEC/Eller |
25385 | 4/22/2002 |
Palomar Energy Facility Processing Timelines - POS
5 page(s)
| | CEC/Eller/dockets | City Of Escondido/Grimm/brindle |
25381 | 4/22/2002 |
Applicant's Status Report # 1 - POS
10 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
25339 | 4/19/2002 |
Application for Status Request for Additional Information, April 5, 2002 POS
14 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
25334 | 4/17/2002 |
Appendix I
452 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
25330 | 4/18/2002 |
Application Status
1 page(s)
| | Palomar Energy/Kelley/cec/dockets | County Of San Diego Air Pollution Control District |
25319 | 4/17/2002 |
Sign In Sheet Data Response and Issues Resolution Workshop 4/17/2002
1 page(s)
| | CEC/Dockets | Palomar Energy |
25316 | 4/17/2002 |
Detailed Facilities Study Final Report and Appendix I
123 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
25311 | 4/16/2002 |
Order Granting Petition to Intervene and Financial Hardship Petition-Bill Powers POS
5 page(s)
| | CEC/Dockets | CEC/Laurie |
25271 | 4/11/2002 |
Second Repeated Application for Confidential Designation Re: Air Emission Offset
2 page(s)
| | CEC/Larson/dockets | Palomar Energy/Miller |
25216 | 4/8/2002 |
Responses to CEC Staff's Data Request 1-117 - CD's with Construction Modeling Analyses (Data Request #8) - CD with CSVP Modeling Files and Related Meteorological Data (Data Request # 111 - POS
360 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
25213 | 4/9/2002 |
Historical Architectural Survey POS
48 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
25211 | 4/8/2002 |
Petitions for Intervention and Financial Hardship POS
3 page(s)
| | CEC/Dockets | Powers Engineering/Powers |
25199 | 4/5/2002 |
Workshop Notice - Data Response & Issues Workshop - 4/17/02 - CEC - POS
5 page(s)
| | CEC/Dockets | CEC/Laurie |
25082 | 3/29/2002 |
Committee Scheduling Order - POS
6 page(s)
| | CEC/Dockets | CEC/Laurie/keese |
25060 | 3/26/2002 |
Notice of Preparation - Escondido Research and Technology Center Specific Plan
3 page(s)
| | City Of Escondido Planning Div./Delgadillo/cec/doc | City Of San Marcos/Backoff |
25058 | 3/26/2002 |
State commission conducts hearing on Sempra plant
2 page(s)
| | CEC/Dockets | North County Time |
25040 | 3/25/2002 |
Order Granting Petition to Intervene: Cabrillo Power LLC - POS
5 page(s)
| | CEC/Dockets | CEC/Laurie |
25039 | 3/25/2002 |
Project Mailing List - Public Informational Hearing and Site Visit
5 page(s)
| | CEC/Dockets | CEC Cec |
25038 | 3/25/2002 |
Public Comment Forms
4 page(s)
| | CEC/Dockets | M. Rodriguez |
25032 | 2/1/2002 |
Application Completeness Determination
1 page(s)
| | Palomar Energy/Kelly/dockets | Air Pollution Control Dist/Haury |
24996 | 3/20/2002 |
Response to Committee Request for Information Regarding Whether Data Responses Could Resolve Issues of Concern Raised in Staff's Issue Identification Report - POS
9 page(s)
| | CEC/Dockets | Palomar/Miller |
24979 | 3/20/2002 |
Petition for Intervention files by Cabrillo Power LLC - POS
4 page(s)
| | CEC/Gefter/dockets | Palomar Energy/Miller |
24966 | 3/14/2002 |
Petition of Cabrillo Power I LLC for Intervention - POS
9 page(s)
| | CEC/Dockets | Nrg Energy/Webb |
24964 | 3/18/2002 |
Notification of Need for Additional Time to Prepare Responses and Objections to Data Requests (#14, 15, 23, 49, 50, 51, 53, 54, 55, 56, 57, 81-86, 101, 108, 115, and 116) - POS
13 page(s)
| | CEC/Dockets | Palomar Energy Llc/Miller |
24935 | 3/15/2002 |
Petition for Cabrillo Power LLC for Intervention
9 page(s)
| | CEC/Dockets | Cabrillo Power Llc/Lloyd |
24934 | 3/15/2002 |
Issue Identification Report - POS
11 page(s)
| | CEC/Laurie/keese/dockets | CEC/Eller |
24933 | 3/15/2002 |
Palomar's Statement Regarding the Proposed Schedule for Reviewing the Project - POS
5 page(s)
| | CEC/Laurie/keese/dockets | Palomar Energy/Miller |
24893 | 3/8/2002 |
Data Requests - POS
46 page(s)
| | Palomar Energy Llc/Miller/cec/dockets | CEC/Eller |
24715 | 2/26/2002 |
Request for Agency Participation in the Review of the AFC
2 page(s)
| | Agency Distribution List/Dockets | CEC/Kennedy |
24714 | 2/26/2002 |
Supplemental Information - Attachment: Notice of Public Informational Hearing and Site Visit - 3/21/02 - Escondido, CA
6 page(s)
| | Librarian/Dockets | CEC/Kennedy |
24669 | 2/20/2002 |
Christy Dolan's Curriculum Vitae
9 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
24556 | 2/14/2002 |
Detailed Facilities Study Appendices A thru J as requested
48 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
24555 | 2/14/2002 |
Comments on the Application for Certification
8 page(s)
| | CEC/Eller/dockets | Dept. Of Toxic Substances Control/Salloum |
24518 | 2/14/2002 |
Petition to Intervene by CURE - POS
5 page(s)
| | CEC/Dockets | Adams Broadwell Joseph & Cardozo/Joseph |
24480 | 2/11/2002 |
Hearing Officer Assignment-Susan Gefter
1 page(s)
| | CEC/Commissioners | CEC/Keese |
24413 | 2/5/2002 |
Data Responses
248 page(s)
| | CEC/Larson/dockets | Palomar Energy/Rowley |
24364 | 2/4/2002 |
Data Adequacy Recommendation
65 page(s)
| | CEC/Commissioners/dockets | CEC/Larson |
24343 | 2/1/2002 |
Application Completeness Determination
1 page(s)
| | Palomar Energy/Kelly/cec/dockets | County Of San Diego Air Pollution Control District |
24308 | 1/22/2002 |
Cooling Options for Palomar Power Plant
2 page(s)
| | CEC/Eller/dockets | Powers Engineering/Powers |
24280 | 1/22/2002 |
Correction fo the Supplemental Notice of Preparation Environmental Impact Report
1 page(s)
| | CEC/Dockets | City Of Escondido |
23949 | 1/10/2002 |
Potential Air Emission Offsets, Confidentially Application
3 page(s)
| | Counsel To Palomar/Miller/dockets | CEC/Larson |
23916 | 1/9/2002 |
Application Status
2 page(s)
| | CEC/Layton/dockets | Air Pollution Control District Co.of San Diego/Hau |
23915 | 1/8/2002 |
E-mail Re: Supplemental Data Report
9 page(s)
| | CEC/Eller/dockets | Smeerdyk |
23817 | 1/7/2002 |
Cultural Resources Survey for the Escondido Research and Technology Center Specific Plan Area
81 page(s)
| | CEC/Dockets | Ensr International |
23801 | 1/3/2002 |
Data Adequacy
2 page(s)
| | CEC/Eller/dockets | CEC/Torres |
23754 | 1/3/2002 |
Supplemental Notice of Preparation
17 page(s)
| | CEC/Dockets | City Of Escondido |
23701 | 12/27/2001 |
Data Adequacy Recommendation
83 page(s)
| | CEC/Commissioners/dockets | CEC/Larson |
23633 | 12/21/2001 |
Repeated Application for Confidentiality Cultural Resource Information
4 page(s)
| | CEC/Larson/dockets | Palomar Energy/Miller |
23618 | 12/21/2001 |
Air Emission Information - POS
2 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
23560 | 12/19/2001 |
Notice of Preparation of a Draft Environmental Impact Report
48 page(s)
| | State Clearinhouse/Cec/dockets | City Of Escondido/Delgadillo |
23490 | 12/18/2001 |
Review of Energy Power Plant AFC
5 page(s)
| | Southern Ca Cleanup Operations Branch/Cota/cec/doc | Department Of Toxic Substance Control/Moskat |
23440 | 12/13/2001 |
Cultural Resources Application for Confidentially
2 page(s)
| | Counsel To Palomar Energy/Miller/cec/dockets | CEC/Larson |
23331 | 12/5/2001 |
Application for Confidential Designation for the Information Concerning Air Emission Offsets
6 page(s)
| | CEC/Larson/dockets | Palomar Energy/Miller |
23328 | 12/4/2001 |
Application for Determination of Compliance
186 page(s)
| | CEC/Dockets | Palomar Energy/Miller |
23259 | 11/29/2001 |
Notice of Receipt Application for Certification
2 page(s)
| | Dockets | CEC/Richins |
23253 | 11/29/2001 |
Document Handling for the Palomar Energy LLC
2 page(s)
| | Librarian/Dockets | CEC/Richins |
23252 | 11/29/2001 |
Request for Agency Participation in the Review of the Palomar Energy LLC
2 page(s)
| | Agency Dist. List/Dockets | CEC/Richins |
23240 | 11/29/2001 |
Palomar Energy Project Air Quality Modeling Computer Files
1 page(s)
| | CEC/Eller/dockets | Palomar Energy/Miller |
23235 | 11/28/2001 |
Application for Confidential Designation - Cultural Resources, Appendix B
6 page(s)
| | CEC/Larson/dockets | Palomary Energy/Miller |
23213 | 11/28/2001 |
Application for Certification
2082 page(s)
| | CEC/Larson/dockets | Palomar Energy/Rowley |
2031-0 | 8/11/2003 |
Evidentiary Hearing
60 page(s)
| | | |
1744-0 | 5/8/2003 |
Evidentiary Hearings
152 page(s)
| | | |
1741-0 | 5/7/2003 |
Evidentiay Hearing
307 page(s)
| | | |
1740-0 | 5/8/2003 |
Evidentiay Hearings
153 page(s)
| | | |
1734-0 | 4/10/2003 |
Evidentiary Hearing
121 page(s)
| | | |
1728-0 | 4/3/2003 |
Prehearing Conference
138 page(s)
| | | |
1631-0 | 4/10/2002 |
Site Visit and Informational Hearing
89 page(s)
| | | |