42205 | 9/6/2007 |
SFA's Petition for Post Certification License Amendment for the Cosumnes Power Plant Project
32 page(s)
| | CEC/ Intersted Parties | CEC/ B.B.Blevins |
33983 | 9/15/2003 |
Commission Adoption of Findings
2 page(s)
| | CEC/Dockets | CEC/Commissioners |
30838 | 5/8/2002 |
FINANCIAL HARDSHIP PETITION. POS
2 page(s)
| | CEC/Dockets | Ca Sportfishing Protection Alliance |
30829 | 4/18/2002 |
Alternate Traffic Route
7 page(s)
| | CEC/Jacques & Kathy Peasha/dockets | Kevin Hudson, Smud |
30828 | 4/16/2002 |
Repeated Application for Confidential Designation (ltr dated April 14, 2002). POS
4 page(s)
| | CEC/Dockets | Smud |
30803 | 2/19/2002 |
Repeated Application for Confidential Designation; Cultural Resources. POS
3 page(s)
| | CEC/S. Larson/dockets | Steve Cohn, Smud |
30786 | 10/31/2001 |
Cultural Resources Investigation of the Sacramento Regional Wastewater Treatment Master Plan Project Final Report
900 page(s)
| | Dockets | Esa/County Of Sacramento/par Environmental Service |
30758 | 10/15/2001 |
Request for Extension to the Application "Completeness" Determination- - Application for DOC/ATC for Cosumnes.
1 page(s)
| | CEC/Dockets | Brian Krebs, Smaqmd |
29890 | 9/11/2003 |
Filing of Notice of Decision - POS
5 page(s)
| | Opr/Calif. Resources Agency/cec/dockets | Chew/Cec |
29881 | 9/10/2003 |
Notice of Availability of Commission Decision
1 page(s)
| | CEC/Dockets | CEC Cec |
29880 | 9/5/2003 |
Aerial photo of Tim Morse, Kevin Morse, Kirsti Fong Property and Wackman Property
1 page(s)
| | CEC/Dockets | |
29879 | 9/10/2003 |
Cosumnes Power Plant Project Commission Decision - POS.
296 page(s)
| | CEC/Dockets | Chew/Cec |
29823 | 9/5/2003 |
Intervenor Kathryn Peasha's Comments on the PMPD. She states the PMPD should be denied because the Carson Ice-Generation Site is clearly a more feasible site - POS.
5 page(s)
| | CEC/Dockets | Kathryn A. Peasha |
29822 | 9/5/2003 |
Transcript: Evidentiary Hearing Before the Calif. Energy Resources Conservation and Development Commission RE: Committee Conference on Proposed Decision on the Cosumnes Power Plant Project
116 page(s)
| | CEC/Dockets | CEC Cec |
29821 | 9/5/2003 |
Objections to the SMUD gas pipeline extension route through agricultural property owned by Tim Morse, Kevin Morse, and Kirsti Fong.
2 page(s)
| | CEC/Dockets | Kirsti Fong/Tim Morse/kevin Morse |
29820 | 9/5/2003 |
Leaseholder's objections regarding SMUD proposing to route a pipeline through agricultural land that he/she is leasing.
1 page(s)
| | CEC/Dockets | Case Van Styne |
29819 | 9/5/2003 |
Revised and replacing previously docketed intervenor Michael Roskey's comments regarding PMPD and suggested conditions, Socumnes/SMUD 01-AFC-19 - POS.
5 page(s)
| | CEC/Dockets | Michael Roskey |
29818 | 9/5/2003 |
Concerns regarding the proposed SMUD pipeline and that they were not made aware of it.
1 page(s)
| | Public Adviser's Office/Cec/dockets | Kirsti Fong, Tim Morse, & Kevin Morse |
29817 | 9/8/2003 |
Errata to PMPD for SMUD Cosumnes Power Plant Project
6 page(s)
| | CEC/Dockets | Pernell/Rosenfeld/cec |
29816 | 9/8/2003 |
Letter from attorney for Bob & Sandra Pellandini, Jim Pelladini and Alex Delu regarding their concerns regarding the proposed SMUD Power Plant Project.
17 page(s)
| | CEC/Dockets | Livaich/Desmond, Nolan, Livaich & Cunningham |
29815 | 9/8/2003 |
Concerns regarding the natural gas pipeline SMUD intends to install near Flores' residence.
1 page(s)
| | CEC/Dockets | Myrna & Maurico Flores |
29814 | 9/8/2003 |
Concerns regarding the natural gas pipeline that SMUD intends to install adjacent to Kirkland's current residence.
1 page(s)
| | CEC/Dockets | Mike & Kristi Kirkland |
29813 | 9/8/2003 |
Letter from attorney's office retained by Mrs. Matilda A. Mancebo (farmland property owner affected by the proposed alignment of the natural gas line to supply proposed SMUD power plant). Letter is requesting that CEC delay taking final action on the PMPD until Mrs. Mancebo's concerns are thoroughly investigated and satisfied.
9 page(s)
| | CEC/Dockets | Schwab/Brigit S. Barnes & Associates, Inc. |
29811 | 8/29/2003 |
Letter provided by SMUD -- "Cosumnes Power Plant Natural Gas Pipeline Installation in Public Street vs. Private Land," at the August 28, 2003 Committee Conference on the Proposed Decision for the Cosumnes Power Plant.
5 page(s)
| | CEC/Dockets | Ch2mhill/J. Carrier |
29798 | 9/4/2003 |
Intervenor Michael Roskey's Comments regarding PMPD and suggested conditions for Cosumnes/SMUD - POS.
4 page(s)
| | CEC/Dockets | Roskey |
29797 | 8/29/2003 |
Cosumnes Power Plant Document from PMPD Committee Conference provided by SMUD at the 8/28/03 Committee Conference - POS.
7 page(s)
| | CEC/Dockets | Carrier/Ch2mhill |
29796 | 9/3/2003 |
Public Comment Form from Tim Morse for the SMUD/Cosumnes Power Project
1 page(s)
| | CEC/Dockets | Morse |
29788 | 9/3/2003 |
Staff's Comments on the PMPD - POS.
18 page(s)
| | CEC/Dockets | Holmes/Cec |
29726 | 9/2/2003 |
Natural gas pipeline route for the Cosumnes Power Plant Project - POS
9 page(s)
| | Chew/Cec/dockets | Nottoli/County Of Sacramento Board Of Supervisors |
29719 | 8/22/2003 |
Notice of Commission Hearing - - Tuesday, September 9, 2003, at the CEC, Hearing Room A, 10:00 am. (electronic POS)
3 page(s)
| | CEC/Dockets | CEC/Commissioners R. Pernell & A. Rosenfeld |
29704 | 8/26/2003 |
SMUD Comments on the PMPD for the SMUD Cosumnes Power Plant Project. (Enclosed: SMUD's suggested Errata to the PMPD.) - POS
9 page(s)
| | Pernell/Rosenfeld/cec/dockets | Cohn/Smud |
29667 | 8/25/2003 |
Notice of Commission Hearing SMUD Consumnes Power Plant Project Application for Certification Docket No. 02-AFC-19, Tuesday September 9, 2003.
5 page(s)
| | Dockets | CEC Cec |
29666 | 8/25/2003 |
Consumnes Power Plant (01-AFC-19) Transmission System Engineering, enclosed a switchyard interconnection diagram for Phase 1 of the Cosumnes Power Plant.
2 page(s)
| | Dockets/Kristy Chew | Smud/Kevin Hudson |
29654 | 8/13/2003 |
PSD Permit (93-AFC-3) Letter Re: Prevention of Significant Deterioration Permit for Consumnes PP>
5 page(s)
| | CEC/Chew | Air Quality Management District |
29608 | 8/14/2003 |
SMUD Cosumnes Power Plant Project - Notice of Committee Conference On Propoed Decision. POS
6 page(s)
| | CEC/Dockets | CEC/Commissioners R. Pernell & A. Rosenfeld |
29601 | 8/13/2003 |
PSD Permit (93-AFC-3) Preliminary decision to issue s prevention of signicant deterioration (PSD) permit for Consumnes PP.
1 page(s)
| | K.chew/Dockets | Brian F. Krebs |
29581 | 8/13/2003 |
Formal Consultation and Conference on the Proposed Cosumnes Power Plant Project (Corps # 2001007100), Sacramento County, California -POS
41 page(s)
| | CEC/Dockets/finan | Fish And Wildlife Service |
29493 | 8/6/2003 |
Intervenor Kathy Peasha's comments (01-AFC-19) Cosumnes Power Project Pile Test Program, August 6, 2002 Business Meeting Agenda Item 4. POS
3 page(s)
| | CEC/Dockets | Kathy Peasha |
29489 | 8/6/2003 |
Presiding Member's Proposed Decision- POS
297 page(s)
| | CEC/Dockets | CEC Cec |
29487 | 8/6/2003 |
Notice of Availability of Proposed Decision - pos
5 page(s)
| | CEC/Dockets | CEC/Rosenfield/pernell |
29471 | 8/1/2003 |
August 6, 2003, Business Meeting Item on the "Ex Parte Order re Geologic Testing" for SMUD's Cosumnes Power Plant Project. POS
7 page(s)
| | CEC/Keese/pernell/rosenfeld/boyd/geesman/dockets | Smud/S. Cohn |
29375 | 7/23/2003 |
Ex Parte Order Re Geologic Testing--POS
5 page(s)
| | Dockets/Cec | CEC/Pernell/rosenfeld |
29344 | 7/18/2003 |
August 6, 2003, Business Meeting Item on the Staff Petition for Declaratory Opinion on the Test Pile Program for SMUD's Cosumnes Power Plant Project.--POS
7 page(s)
| | CEC/C. Holmes/dockets | Cosumnes (smud) |
29306 | 7/18/2003 |
August 6, 2003, Business Meeting Item on the Staff Petition for Declaratory Opinion on the Test Pile Program for SMUD's Cosumnes Power Plant Project (CEC Docket No. 01-AFC-19) - POS
12 page(s)
| | CEC/Holmes/dockets | Smud/Cohn |
29186 | 7/11/2003 |
SMUD Cosumnes Power Plant Project Public Adviser's Status Report #4
3 page(s)
| | CEC/Pernell/rosenfeld/dockets | CEC/Mendonca |
29127 | 6/25/2003 |
Ref: Bob & Sandra Pellandini Letter Dated June 12 2003 - POS
4 page(s)
| | CEC/Pernell/rosenfeld/dockets | Smud/Hudson |
29124 | 7/2/2003 |
SMUD Fire/Hazmat Safety Plan in Response to Committee Order re: Fire Safety, dated May 19, 2003
20 page(s)
| | CEC/Pernell/rosenfeld | Smud/Taylor |
29113 | 6/27/2003 |
Reply Brief
11 page(s)
| | CEC/Dockets | Peasha |
29107 | 6/25/2003 |
Suitability of the Whitney Ranch Site in Sacramento County as Giant Grater Snake Compensation for SMUD - POS
5 page(s)
| | Us Army Corp/Cavanaugh/cec/dockets | Us Department Of Interior/Nagano |
29097 | 6/20/2003 |
Air Quality and Biology Brief - POS
16 page(s)
| | CEC/Docktets | Peasha |
29096 | 6/20/2003 |
Letter opposing pipeline - POS
3 page(s)
| | CEC/Pernell/roenfeld/dockets | Pellandini's |
29089 | 6/20/2003 |
SMUD's Second Reply Brief - POS
15 page(s)
| | CEC/Dockets | Smud/Cohn |
29088 | 6/20/2003 |
Staff's Reply Brief on the Second Evidentiary Hearing - POS
6 page(s)
| | CEC/Dockets | CEC/Holmes |
29012 | 6/16/2003 |
Letter opposing a gas pipeline being built - POS
3 page(s)
| | CEC/Pernell/rosenfeld/dockets | B & S Pellandini |
29001 | 6/13/2003 |
Applicant's Opening Brief for Group 2 Hearings and Reply Brief for Groups 1 Hearings - POS
45 page(s)
| | CEC/Dockets | Smud/Cohn |
28999 | 6/13/2003 |
Staff's Opening Brief on the Second Evidentiary Hearing and Reply Brief on the First Evidentiary Hearing - POS
12 page(s)
| | CEC/Dockets | CEC/Holmes |
28889 | 6/4/2003 |
Opening Brief for Group 1 Hearing - POS
5 page(s)
| | CEC/Dockets | Roskey |
28886 | 6/4/2003 |
Brief on Phase 1 Issues; Visual Resources, Visual Plume and Worker Safety and Fire Protection - POS
12 page(s)
| | CEC/Dockets | Peasha |
28849 | 5/30/2003 |
All Proposed Conditions of Certification for SMUD - POS
116 page(s)
| | CEC/Pernell/rosenfeld/shean/dockets | CEC/Chew |
28842 | 5/28/2003 |
Response to May 13 letter to C. Chew, Project Manager
2 page(s)
| | Bob & Sandra Pellandini/Cec/dockets | CEC/Mondonca |
28841 | 5/28/2003 |
Staff's Opening Brief on the First Evidentiary Hearings - POS
13 page(s)
| | CEC/Dockets | CEC/Holms |
28840 | 5/29/2003 |
SMUD's Opening Brief for Group1 Hearings - POS
63 page(s)
| | CEC/Dockets | Smud/Cohn |
28836 | 5/28/2003 |
Response to May 13 letter to C. Chew, Project Manager
2 page(s)
| | Jim & Gail Pellandini/Cec/dockets | CEC/Mendonca |
28729 | 5/21/2003 |
Committee Order re: Fire Safety - POS
4 page(s)
| | CEC/Dockets | CEC/Pernell/rosenfeld |
28702 | 5/16/2003 |
Briefing Order for SMUD - POS
4 page(s)
| | CEC/Dockets | CEC/Pernell/rosenfeld |
28699 | 5/13/2003 |
California Strategy to Reduce Petroleum Dependence
2 page(s)
| | CEC/Keese/dockets | Alliance Of Auto Manufacturers/Cooper/maccarthy |
28679 | 5/13/2003 |
Comments on the SMUD project and pipeline - POS
8 page(s)
| | CEC/Chew/dockets | Bob & Sandra Pellandini |
28677 | 5/13/2003 |
Informal Data Responses, Set 17, including Exhibits 5, 6, 7 - POS
19 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
28657 | 5/6/2003 |
Data Response, Set 3S in response to Staff's Data Requests dated 4/5/03 - POS
5 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
28653 | 5/9/2003 |
Conditions of Certification Discussed at the March 2003 Evidentiary Hearing for SMUD - POS
11 page(s)
| | CEC/Pernell/rosenfeld/shean/dockets | CEC/Chew |
28651 | 5/5/2003 |
Informal Data Responses, Set 16 in response to some of Staff's outstanding data needs as expressed in the FSA
18 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
28650 | 5/5/2003 |
Group 2 Testimony - Alternative and Biology - POS
89 page(s)
| | CEC/Shean/dockets | Ch2mhill/Carrier |
28649 | 5/8/2003 |
Evidentiary Hearing Exhibits - POS
41 page(s)
| | CEC/Dockets | Peasha |
28647 | 5/8/2003 |
Testimony for Kathryn Peasha - Biological Resources
6 page(s)
| | CEC/Dockets | Moore Biological Consultants/Moore |
28646 | 5/8/2003 |
Addendum to Intervenor Kathryn Peasha's Tentative Exhibit List
7 page(s)
| | CEC/Docket | Persha |
28645 | 5/8/2003 |
Michael Rosky's Testimony - POS
15 page(s)
| | CEC/Dockets | Roskey |
28644 | 5/8/2003 |
Tentative Exhibit List - POS
51 page(s)
| | CEC/Dockets | Roskey |
28632 | 5/5/2003 |
Data Response submitted by SMUD Set 1Q - POS
234 page(s)
| | CEC/Dockets | Ch2mhill |
28588 | 4/30/2003 |
Hearing Order - POS
5 page(s)
| | CEC/Dockets | CEC/Pernell/rosenfeld |
28575 | 4/23/2003 |
Consumnes Power Plant Project Final Staff Assessment - Part 3 - POS
118 page(s)
| | CEC/Pernell/rosenfelf/dockets | CEC Cec |
28574 | 4/23/2003 |
Request for Agency Comments - Final Staff Assessment Part 3 - Biological Resources and Alternatives
1 page(s)
| | Agency Distribution List/Dockets | CEC/Johnson |
28573 | 4/24/2003 |
Document Handling for Consumnes Power Plant Final Staff Assessment Part 3 - Biological Resources and Alternatives
2 page(s)
| | Librarian/Dockets | CEC/Johnson |
28565 | 4/28/2003 |
Pre-Hearing Conference Statement - POS
9 page(s)
| | CEC/Dockets | Roskey |
28564 | 4/28/2003 |
Staff's Pre-Hearing Conference Statement - POS
5 page(s)
| | CEC/Dockets | CEC/Holmes |
28563 | 4/28/2003 |
Second Pre-Hearing Conference Statement re: Biology/Alternatives Hearings - POS
8 page(s)
| | CEC/Dockets | Smud/Cohn |
28553 | 4/18/2003 |
Notice of 2nd Prehearing Conference - POS
7 page(s)
| | CEC/Dockets | CEC/Pernell/rosenfeld |
28543 | 4/21/2003 |
Notice of Evidentiary Hearing - May 12 & 13 - Herald, CA - POS
7 page(s)
| | CEC/Dockets | CEC/Pernell/rosenfeld |
28535 | 4/21/2003 |
Use of Final Staff Assessment as CEQA Environmental Document POS
7 page(s)
| | CEC/Dockets | CEC/Chamberlain |
28513 | 4/15/2003 |
Request for an Opinion on Use of Final Staff Assessment as the Environmental Document - POS
7 page(s)
| | CEC/Chamberlain/dockets | Cohn |
28512 | 4/14/2003 |
Letter confirming that Sacramento County Planning Staff finds Cosumnes Power Plant proposal is consistent with the Resource Conservation Overlay Land Use Category and review of the Revised Draft Biological Assessment - POS
4 page(s)
| | CEC/Chew/dockets | County Of Sacramento/Burness |
28507 | 4/10/2003 |
Final Staff Assessment for SMUD
10 page(s)
| | Member Of The Senate/Ortiz/cec/dockets | CEC/Therkelson |
28471 | 4/15/2003 |
Request for an Opinion on Use of Final Staff Assessment as the Environmental Document
10 page(s)
| | CEC/Chamberlain/cec/dockets | Smud/Cohn |
28444 | 4/4/2003 |
Data Response, Set 3R - POS
4 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
28442 | 4/4/2003 |
Data Responses Set 1P - Attachments CR-39C and CR-39H - POS
5 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
28439 | 4/10/2003 |
Biological Resources Final Staff Assessment - POS
6 page(s)
| | Smud/Talyor/dockets | CEC/Chew |
28438 | 4/10/2003 |
SMUD Status Report and Request for Expedited Biological Resources and Alternatives Hearing - POS
7 page(s)
| | CEC/Pernell/rosenfeld/dockets | Smud/Cohn |
28397 | 4/1/2003 |
Comments of the Final Staff Assessment - POS
15 page(s)
| | Ca Department Of Transportation/Pulverman/cec/dock | CEC/Chew |
28396 | 4/1/2003 |
Final Staff Assessment Part 1 & 2 - POS
10 page(s)
| | City Of Elk Grove Development Ser/Crawford/cec/doc | CEC/Chew |
28375 | 3/21/2003 |
Power Plant Water Policy
2 page(s)
| | CEC/Laurie/pernell/dockets | State Water Resources Control Board/Baggett |
28333 | 3/21/2003 |
Revised Conditions of Certification Filed by CEC Staff on 3/12/03 - POS
3 page(s)
| | CEC/Pernell/rosenfeld/dockets | Smud/Taylor |
28330 | 3/21/2003 |
Date Responses, Informal Set 15 - POS
73 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
28329 | 3/24/2003 |
Data Responses Set 14B - Air Quality Exhibit - POS
10 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
28325 | 3/18/2003 |
Initiation of Formal Consultation for the Endangered species Act for SMUD - POS
6 page(s)
| | National Marine Fisheries Ser/Mcinnis/cec/dockets | Department Of The Army/Finan |
28323 | 3/18/2003 |
Initiation of Formal Consultation for the Endangered Species Act for SMUD - POS
6 page(s)
| | Us Fish & Wildlife/Knight/cec/dockets | Department Of The Army/Finan |
28322 | 3/18/2003 |
Noise And Vibration - Testimony of Jim Buntin - POS
7 page(s)
| | CEC/Dockets | Buntin |
28318 | 3/18/2003 |
Informal Data Responses, Set 14 - Air Quality Exhibits - POS
15 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
28316 | 3/21/2003 |
National Marine Fisheries Services Letter dated March 17, 2003 - POS
6 page(s)
| | Us Army Corps Of Engineers/Finan/cec/dockets | Us Dept. Of Commerce/Mcinnis |
28259 | 3/14/2002 |
FSA Workshop Sign In Sheet
1 page(s)
| | CEC/Dockets | Smud |
28258 | 10/23/2002 |
Final Determination of Compliance for SMUD - POS
528 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
28256 | 3/14/2003 |
Data Response Set 3Q - POS
215 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
28255 | 3/14/2003 |
Tentative Exhibit List Intervenor Peasha Air Quality - POS
32 page(s)
| | CEC/Dockets | Peasha |
28251 | 3/12/2003 |
Supplemental Testimony and Revised Conditions of Certification - POS
87 page(s)
| | CEC/Pernell/rosenfeld/dockets | CEC/Chew |
28236 | 3/10/2003 |
Letter requesting the Committee assistance in taking steps to expedite the remainder of the AFC process - POS
6 page(s)
| | CEC/Pernell/rosenfeld/dockets | Smud/Board Of Directors |
28235 | 3/10/2003 |
Statement of Issues and Witness List and Request for Additional Evidentiary Heqarings on Air Quality and Water Resources - POS
54 page(s)
| | CEC/Dockets | Peasha |
28234 | 3/11/2003 |
Moore Biological Consultants Qualifications - POS
7 page(s)
| | CEC/Dockets | Moore |
28203 | 3/4/2003 |
Order on Intervenor Peasha Telephone Request for an Extension of Time to File Testimony - POS
4 page(s)
| | CEC/Dockets | CEC/Shean |
28164 | 2/28/2003 |
Final Staff Assessment POS
54 page(s)
| | CEC/Pernell/rosenfeld/shean/dockets | CEC/Richins |
28163 | 2/28/2003 |
Request for Agency Comments the FSA
2 page(s)
| | Agency Distribution | CEC/Richins |
28162 | 2/28/2003 |
Document Handling FSA
2 page(s)
| | Librarian | CEC/Richins |
28161 | 2/28/2003 |
Letter regarding verification of wetland delineation POS
5 page(s)
| | Smud/Taylor/dockets | Dept Of The Army/Finan |
28146 | 3/3/2003 |
Group 1 Testimonies POS
220 page(s)
| | CEC/Shean/dockets | Ch2mhill/Carrier |
28140 | 2/25/2003 |
Notice of Evidentiary Hearing POS
7 page(s)
| | CEC/Dockets | CEC/Pernell/rosenfeld |
28135 | 2/24/2003 |
Order Granting Petition to Intervene-Mike Rosky POS
4 page(s)
| | CEC/Dockets | CEC/Pernell/rosenfeld |
28125 | 2/21/2003 |
Staff FSA Workshop POS
5 page(s)
| | CEC/Dockets | CEC/Pernell |
28112 | 2/19/2003 |
Staff's Prehearing Conference Statement POS
5 page(s)
| | CEC/Dockets | CEC/Holmes |
28111 | 2/19/2003 |
SMUD Prehearing Conference Statement POS
38 page(s)
| | CEC/Dockets | Downey Brand Seymour And Rohwer/Luckhardt |
28108 | 2/24/2003 |
Repeated Application for Confidential Designation Cultural Resources
2 page(s)
| | CEC/Therkelsen/dockets | Smud/Cohn |
28107 | 2/20/2003 |
Prehearing Conference Statement POS
4 page(s)
| | CEC/Dockets | Peasha |
28106 | 2/28/2003 |
Data Response, Set 3P POS
6 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
28099 | 2/18/2003 |
Joint Stipulation on Water Source for Cosumnes Power Plant Phases I and II POS
4 page(s)
| | CEC/Dockets | CEC/O'brien |
28088 | 2/18/2003 |
Providing Secondary Treated Wastewater Effluent to SMUD for Plant Cooling POS
4 page(s)
| | CEC/Chew/dockets | City Of Galt Public Works Dept/Gault |
28087 | 2/18/2003 |
Comments on the Draft Rancho Seco Open Space Area Management Plan and Revised Perpetual Conservation Easement Grant POS
6 page(s)
| | Sacramento Public Utility District/Scott/cec/docke | Us Dept Of The Interior/Knight |
28037 | 2/13/2003 |
Request for Agency Comments on the Final Staff Assessment (Part 1)
1 page(s)
| | Agency Distribution/Dockets | CEC/Richins |
28036 | 2/13/2003 |
Document Handling for Final Staff Assessment
2 page(s)
| | Librarian/Dockets | CEC/Richens |
28030 | 2/11/2003 |
Notice of Availability FSA Part I
2 page(s)
| | CEC/Dockets | CEC/Richins |
28025 | 2/11/2003 |
Final Staff Assessment Part 1 - POS
625 page(s)
| | CEC/Dockets | CEC Cec |
27965 | 2/5/2003 |
Informal Data Response, Set 13 - POS
5 page(s)
| | CEC/Chew/dockets | Smud/Palisoc |
27964 | 2/5/2003 |
Preliminary Draft Storm Water Pollution Prevention Plan - POS
11 page(s)
| | CEC/Chew/dockets | California Regional Water Quality Control Board/Pa |
27963 | 2/5/2003 |
Preliminary Review of Proposed Pipeline Realignment Plans (Supplement D) - POS
6 page(s)
| | Smud/Shetler/dockets | Development Service/Crawford |
27962 | 2/5/2003 |
Proposed Pipeline Realignment, Ref: EGCDD Letter to Mr. Shetler Dated 1/2//03
6 page(s)
| | City Fo Elk Grove Community Dev/Crawford/cec/docke | Smud/Shetler |
27950 | 2/4/2003 |
Notice of Location Change for 1st Prehearing Conference - POS
8 page(s)
| | CEC/Dockets | CEC/Pernell/rosenfeld |
27868 | 1/23/2003 |
Notice of 1st Pre-Hearing Conference - POS
8 page(s)
| | CEC/Dockets | CEC/Pernell/rosenfeld |
27855 | 1/24/2003 |
Data Responses, Revised Informal Set 13 POS
54 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
27854 | 1/21/2003 |
Data Responses, Set 30 POS
107 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
27845 | 1/16/2003 |
Comments on the Submitted Informal Data Response 13 on 1/2/03 - POS
6 page(s)
| | Smud/Taylor/cec/dockets | CEC/Chew |
27822 | 1/10/2002 |
SMUD Status Report # 5 and Comments for Status Conference on 1/13/03
12 page(s)
| | CEC/Pernell/rosenfeld/dockets | Smud/Cohn |
27820 | 1/13/2003 |
CEC Biology Staff's Comments on the Revised Biological Resources Assessment dated 11/27/02 - POS
8 page(s)
| | Ch2mhill/Koford | CEC/Dorin |
27807 | 1/10/2003 |
Status Report # 5 - POS
8 page(s)
| | CEC/Pernell/rosenfeld/dockets | CEC/Chew |
27798 | 1/8/2003 |
Data Responses, Set 3N in Response to Staff's Data Requests dated 4/5/02 - POS
7 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
27786 | 1/6/2003 |
Informal Data Responses, Set 13 POS
11 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
27778 | 1/2/2003 |
Report of Conversation between J. Weber-Band and R. Jones Regarding Jones' Mention to K. Chew about a Fossil Find in Vicinity of Planned Gas Linear POS
4 page(s)
| | CEC/Dockets | Weber-band |
27760 | 1/3/2003 |
Data Responses, Set 3M POS
18 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
27662 | 12/17/2002 |
Wetland Delineation of Waters of the United States and Army Permit Application POS
5 page(s)
| | Smud/Taylor/cec/dockets | Dept Of Army/Finan |
27653 | 12/16/2002 |
Comments made regarding Cosumnes Power Plant Project POS
9 page(s)
| | Peasha/Dockets | CEC/Chew |
27614 | 12/13/2002 |
Notice of 2nd Hearing on Project Status POS
5 page(s)
| | CEC/Dockets | CEC/Pernell/rosenfeld |
27558 | 12/6/2002 |
General Plan Consistency, September 25 2002 Agenda 11:00am POS
12 page(s)
| | Board Of Supervisors/Cec/dockets | Planning And Community Dev. Dept./Hutchings |
27557 | 12/6/2002 |
General Plan Consistency POS
4 page(s)
| | Planning And Community Dev/Cec/dockets | Co. Of Sacramento/Turner |
27550 | 12/4/2002 |
Comments
2 page(s)
| | CEC/Chew/dockets | Chan |
27549 | 12/4/2002 |
Data Responses, Informal Set 12 POS
6 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
27542 | 12/2/2002 |
Repeated Application for Confidential Designation Cultural Resources POS
6 page(s)
| | CEC/Larson/dockets | Smud/Cohn |
27530 | 12/3/2002 |
Repeated Application for Confidential Designation for SMUD - Cultural Resources
6 page(s)
| | CEC/Larson/dockets | Smud/Cohn |
27523 | 11/27/2002 |
Status Report 4 POS
6 page(s)
| | CEC/Pernell/rosenfeld/dockets | CEC/Chew |
27505 | 11/25/2002 |
Repeated Application for Confidential Designation: Cultural Resources POS
4 page(s)
| | CEC/Larson/dockets | Smud/Cohn |
27498 | 11/22/2002 |
Proposal Docket
2 page(s)
| | Reng/Dockets | CEC/Chew |
27452 | 11/15/2002 |
Data Responses, Set 9, Repeated Application for Confidential Designation Cultural Resources POS
6 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
27368 | 11/12/2002 |
Consumes Power Plant Preliminary Staff Assessment - POS
6 page(s)
| | CEC/Adams/dockets | County Of Yolo/Morrison |
27360 | 11/8/2002 |
Signed Draft 1601 SAA R2-2002-246 and R2-202-386
20 page(s)
| | Dept. Of Fish & Games/Doody/cec/dockets | Smud/Hudson |
27343 | 11/8/2002 |
Notice of Receipt
4 page(s)
| | CEC/Dockets | CEC/Richins |
27340 | 11/7/2002 |
Supplement Information, Supplement D
2 page(s)
| | Librarian | CEC/Richins |
27339 | 11/7/2002 |
Agency Review of Fifth Supplement (Supplement D)
1 page(s)
| | Agency Distribution | CEC/Richins |
27336 | 11/6/2002 |
Data Responses, Set 3K POS
7 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
27335 | 11/6/2002 |
Final Determination of Compliance, Errata Sheet POS
10 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
27269 | 11/4/2002 |
Data Responses Informal Set 8 - POS
13 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
27236 | 11/1/2002 |
Supplement D to the AFC: Pipeline Realignment of "Alignment 3A" and Revised Construction Laydown Area - POS
39 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
27229 | 11/4/2002 |
Repeated Application for Confidential Designation - Cultural Resources
5 page(s)
| | CEC/Larson/dockets | Smud/Cohn |
27225 | 10/31/2002 |
Comments on the Preliminary Staff Assessment - POS
5 page(s)
| | CEC/Adams/dockets | County Of Yolo/Morrison |
27224 | 10/31/2002 |
Comments on a Coordination Meeting on SMUD - POS
5 page(s)
| | Us Army Corps Of Engineers/Cavanaugh/cec/dockets | Us Deptment Of The Interior/Knight |
27195 | 10/29/2002 |
Data Responses, Set 7 Revised Analysis of Air Quality Impacts During Project Construction
21 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
27173 | 10/28/2002 |
Informal Data Responses, Set 6, in response to Staff's Data Response and Issues Resolution Workshop in June POS
21 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
27164 | 10/28/2002 |
Data Responses, Set 3J in Response to Staff's Data Request dated April 5, 2002
46 page(s)
| | CEC/Dockets | Ch2mhill/Carrier |
27130 | 10/23/2002 |
Comment on the effect of SMUD's proposed CPP on flows in the lower American River POS
4 page(s)
| | CEC/Chew/dockets | United States Department Of The Interior/Michny |
27089 | 10/18/2002 |
Comments on the Preliminary Staff Assessment - POS
6 page(s)
| | CEC/Chew/dockets | Department Of Toxic Substance Control/Hume |
27052 | 10/17/2002 |
Comment on the Preliminary Staff Assessment POS
5 page(s)
| | CEC/Chew/dockets | County Of Yolo Planning And Public Works Departmen |
27051 | 10/17/2002 |
Comment on the Revised Biological Resources Assessment Report POS
6 page(s)
| | Ch2mhill/Koford/cec/dockets | Us Dept Of Commerce/Aceituno |
27050 | 10/17/2002 |
Letter of concerns regarding air pollution and visual pollution from future smoke stacks and cooling towers POS
3 page(s)
| | CEC/Chew/dockets | Kapahi |
27036 | 10/16/2002 |
Comments re: Visible Plume Analysis and Plume Abatement Technology - POS
5 page(s)
| | CEC/Chew/dockets | CECCCecchettini |
27034 | 10/16/2002 |
Comments re: Visual Impacts (Plume and Plant) Biological Resources and Alternative Sites - POS
8 page(s)
| | CEC/Chew/dockets | French |
27026 | 10/15/2002 |
Preliminary Staff Assessment Comments, Set 4 POS
6 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
27002 | 10/11/2002 |
Revised Repeated Application for Confidential Designation-Cultural Resources
2 page(s)
| | CEC/Larson/dockets | Smud/Cohn |
26991 | 10/10/2002 |
Preliminary Staff Assessment Comments, Set 3 (Revised) POS
13 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
26989 | 10/10/2002 |
Letter regarding review of the Biological Resources Assessment POS
4 page(s)
| | CEC/Dorin/dockets | Dept. Of Fish And Game |
26982 | 10/9/2002 |
USEPA comment letter on SMAQMD PDOC POS
6 page(s)
| | Smaqmd/Deguzman/cec/dockets | Us Epa/Rios |
26981 | 10/10/2002 |
Comments from Intevenor Peasha POS
13 page(s)
| | CEC/Chew/pernell/rosenfeld/shean | Peasha |
26941 | 10/4/2002 |
Preliminary Staff Assessment Comments, Set 3 - POS
13 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
26920 | 10/8/2002 |
Current Proof of Service List for SMUD
4 page(s)
| | All Parties/Cec/dockets | CEC/Mcclintock |
26905 | 10/4/2002 |
Repeated Application for Confidential Designation: Cultural Resources
2 page(s)
| | CEC/Larson/dockets | Smud/Cohn |
26904 | 10/4/2002 |
Data Responses, Set 10 POS
12 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
26881 | 10/3/2002 |
Comment on SMAQMD Preliminary Determination of Compliance POS
6 page(s)
| | Smaqmd/Deguzman/dockets | Us Epa/Rios |
26880 | 10/3/2002 |
Comment on the Preliminary Staff Assessment POS
4 page(s)
| | CEC/Chew/dockets | Kapahi |
26879 | 10/3/2002 |
Comment on the PSA POS
5 page(s)
| | CEC/Chew | City Of Elk Grove Community Development Department |
26822 | 9/27/2002 |
Comments on SMAQMD's Preliminary Determination of Compliance - POS
16 page(s)
| | CEC/Chew/dockets | Smud/Husband |
26777 | 9/25/2002 |
Data Responses, Set 4B POS
13 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
26764 | 9/24/2002 |
Sign-In-Sheet 5/14/2002 SMUD Project Status Hearing
2 page(s)
| | CEC/Dockets | Smud |
26753 | 9/23/2002 |
Review of the PSA POS
5 page(s)
| | CEC/Chew/dockets | California Regional Water Quality Control Board/Ba |
26751 | 9/23/2002 |
Status Report #3 POS
7 page(s)
| | CEC/Pernell/rosenfeld/dockets | CEC/Chew |
26748 | 9/23/2002 |
Report of Conversation between J. Belcher and Property Owner regarding Access to Sac-93
1 page(s)
| | CEC/Dockets | CEC/Torres |
26722 | 9/20/2002 |
Repeated Application for Confidential Designation-Cultural Resources
2 page(s)
| | CEC/Larson/dockets | Smud/Cohn |
26703 | 9/19/2002 |
Cosumnes Power Plant Workshop September 24, 2002 Topic on "Water Supply and Cooling Options"
1 page(s)
| | CEC/Mendonca/dockets | Dry Creek Ranch/Dedomenico |
26700 | 9/18/2002 |
Comments regarding the most recent supplement for SMUD - POS
10 page(s)
| | CEC/Fore/dockets | Department Of Transportation/Pulverman |
26699 | 9/18/2002 |
Initial Comments on the Revised Biological Resources Assessment - POS
6 page(s)
| | Us Army Corps./Cavanaugh/cec/dockets | Us Department Of Interior/Knight |
26697 | 9/17/2002 |
Informal Data Responses Set # 5
16 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
26696 | 9/18/2002 |
Data Response, Set 3I - POA
8 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
26657 | 9/10/2002 |
Project Mailing List - Preliminary Staff Assessment & Issues Resolution Workshop
1 page(s)
| | Dockets | CEC Cec |
26650 | 9/13/2002 |
Preliminary Staff Assessment Comments, Set #2 - POS
17 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
26646 | 9/6/2002 |
Preliminary Staff Assessment Comments, Set 1 - POS
49 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
26643 | 9/11/2002 |
Supplement to the Preliminary Staff Assessment for SMUD - POS
193 page(s)
| | CEC/Dockets | CEC Cec |
26637 | 9/12/2002 |
Document Handling for the Cosumnes Power Plant - Supplement to the PSA
2 page(s)
| | Librarian/Dockets | CEC/Richins |
26636 | 9/12/2002 |
Notice of Availability - Supplement to the Cosumnes Power Plant Preliminary Staff Assessment
1 page(s)
| | Agency Distribution List/Dockets | CEC/Richins |
26616 | 9/11/2002 |
Workshop Notice - Staff PSA Workshop - POS
5 page(s)
| | CEC/Dockets | CEC Cec |
26570 | 8/30/2002 |
Sign In Sheet PSA and Issues Resolution Workshop
1 page(s)
| | CEC/Dockets | Smud |
26569 | 8/30/2002 |
Endorsement of SMUD proposed power plant
1 page(s)
| | CEC/Pernell/dockets | Citrus Heights Chamber Of Commerce/Lucero/bruins |
26568 | 8/30/2002 |
Supports SMUD's planned use of entitled water
2 page(s)
| | CEC/Pernell/dockets | Florin Resource Conservation District/Kenney |
26563 | 8/29/2002 |
Data Response, Set 3H, Data Response #184, supplemental POS
488 page(s)
| | CEC.Chew/Dockets | Smud/Husband |
26543 | 8/27/2002 |
Repeated Application for Confidential Designation Cultural Resources
11 page(s)
| | CEC/Larson/dockets | Smud/Cohn |
26472 | 8/19/2002 |
Inter District Offsets -POS
5 page(s)
| | CEC/Dockets | Sacramento Metro Air Quality Management District |
26471 | 8/19/2002 |
Review Supplement C
2 page(s)
| | Librarian/Dockets | CEC/Richins |
26470 | 8/19/2002 |
Review Fourth Supplement (Supplement C)
1 page(s)
| | Agency Distribution List/Dockets | CEC/Richins |
26465 | 8/16/2002 |
Data Responses, Set 3G Revised Draft Biological Resources Assessment (Attachment BR-201B2)
91 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
26464 | 8/16/2002 |
Data Responses, Set 3G Streambed Alteration Agreement Amendment (attachment BR-201A2)
36 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
26455 | 8/16/2002 |
Data Responses, Set 3 G in Response to Staff's Data Requests dated 4/5/02
7 page(s)
| | CEC/Chew/dockets | Ch@mhill/Carrier |
26432 | 8/14/2002 |
Letter in Support of
1 page(s)
| | CEC/Keese/dockets | Elk Grove Community Services Division/Velasquez |
26422 | 8/12/2002 |
Staff PSA Workshop Notice -POS
7 page(s)
| | CEC/Dockets | CEC/Pernell |
26410 | 7/31/2002 |
Data Responses, Set 3F - POS
11 page(s)
| | CEC/Chew/docket | Ch2mhill/Roford |
26405 | 8/7/2002 |
Preliminary Staff Assessment
456 page(s)
| | CEC/Dockets | CEC Cec |
26403 | 8/8/2002 |
Document Handling of Preliminary Staff Assessment
2 page(s)
| | Librarian/Docket | CEC/Richins |
26402 | 8/8/2002 |
Request for Agency Comments on the Preliminary Staff Assessment
1 page(s)
| | Agency Distribution List/Docket | CEC/Richins |
26398 | 8/7/2002 |
Notice of Availability PSA
2 page(s)
| | CEC/Dockets | CEC/Richins |
26332 | 7/31/2002 |
Petition for Intervention by Barbara Dieter - POS
2 page(s)
| | CEC/Dockets | Dieter |
26325 | 8/2/2002 |
Order Granting Petition to Intervene Barbara Dieter - POS
4 page(s)
| | CEC/Dockets | CEC/Pernell/rosenfeld |
26312 | 7/26/2002 |
Data Responses from K. Peasha, Set 2 - POS
9 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
26308 | 7/24/2002 |
Draft The Rancho Seco Open Space Management Plan
55 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
26229 | 7/19/2002 |
AFC Supplement C (Zero Liquid Discharge Arrangement) POS
73 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
26228 | 7/18/2002 |
Data Responses, Set 1M POS
67 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
26206 | 7/18/2002 |
Response to Letter of June 20, 2002 regarding Cosumnes Power Plant POS
4 page(s)
| | Calif. Dept. Of Fish And Game/Gifford/cec/dockets | Ch2mhill/Koford |
26202 | 7/18/2002 |
Data Responses, Set 3 in response to Staff's Data Response and Issues Resolutions Workshops POS
8 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
26188 | 7/11/2002 |
Report of Conversation between K. Chew and K. Hudson regarding the compressor station
2 page(s)
| | CEC/Dockets | CEC/Chew |
26185 | 7/16/2002 |
Repeated Application for Confidential Designation Cultural Resources
2 page(s)
| | CEC/Larson/dockets | Smud |
26169 | 7/12/2002 |
Applicant's Status Report - POS
5 page(s)
| | CEC/Pernell/rosenfeld/dockets | Smud/Cohn |
26160 | 7/11/2002 |
Data Request of Kathy Peasha Set 2 - POS
5 page(s)
| | CEC/Dockets | K. Peasha |
26153 | 7/10/2002 |
AFC Supplement C Executive Summary - POS
6 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
26139 | 7/10/2002 |
Letter supporting SMUD Power Plant
1 page(s)
| | CEC/Dockets | City Of Folsom/Starky |
26119 | 7/9/2002 |
Preliminary Determination of Compliance to Construct Evaluation
386 page(s)
| | Dockets | Smud/Krebs |
26114 | 7/8/2002 |
Status Report # 2 for SMUD - POS
6 page(s)
| | CEC/Pernell/rosenfeld/dockets | CEC/Chew |
26082 | 7/2/2002 |
Comments on the Review of the SMUD Consumnes Power Plant - POS
8 page(s)
| | CEC/Fore/dockets | Department Of Transportation/Pulverman |
26069 | 7/1/2002 |
Data Response, Set 3E in Response to Staff's Data Request dated 4/5/02 - POS
83 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
26068 | 7/1/2002 |
Informal Data Response, Set 2 in Response to Staff's Data Response and Issues Resolution Workshops that occurred in June - POS
29 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
26040 | 6/28/2002 |
Letter of concern related to the proposed natural gas pipeline's crossing of DFG lands.
6 page(s)
| | CEC/Dorin/dockets | Department Of Fish & Game/Eng |
26005 | 6/25/2002 |
Repeated Application for Confidential Designation Cultural Resources POS
4 page(s)
| | CEC/Larson/dockets | Smud/Cohn |
25997 | 6/24/2002 |
Info regarding water quality and flows in the American and Sacramento Rivers
83 page(s)
| | CEC/Latteri/dockets | Ebmud/Wollmer |
25989 | 6/24/2002 |
Comments on the Cultural Resources Testing Plan POS
5 page(s)
| | CEC/Chew/dockets | Ione Band Of Miwok Indians/Villa |
25988 | 6/24/2002 |
Report of Conversation between D. Torres, G. Reinoehl, K. Chew (CEC) and J. Bard, K. Hudson and J. Carrier (SMUD) on June 20, 2002 regarding cultural resources POS
4 page(s)
| | CEC/Dockets | CEC/Chew |
25987 | 6/24/2002 |
Report of Conversation between Dorothy Torres, CEC and Randy Yonemura, concerned Native American, on June 12, 20 and 21, 2002 POS
6 page(s)
| | CEC/Dockets | CEC/Torres |
25986 | 6/24/2002 |
Questions and Comments regarding CPP Archeology POS
5 page(s)
| | CEC/Torres/dockets | Yonemura |
25973 | 6/20/2002 |
Sign In Sheet Data Response & Resolution Workshop
2 page(s)
| | CEC/Dockets | Smud Consumnes Power Plant |
25946 | 6/18/2002 |
Project Mailing List Data Response & Issues Resolution Workshop - Rancho Seco Power Plant - POS
5 page(s)
| | CEC/Dockets | Smud Consumers |
25931 | 6/13/2002 |
Updated Summary of Emission Reductions Credits POS
10 page(s)
| | Sac Metro Aqmd/Kennard/cec/dockets | Sierra Research/Rubenstein |
25920 | 6/12/2002 |
Public Comment re: Gas Line
2 page(s)
| | CEC/Dockets | Kalange |
25919 | 6/12/2002 |
Public Comment regarding Alternative
2 page(s)
| | CEC/Dockets | Burton |
25905 | 6/12/2002 |
Project Mailing List - Data Response & Issues Resolution Workshop - POS
5 page(s)
| | CEC/Dockets | Smud |
25899 | 6/7/2002 |
Data Responses, Set 3D in response to Staff's Data Requests dated April 5, 2002 POS
258 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
25898 | 6/7/2002 |
Data Responses, Set 3D-Wetland Delineation Report
179 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
25852 | 6/7/2002 |
Data Responses, Set 3D Streambed Alteration Agreement Application (Attachment BR-201A)
32 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
25834 | 6/6/2002 |
Committee Schedule POS
4 page(s)
| | CEC/Dockets | CEC/Pernell/rosenfeld |
25811 | 6/4/2002 |
Order Granting Petition to Intervene-Coalition for Fair Employment in Construction POS
4 page(s)
| | CEC/Dockets | CEC/Pernell/rosenfeld |
25808 | 6/7/2002 |
Data Responses Wetland Delineation Report (Data Request #206) POS
179 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
25807 | 5/20/2002 |
Data Responses, Set 3C POS
62 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
25769 | 5/30/2002 |
Letter in support of
1 page(s)
| | CEC/Pernell/dockets | Omochumme-hartnell Water District/Lowry |
25768 | 5/31/2002 |
Letter in support of proposal to build
1 page(s)
| | CEC/Pernell/dockets | Galt Irrigation District/Vanwarmerdan |
25767 | 5/31/2002 |
Amended Workshop Notice Data Response and Issues Resolution POS
5 page(s)
| | CEC/Dockets | CEC/Pernell |
25766 | 5/31/2002 |
Report of Conversation between Melinda Dorin and M. Martinez, National Marine Fisheries Service regarding a Biological Opinion for the SMUD project POS
4 page(s)
| | CEC/Dockets | CEC/Dorin |
25703 | 5/24/2002 |
Letter in Support of
1 page(s)
| | CEC/Pernell/dockets | Kb Home/Knot |
25702 | 5/23/2002 |
Staff Assessment Needs and Proposed Schedule POS
7 page(s)
| | CEC/Pernell/rosenfeld/dockets | CEC/Chew |
25701 | 5/24/2002 |
Workshop Notice Data Response and Issues Resolution Workshop POS
5 page(s)
| | CEC/Dockets | CEC/Pernell |
25700 | 5/22/2002 |
Order Granting Petition to Intervene and Financial Hardship Petition of California Sportfishing Protection Alliance POS
4 page(s)
| | CEC/Dockets | CEC/Pernell/rosenfeld |
25683 | 5/20/2002 |
Data Responses, Set 1J POS
14 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
25682 | 5/20/2002 |
Data Responses from Peasha, Set 1 POS
20 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
25659 | 5/17/2002 |
Project Mailing List - Issue Resolution Staff Workshop - POS
3 page(s)
| | CEC/Dockets | CEC Cec |
25629 | 5/15/2002 |
Project Mailing List - Project Status Hearing - Sacramento
1 page(s)
| | Cdc/Dockets | Smud Cosumnes Power Plant |
25618 | 5/13/2002 |
Letter opposing proposed SMUD Power Plant to be built at Rancho Seco - POS
4 page(s)
| | CEC/Chew/dockets | J. Rominger/S. Tall |
25616 | 5/15/2002 |
Report of Conversation with E. Koford, CH2MHill and D. Gifford, CDFG re: Locations of Surveys for the California Tiger Salamander
1 page(s)
| | CEC/Dockets | CEC/Dorin |
25593 | 5/13/2002 |
Complete Permit Application, SMUD: California Regional Water Quality Control Board to Colin Taylor - POS
7 page(s)
| | CEC/Dockets | Downey Brand Seymour & Rohwer/Luckhardt |
25579 | 5/10/2002 |
Data Responses, Set 4A - POS
165 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
25567 | 5/10/2002 |
Applicant SMUD Comments in Response to the Committee's Notice of Hearing on Project Status
22 page(s)
| | CEC/Dockets | Smud/Cohn |
25554 | 5/9/2002 |
Petition to Intervene by Coalition for Fair Employment in Construction
3 page(s)
| | CEC/Dockets | Cfec/Christen |
25551 | 5/9/2002 |
Report of Conversation with Billie Blue Elliston re: Public Meeting - POS
4 page(s)
| | CEC/Dockets | CEC/Reinoehl |
25548 | 5/9/2002 |
Concerns with pipeline construction - POS
4 page(s)
| | CEC/Richins/dockets | Community Development Dept./Angell |
25547 | 5/9/2002 |
Report of Conversation with Kevin Hudson, SMUD re: Clarification of construction laydown and parking areas - POS
4 page(s)
| | CEC/Dockets | CEC/Chew |
25544 | 5/8/2002 |
Petition for Intervention - POS
2 page(s)
| | CEC/Dockets | Ca Sportfishing/Mensch |
25525 | 5/6/2002 |
Input to a critical decision currently under consideration for the Cosumnes Power Plant Project - POS
3 page(s)
| | Smud/Nelson/cec/dockets | Procter & Gamble/Parks |
25524 | 5/6/2002 |
Data Responses Set 2D in response to Staff's Data Requests dated 1/4/02 - POS
7 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
25523 | 5/6/2002 |
Data Response Set #3B - POS
112 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
25521 | 5/6/2002 |
Davis Environmental Exhibit 1 (Data Request #203) - Wetland Delineation Maps and Data Sheets (Data Request #206)
280 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
25515 | 5/3/2002 |
Workshop Notice - Issue Resolution Workshop - POS
4 page(s)
| | CEC/Dockets | CEC/Pernell |
25500 | 5/3/2002 |
Informal Data Request/Response - POS
67 page(s)
| | CEC/Latteri | Smud/Hudson |
25499 | 5/3/2002 |
Application for Determination of Compliance and Authority to Construct - POS
7 page(s)
| | Sac Meto Air Quality Mtg. Dist/Kennard/cec/dockets | Smud/Husband |
25486 | 5/6/2002 |
Data Responses, Set 11 in response to Staff's Data Requests dated 12/10/01 - POS
17 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
25459 | 5/1/2002 |
SMUD's Cosumnes Power Plant Supplement B
63 page(s)
| | Yolo Co. Planning & Public Works Dept/Morrisoncec/ | CEC/Richins |
25433 | 4/30/2002 |
Data Request of Kathy Peasha - Set 1 - POS
4 page(s)
| | CEC/Dockets | K. Peasha |
25419 | 4/26/2002 |
Notice of Hearing on Project Status POS
5 page(s)
| | CEC/Dockets | CEC/Pernell/rosenfeld |
25390 | 4/24/2002 |
SMUD Consumnes Power Plant Status Report #1 POS
11 page(s)
| | CEC/Pernell/rosenfeld/dockets | Downey, Brand, Seymour And Rohwer/Luckhardt |
25380 | 4/23/2002 |
Notice of Receipt of the AFC - POS
5 page(s)
| | CEC/Dockets | CEC/Richins |
25373 | 4/22/2002 |
Third Supplement
1 page(s)
| | Agency Distribution List/Dockets | CEC/Richins |
25372 | 4/22/2002 |
Supplemental Information
2 page(s)
| | Librarian/Dockets | CEC/Richins |
25349 | 4/18/2002 |
Alternate traffic route POS
7 page(s)
| | CEC/Dockets | Peasha |
25346 | 4/18/2002 |
Cover letter from Downey Brand Seymour and Rohwer re: letter from SMUD to Jacques and Kathy Peasha; Alternate Traffic Route. POS
7 page(s)
| | CEC/Dockets | Downey Brand Seymour And Rohwer/Luckhardt |
25309 | 4/16/2002 |
Data Responses, Set 3A POS
61 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
25300 | 4/15/2002 |
Supplement B POS
61 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
25299 | 4/15/2002 |
Objection to CEC Staff Data Requests 229, 230, 236, 238 and 240 POS
12 page(s)
| | CEC/Chew/dockets | Downey, Brand, Seymour And Rohwer/Luckhardt |
25285 | 4/12/2002 |
Material (5 CD's) in support of the air quality modeling analyses POS
1 page(s)
| | CEC/Dockets | Sierra Research/Rubenstein |
25281 | 4/2/2002 |
SRWTP Reclaimed Water-SRCSD letter dated 3/15/2002
13 page(s)
| | CEC/Chew/dockets | Smud/Taylor |
25231 | 4/10/2002 |
Data Request, Set 4 - POS
4 page(s)
| | Smud/Taylor/cec/dockets | CEC/Chew |
25219 | 4/10/2002 |
Letter of concern re: the construction of the natural gas pipeline
4 page(s)
| | CEC/Chew/dockets | Ione Band Of Miwok Indians |
25218 | 4/10/2002 |
Status Report # 1 - POS
6 page(s)
| | CEC/Pernell/rosenfeld/dockets | CEC/Chew |
25157 | 4/5/2002 |
Data Requests, Set 3 - # 184 - 253 - POS
28 page(s)
| | Smud/Taylor/dockets | CEC/Chew |
25097 | 3/29/2002 |
Data Responses, Set 1H in Response to Staff's Data Request dated 12/10/01 - Preliminary Draft Wetland Delineations (Attachment BR-19) - POS
39 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
25089 | 4/2/2002 |
SRWTP Reclaimed Water - SRCSD letter dated 3/15/02
13 page(s)
| | CEC/Chew | Smud/Taylor |
25071 | 3/28/2002 |
Order Granting Petition to Intervene and Financial Hardship Petition - Kathryn Peasha
3 page(s)
| | CEC/Dockets | CEC/Pernell/rosenfeld |
25065 | 3/21/2002 |
Supplemental Information for SMUD
2 page(s)
| | Librarian/Dockets | CEC/Richins |
25064 | 3/21/2002 |
Second Supplement
1 page(s)
| | Agency Dist. List/Dockets | CEC/Richins |
25052 | 3/25/2002 |
Financial Hardship Petition - POS
3 page(s)
| | CEC/Dockets | K. Peasha |
25042 | 3/25/2002 |
Petition for Intervention - POS
3 page(s)
| | CEC/Dockets | K. Peasha |
25004 | 3/8/2002 |
Data Response Set 1E - POS
196 page(s)
| | CEC/Chew/dockets | Smud/Hudson |
24995 | 3/19/2002 |
Data Responses, Set 1G - POS
62 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
24994 | 3/19/2002 |
Data Responses, Set 2C - POS
17 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
24991 | 3/19/2002 |
Sacramento Regional County Sanitation District Reclaimed Water - POS
20 page(s)
| | Cosumnes Power Plant/Taylor/cec/dockets | Srcsd/Shanks |
24986 | 3/21/2002 |
VISTA Information Solutions Report referenced in the Phase I Site Assessment (Attachment WM-183) was inadvertently omitted from the Data Response Set 2C on March 19, 2002 - POS
27 page(s)
| | CEC/Chew/dockets | Ch2mhill/Scarrier |
24961 | 3/14/2002 |
Report of Conversation with Randy Yonemura, concerned Native American regarding Cultural Resources
3 page(s)
| | CEC/Dockets | CEC/Torres |
24944 | 3/15/2002 |
Supplement A to the AFC - POS
41 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
24938 | 3/15/2002 |
Order Granting Petition to Intervene - CURE - POS
3 page(s)
| | CEC/Dockets | CEC/Pernell/rosenfeld |
24916 | 2/21/2002 |
In response to Sac Bee article titled, "Power plant power struggle"
1 page(s)
| | Sacramento Bee/Cec/dockets | Smud/Shetler |
24879 | 3/13/2002 |
Supplemental Responses to Data Responses 39 and 109, #39 is being filed under a request for confidentiality
3 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
24779 | 3/5/2002 |
Application for Determination of Compliance and Authority to Construct - Results of Ozone Sensitivity Simulations in the Sacramento Area = POS
25 page(s)
| | Sac Metro Aqmd/Krebs/cec/dockets | Sierra Research/Rubenstein |
24687 | 2/27/2002 |
Swanson's Tank Survery Results (map)
3 page(s)
| | CEC/Dockets | Dfg/Gifford |
24683 | 2/27/2002 |
Will Serve Request, Reclamation Contract No. 14-06-200-5198A POS
3 page(s)
| | Smud/Olmstead/cec/dockets | Us Dept Of Interior/Aiken |
24682 | 2/27/2002 |
Review of national pollutant discharge elimination system application for discharge to surface waters POS
7 page(s)
| | Smud/Taylor/cec/dockets | California Regional Water Quality Control District |
24681 | 2/27/2002 |
Review and comment on proposed project POS
4 page(s)
| | CEC/Fore/dockets | Dept Of Transportation/Pulverman |
24680 | 2/27/2002 |
SMUD Cosumnes Power Plant - Application for Determination of Compliance and Authority to Construct Application Nos. 16005 and 16015 Interpollutant Offset Ratio
20 page(s)
| | Sac Metro Aqmd/Krebs/cec/dockets | Sierra Research/Rubenstein |
24652 | 2/15/2002 |
Data Response Set 1D, in response to Staff's Data Request dated 12/10/2001 POS
22 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
24651 | 2/15/2002 |
Data Responses, Set 2B in response to Staff's Data Request dated 1/4/2002 POS
15 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
24614 | 2/20/2002 |
Proposed gas lines in the Union Pacific Rail Road right-of-way POS
3 page(s)
| | CEC/Adams/dockets | City Of Elk Grove/Hoffman |
24598 | 2/15/2002 |
Repeated Application for Certification Designation-Cultural Resources
1 page(s)
| | CEC/Larson/dockets | Smud/Cohn |
24593 | 2/20/2002 |
Proposed gas lines in the Union Pacific Rail Road right-of-way POS
18 page(s)
| | CEC/Adams/dockets | City Of Elk Grove/Hoffman |
24592 | 2/20/2002 |
SMUD Power Plant's lack of a Phase I Environmental Site Assessment POS
6 page(s)
| | CEC/Ringer/dockets | Dept Of Toxic Substances Control/Hume |
24421 | 2/5/2002 |
Repeated Application for Confidential Designation Cultural Resources
1 page(s)
| | CEC/Larson | Smud |
24412 | 2/5/2002 |
Data Responses, Set 1C
222 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
24359 | 2/4/2002 |
Data Responses, Set 2A - POS
35 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
24331 | 2/1/2002 |
Letter from David C. Carlson/California Regional Water Quality Control Board re: Review of Application for Certification POS
5 page(s)
| | CEC/Richins | California Regional Water Quality Board/Carlson |
24306 | 1/14/2002 |
Objection to CEC Staff Data Request 183 POS
5 page(s)
| | CEC/Dockets | Downey Brand Seymour Rohwer/Luckhardt |
24276 | 1/18/2002 |
Data Responses, Set 1B POS
20 page(s)
| | CEC/Chew/dockets | Ch2mhill/Salamy |
24275 | 1/17/2002 |
Letter to CEC from the US Dept. of Interior to Jan Schori, General Manager of SMUD re: Initial Comments POS
5 page(s)
| | Smud/Schori/cec/dockets | Us Dept Of The Interior/Knight |
24253 | 1/30/2002 |
Petition to Intervene by CURE POS
7 page(s)
| | CEC/Dockets | Adams Broadwell Joseph And Cardozo/Joseph |
24197 | 1/25/2002 |
Project Mailing List - Site Visit and Data Response / Issue Resolution Workshop
5 page(s)
| | CEC/Dockets | Smud |
24186 | 1/25/2002 |
Comments and review of SMUD AFC - POS
9 page(s)
| | CEC/Chew/dockets | Department Of Toxic Substance Control/Hume |
24066 | 1/15/2002 |
SMUD Cosumnes Power Plant-Application for Determination of Compliance and Authority to Construct Application Nos. 16006-16015 Interpollutant Trading Analysis
14 page(s)
| | Sacramento Metro Air Quality Mgmt Dist./Krebs/cec/ | Sierra Research/Rubenstein |
24050 | 1/14/2002 |
Objection to CEC Staff Data Request 183 - POS
7 page(s)
| | CEC/Chew/dockets | Downey Brand Seymoor And Rohwer/Luckhardt |
23927 | 1/10/2002 |
Site Visit and Data Response Workshop for 1/23/02
5 page(s)
| | CEC/Dockets | CEC/Pernell |
23926 | 1/9/2002 |
Data Response, Set1 by SMUD
113 page(s)
| | CEC/Dockets | Ch2mhill |
23917 | 1/9/2002 |
Data Responses, Set 1A,
272 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrrier |
23798 | 1/2/2002 |
Public Adviser's Preliminary Status Report No. 1
1 page(s)
| | CEC/Pernell/rosenfeld/dockets | CEC/Mendonca |
23797 | 1/7/2002 |
Data Requests-Air Quality, Hazardous Materials and Waste Management POS
13 page(s)
| | Smud/Taylor/dockets | CEC/Chew |
23796 | 1/7/2002 |
Response to letter regarding the SMUD Consumnes Power Plant Project POS
4 page(s)
| | CEC/Richins/dockets | Dept Of The Army |
23645 | 12/26/2001 |
Response to the Staff's Issue Identification Report and Proposed Schedule - POS
2 page(s)
| | CEC/Dockets | Smud/Rosenberger |
23643 | 12/24/2001 |
Applicant's Response to the Staff's Issue Identification Report and Proposed Schedule - POS
25 page(s)
| | CEC/Dockets | CEC/Cohn |
23625 | 12/14/2001 |
SMUD Cosumnes Power Plant and Gas Pipeline General Plan Consistency, December 5, 2001 Agenda, 3:30 p.m.
65 page(s)
| | Board Of Supervisors/Cec/dockets | County Of Sacramento/Hutchings |
23622 | 12/14/2001 |
Waste Discharge Requirement
3 page(s)
| | CEC/Chew/dockets | California Regional Water Quality Control Board/Le |
23621 | 12/14/2001 |
Application for Determination of Compliance and Authority to Construct - Distance to ERC Sources - POS
5 page(s)
| | Aqmd/Krebs/cec/dockets | Sierra Research/Rubenstein |
23603 | 12/20/2001 |
Notification of Need for Additional Time to Prepare Responses and Objection to CEC Staff Data Request - POS
13 page(s)
| | CEC/Chew/dockets | Downey Brand Seymour & Rohwer/Luckhardt |
23582 | 12/20/2001 |
Project Mailing List - Informational Hearing and Site Visit
3 page(s)
| | CEC/Dockets | CEC Cec |
23506 | 12/12/2001 |
Issues Identification Report POS
12 page(s)
| | CEC/Pernell/rosenfeld/dockets | CEC/Chew |
23403 | 12/10/2001 |
Data Requests POS
26 page(s)
| | Smud/Taylor/dockets | CEC/Chew |
23365 | 12/7/2001 |
Regarding the SMUD Cosumnes Power Plant POS
6 page(s)
| | CEC/Richins/dockets | Dept Of Fish And Game/Eng |
23364 | 12/7/2001 |
Regarding the concerns on the "Request for Agency Review" POS
4 page(s)
| | CEC/Fromm/dockets | Herald Fire Protection District/Stigelmayer |
23363 | 12/7/2001 |
Letter by Steve Larson regarding Confidentiality Applications POS
6 page(s)
| | Smud/Cohn/dockets | CEC/Larson |
23294 | 12/3/2001 |
Notice of Public Informational Hearing and Site Visit POS
6 page(s)
| | CEC/Dockets | CEC/Pernell/rosenfeld |
23215 | 11/28/2001 |
Submittal of Supplemental Information Regarding the Application for a Determination of Compliance/Authority to Construct
182 page(s)
| | CEC/Dockets | Smud/Hudson |
23212 | 11/27/2001 |
Revised Application for Confidential Designation
7 page(s)
| | CEC/Larson/dockets | Smud/Cohn |
23161 | 11/20/2001 |
Supplemental Information for the SMUD Consumnes Power Plant
2 page(s)
| | Librarian/Dockets | CEC/Richins |
23154 | 11/21/2001 |
Submittal of Data Adequacy Supplement Compact Disk for Cosumnes Power Plant
1 page(s)
| | CEC/Dockets | Smud/Hudson |
23099 | 11/16/2001 |
Request for Agency Review
2 page(s)
| | Agency Distribution List | CEC/Richins |
23074 | 11/15/2001 |
SUMD Consumnes Power Plant and Gas Pipeline General Plan Consistency, 11/14/01 Agenda
52 page(s)
| | Policy Planning Commission/Cec/dockets | County Of Sacramento/Planning & Community Dev. Dep |
23073 | 11/15/2001 |
Hearing Officer Assignment - Garret Shean
1 page(s)
| | Commissioners/Dockets | CEC/Keese |
23038 | 11/13/2001 |
Data Adequacy Supplement
207 page(s)
| | CEC/Chew/dockets | Ch2mhill/Carrier |
23032 | 11/9/2001 |
Data Adequacy Recommendation
43 page(s)
| | CEC/Commissioners/dockets | CEC/Larson |
23014 | 11/9/2001 |
Clarifying Information
1 page(s)
| | CEC/Ngo/dockets | Rubenstein/Sierra Research |
23012 | 11/9/2001 |
Review of Energy Power Plant Applications of Certification
2 page(s)
| | Dept. Of Toxic Substances Control/Tjosvold/cec/doc | Dept. Of Toxic Substances Control/Moskat |
22736 | 10/12/2001 |
Data Adequacy Recommendation
70 page(s)
| | CEC/Commissioners/docket | CEC/Larson |
22702 | 10/16/2001 |
Document Handling
3 page(s)
| | Librarian | CEC/Richins |
22701 | 10/16/2001 |
Request for Agency Review
2 page(s)
| | Agency Distribution List/Dockets | CEC/Richins |
22700 | 10/16/2001 |
Notice of Receipt
2 page(s)
| | Dockets | CEC/Richins |
22585 | 9/11/2001 |
Application for Confidential Designation re: SMUD Cosumnes Power Plant Application for Determination of Compliance/Authority to Construct
4 page(s)
| | Sac Metro Air Quality Mtg. Dist./Covell/dockets | Smud/Cohn |
22389 | 9/17/2001 |
CD-ROM AFC *** THIS DOCUMENT IS REPLACED BY Volume 1: TN 244287-1 through 244287-39, and Volume 2: TN 244288-1 through 244288-58, and Supplements A, B, C, & D: TN 244289-1 through 244289-21, filed in Docket No. 01-AFC-19C *** 1 page(s)
| | CEC/Fromm/dockets | Ch2mhill/Carrier |
22388 | 9/13/2001 |
Quad Maps within a 10-mile radius of the CPP
1 page(s)
| | CEC/Fromm/dockets | Ch2mhill/Carrier |
22317 | 9/13/2001 |
Application for Confidential Designation
7 page(s)
| | CEC/Larson/dockets | Smud/Cohn |
22263 | 9/13/2001 |
Air Quality Modeling Data Files (CD)
1 page(s)
| | CEC/Fromm/dockets | Ch2mhill/Carrier |
22254 | 9/13/2001 |
Determination of Compliance and Authority to Construct for the Cosumnes Power Plant
293 page(s)
| | CEC/Dockets | Sierra Research/Matthews |
22222 | 9/13/2001 |
Submittal of the Application for Certification - Cosumnes Power Plant - 1,000 MW
1000 page(s)
| | CEC/Larson/dockets | Smud/Schori |
2028-0 | 4/3/2003 |
Prehearing Conference
138 page(s)
| | | |
2022-0 | 9/5/2003 |
Evidentiary Hearing
116 page(s)
| | | |
1748-0 | 5/23/2003 |
Evidentiary Hearing
511 page(s)
| | | |
1742-0 | 5/7/2003 |
Status Conference
54 page(s)
| | | |
1735-0 | 4/11/2003 |
Evidentiary Hearing
309 page(s)
| | | |
1733-0 | 4/8/2003 |
Evidentiary Hearing
100 page(s)
| | | |
1727-0 | 3/25/2003 |
Prehearing Conference
103 page(s)
| | | |
1705-0 | 1/23/2002 |
Status Confernce
66 page(s)
| | | |
1592-0 | 12/28/2001 |
Informational Hearing and Site Visit
101 page(s)
| | | |