Docket Log

Docket: 01-AFC-10
Project Title: Colusa County Power Plant - 500MW - Reliant Energy
Generated On: 12/26/2024 5:20:33 PM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
343095/13/2005 Extension of the Colusa County Power Plant; Extended to July 2006

2 page(s)
 Robert Mussetter, Enerland, LLC/Docket UnitCEC/S. Matthews, Acting Executive Director
341124/22/2005 Request for 2 year Extension on AFC-10 Colusa.

3 page(s)
 Docket UnitEnerland Llc/ R. Jhonson
277426/8/2001 Submittal of Application for Certification

800 page(s)
 CEC/Larson/docketsReliant Energy/Farley
2773410/9/2001 Responses to Data Requests from the Colusa County Air Pollution Control District

19 page(s)
 CEC/DocketsGrattan And Galati/Grattan
2773110/9/2001 System Impact Study

30 page(s)
 CEC/DocketsGrattan And Galati/Grattan
2773010/9/2001 Water Quality Certification Application

12 page(s)
 CEC/DocketsGrattan And Galati/Grattan
2772810/9/2001 Petition to Intervene by Emerald Farm

3 page(s)
 CEC/DocketsGabrielli Law Office/Gabrielli
2772710/16/2001 Report of Conversation between R. Shepard, RPA and M. Hale, URS Corp., regarding Archaeological Survey of Colusa Power Plant site

1 page(s)
 CEC/DocketsCEC/Chew
277268/16/2002 Document Handling Supplemental Information

2 page(s)
 Librarian/DocketsCEC/Richins
277258/20/2001 Hearing Officer Assignment G. Shean

1 page(s)
 CEC/Commissioners/docketsCEC/Keese
277247/16/2001 Application for Confidential Designation-Paleontological Technical Report, Appendix R, Map-Fig. 2

5 page(s)
 CEC/DocketsGrattan And Galati/Grattan
2743211/15/2002 SMUD's Status Report #4 POS

10 page(s)
 CEC/Pernell/rosenfeld/docketsSmud/Cohn
2688310/3/2002 Termination of Site Lease by Reliant, Site control vests in Enerland, LLC

12 page(s)
 CEC/Rosenfeld/boyd/docketsEnerland Llc/Mussetter
2600110/9/2001 Final Biological Assessement - POS

59 page(s)
 CEC/DocketsGrattan & Galati/Grattan
2600010/9/2001 Pre-Construction Notification - POS

28 page(s)
 CEC/DocketsGrattan & Galati/Grattan
2599910/9/2001 Streambed Alteration Agreement

14 page(s)
 CEC/DocketsGrattan & Galati/Grattan
2599810/9/2001 Additional Information Requested at Data Response/Issue Resolution Workshop of 9/26/01 - POS

32 page(s)
 CEC/DocketsGrattan & Galati/Grattan
259476/18/2002 Request for Williamson Act Rescission and Creation of Agricultural Conservation Easement

5 page(s)
 Alameda Co. Community Dev. Agency/Martinelli/cec/dGrattan & Galati/Galati
256545/16/2002 Order Terminating Proceedings - POS

4 page(s)
 CEC/DocketsCEC/Rosenfeld
256215/15/2002 Status Report

2 page(s)
 CEC/Rosenfeld/boyd/docketsReliant Energy/Greeson
251464/2/2002 Monthly Update on the Proposed Reliant Energy Colusa County LLC Power Project - POS

5 page(s)
 CEC/Chew/docketsReliant/Walker
248113/5/2002 Response to Applicant's Request for 90-Day Delay in Permitting Schedule - POS

5 page(s)
 CEC/Rosenfeld/boyd/docketsCEC/Chew
246372/20/2002 Order Granting Petition to Intervene-Wild Goose POS

4 page(s)
 CEC/DocketsCEC/Rosenfeld
245752/15/2002 Petition for Intervention POS

3 page(s)
 CEC/DocketsWild Goose Expandion Project/Carlson
245232/15/2002 Notification in change of Reliant's Application for Certification, submitted on July 6, 2001. POS

4 page(s)
 CEC/Chew/docketsReliant Energy/Walker
244572/8/2002 Letter to Ed Pike in Response to Confernce Call Questions, PSD Permit Applicantion - POS

6 page(s)
 CEC/DocketsGrattan & Galati/Grattan
244462/7/2002 Request for Concurrence with a Determination of Not Likely to Adversely Affect Listed Species for a Proposed Water Trasnfer - POS

4 page(s)
 Fish & Wildlife Services/White/cec/docketsU.s. Department Of The Interior/Ryan
243552/4/2002 Request for Formal Consultation under Section 7 of Federal Endangered Species Act - POS

4 page(s)
 Endangered Species Div/Cross/cec/docketsUs Environmental Protection Agency/Rios
242541/30/2002 Comments on the Staff Assessment POS

70 page(s)
 CEC/Worl/docketsCh2mhill/Salamy
241431/18/2002 Discussion of the degreaser POS

4 page(s)
 CEC/DocketsGrattan And Galati/Grattan
241201/18/2002 Data Requests, Round 3 POS

7 page(s)
 Reliant Energy/Walker/docketsCEC/Chew
241181/18/2002 Status Report No. 1 POS

6 page(s)
 CEC/Rosenfeld/moore/docketsCEC/Chew
240421/11/2002 Supplement to Responses to Data Requests of 12/21/01 - POS

243 page(s)
 CEC/DocketsGrattan & Galati/Galati
238481/8/2002 Responses to Data Requests of 12/21/01 for the Colusa Power Plant - POS

435 page(s)
 CEC/DocketsGrattan & Galati/Galati
237871/7/2002 Clarification on Colusa county's Support of Reliant Energy's Proposed Colusa Power Plant Project POS

5 page(s)
 CEC/Houck/docketsCounty Of Colusa/Hackney
237661/3/2002 Letter from PG&E with respect to the Delevan Compressor Station for the Coluse Power Project

3 page(s)
 CEC/DocketsGrattan & Galati/Galati
2369712/27/2001 Request to Initiate Formal Section 7 Consultation

1 page(s)
 Us Epa/Pike/cec/docketsReliant Energy/Walker
2362912/22/2001 Data Request, Round 2 - POS

7 page(s)
 Reliant Energy/Walker/cec/docketsCEC/Chew
2361512/21/2001 Letter Addressing Reliant Energy's Selected Transmission Mitigation Alternative, and related e-mails for the Coluse Power Project

10 page(s)
 CEC/DocketsGrattan&galati/Grattan
2361412/21/2001 Letter from the County of Colusa with Respect to Road Paving

3 page(s)
 CEC/DocketsGrattan & Galati/Grattan
2354012/14/2001 Energy Commission Staff's Request for a Revised Schedule Order - POS

10 page(s)
 CEC/DocketsCEC/Houck
2343912/13/2001 Preliminary Determination of Compliance - POS

5 page(s)
 Colusa County Apcd/Krug/docketsUs Environmental Protection Agency/Rios
2339212/7/2001 Copies of: 1. Amended Application 2. PG&E Interconnection Study 3. PM10 Offset Package and 4. Revised Reliant Interconnection Description POS

57 page(s)
 CEC/DocketsGrattan And Galati/Galati
2327811/30/2001 Order on Project Status and Schedule - POS

4 page(s)
 DocketsCEC/Rosenfeld/moore
2325111/29/2001 SO2 to PM10 Offset Ratio in Colusa County

10 page(s)
 Fife_env@compuserve.com/Cec/docketsUrs/Strehlow
2325011/29/2001 Comments on Preliminary Determination of Compliance

5 page(s)
 Apoc/Krug/cec/docketsCEC/Haussler
2324911/29/2001 No Special Protection Scheme for the 2nd 230 kV loop in Suggestion

1 page(s)
 Bgedrich@reliant.com/Cec/docketsEt&de/Ng
2322911/26/2001 Emmission Offset Credit Procurement Plan - POS

4 page(s)
 CEC/DocketsGrattan & Galati/Grattan
2322811/26/2001 Fish and Wildlife Service's Comments on the Colusa Power Plant

5 page(s)
 CEC/DocketsGrattan & Galati/Grattan
2321011/26/2001 Staff's Reply to Applicant's Answer - Staff Petition for Removal - POS

11 page(s)
 CEC/DocketsCEC/Houck
2320211/27/2001 Potential Air Emission Offsets, Confidentiality Application for Colusa - POS

6 page(s)
 Grattan & Galati/GalatiCEC/Larson
2317511/21/2001 Reliant Colusa Road Paving Preliminary Submittal - Attachment: Revised Memo and a Revised Spreadsheet

3 page(s)
 Fife_env@compuserve.com/Cec/docketsUrs Corp/Strehlow
2316511/20/2001 Comments and Issues a Biological Opinion on the Proposed Power Plant by 11/21/01

2 page(s)
 CEC/RichinsUs Department Of The Interior/Knight
2316411/20/2001 Reliant Colusa - Road Paving Preliminary Submittal

3 page(s)
 Fife_env@compuserve.com/DocketsUrs Corp/Strehlow
2316211/20/2001 Colusa County Department of Planning & Building's Response to the Petition for Removal . . . and Peititon for Hearing

3 page(s)
 CEC/Houck/docketsCounty Of Colusa/Hackney
2302211/9/2001 Sampling Protocol (Rev. 1)

2 page(s)
 Env/Fife/cec/docketsUrs Corp/Strehlow
2301011/9/2001 Submittal of Information Regarding Availability of PM 10 Emission Reduction Credits

1 page(s)
 Colusa Co. Air Pollution Control District/Krug/cecReliant Energy/Furstenwerth
2298511/8/2001 Request for Extension of Comment Period on Preliminary Determination of Compliance for Colusa Power Plant Project

1 page(s)
 Colusa County Air Pollution Control Dist./Krug/cecReliant Energy/Furstenwerth
2295411/5/2001 Notice of Hearing on Projecf Status POS

4 page(s)
 DocketsCEC/Rosenfeld, Moore
2295311/5/2001 Colusa Power Project's Answer to Staff Petition for Removal from the Six-Month Process POS

11 page(s)
 CEC/DocketsGrattan And Galati/Grattan
2291911/2/2001 Clarification of Air Quality Data Requests

1 page(s)
 Reliant Energy/Walker/docketsCEC/Chew
2291810/30/2001 Petition for Hearing Before the Presiding Member POS

5 page(s)
 CEC/DocketsGrattan And Galati/Grattan
2288510/26/2001 Add to order granting intervenor Emerald Farms' petition to intervene, co-counsel William Littlejohn

1 page(s)
 CEC/DocketsGumbrell
2283010/26/2001 Petition For Removal of the Colusa Power Project from the Six-Month Process to the Twelve-Month Process and Adoption of a Twelve-Month Schedule Amended to Include Missing Pages 5 and 6 POS

12 page(s)
 DocketsCEC/Houck
2280110/23/2001 Petition for Removal of the Colusa Power Project from the Six-month Process to the Twelve-Month Process and Adoption of a Twelve-Month Schedule POS

13 page(s)
 DocketsCEC/Houck
2280010/24/2001 Order Granting Petition to Intervene:Emerald Farms POS

6 page(s)
 DocketsCEC/Rosenfeld
2279910/25/2001 Cal-ISO Comments on the System Impact Study Report for Reliant Energy Colusa Project

16 page(s)
 Pg&e/Lavezzo/docketsCal Iso/Miller
2279510/23/2001 Repeated Application for Confidential Designation, Confidential Supplemental Responses to Air Quality Data Requests 15-19

2 page(s)
 CEC/DocketsGrattan And Galati/Galati
2278810/19/2001 E-mail Re: Additional Information Regarding Data Response 117

23 page(s)
 CEC/Chew/docketsHeick/Urs
2277710/22/2001 Revised table for the Bio Assessment: Table 7; Appendices for the System Impact Study submitted to the CEC 10/9/01; and Outgrant Application submitted to the Tehama - Colusa Canal Authority 10/10/01 - POS

758 page(s)
 CEC/DocketsGrattan & Galati/Galati
2275910/17/2001 2001 California Alamanc of Emissions and Air Quality

80 page(s)
 CEC/Allen/docketsBrent K. Takemoto
2272210/19/2001 Comments pertaining to AFC Vol I and II, supplemental and Responses to Data Requests

2 page(s)
 CEC/Chew/docketsDept. Of Fish And Game/Eng
2268310/16/2001 Background Air Quality Tables

5 page(s)
 CEC/Golden/docketsUrs/Strehlow
2268210/16/2001 Supplemental Information, PSD Permit Application

4 page(s)
 United States Epa/Pike/cec/docketsReliant Energy/Furstenwerth
2265710/12/2001 Preliminary Determination of Compliance

37 page(s)
 CEC/DocketsColusa Power Plant
2262410/10/2001 Application for Confiential Designationand the attached Confidential Appendix 1, AFC

3 page(s)
 CEC/DocketsGrattan & Galati/Galati
2262310/10/2001 Supplemental Information Requested by CCAPCD on 9/26/01 - POS

26 page(s)
 CEC/DocketsGrattan & Galati/Grattan
2257310/2/2001 Sign-In Sheet 9/26/2001 Data Response/Issues Resolution Workshop

2 page(s)
 DocketsCEC/Pao
2257210/2/2001 Report of Conservation 9/18/2001 between M. Hamblin, CEC and J. Grattan, Counsel to Reliant Energy

1 page(s)
 DocketsCEC/Hamblin
2257110/2/2001 Prevention of Significant Deterioration Application

4 page(s)
 Reliant Energy/Furstenwerth/cec/docketsUnited States Environmental Protection Agency/Rios
2257010/2/2001 Completeness of Application for Authority to Construct

2 page(s)
 Pg&e/Burke/cec/docketsDept. Of Agri-air Pollution Control District/Krug
2256910/2/2001 Comments on the Proposed Colusa Power Plant

2 page(s)
 Reliant Energy Wholesale Grp/Walker/cec/docketsUs Dept. Of The Interior/Knight
2256210/1/2001 Petition to Intervene by Emerald Farms

2 page(s)
 CEC/DocketsGabrielli Law Office/Gabrielli
2253110/1/2001 Supplemental Information on Data Requests 1 and 20, including a CD-ROM POS

16 page(s)
 CEC/DocketsGrattan And Galati/Grattan
224439/25/2001 Clarifications and Corrections in Response to Data Requests Nos. 3, 47, 87, 92, 103 and 104 POS

25 page(s)
 CEC/DocketsGrattan And Galati/Grattan
224429/25/2001 Sign-In Sheet for Sept. 24, 2001 Site Visit and Informational Hearing

5 page(s)
 DocketsCEC/Mendonca
224419/25/2001 Informational Site Visit and Hearing

2 page(s)
 CEC/Mendonca/docketsGabrielli Law Office/Gabrielli
224409/25/2001 Questions about the Colusa Power Plant AFC

3 page(s)
 CEC/DocketsSmallwood
224399/25/2001 Comments in support of the project

1 page(s)
 CEC/Rosenfeld/docketsCity Of Williams/Lewis
223349/19/2001 Additional Information Responding to Data Requests Nos. 97 and 119 POS

8 page(s)
 CEC/DocketsGrattan And Galati/Grattan
223129/14/2001 Data Response/Issue Resolution Workshop Sept. 26, 2001 POS

2 page(s)
 DocketsCEC/Rosenfeld
223119/17/2001 Issues Identification Report POS

15 page(s)
 CEC/Rosenfeld, Moore/docketsCEC/Chew
222539/13/2001 Responses to Data Request of August 22, 2001 - POS

279 page(s)
 CEC/DocketsGrattan & Galati/Grattan
222079/7/2001 Notice of Public Informational Hearing & Site Visit - POS

8 page(s)
 CEC/DocketsCEC/Rosenfeld/moore
221929/7/2001 Order Granting Petition to Intervene - Marc D. Joseph - Adams, Broadwell, Joseph and Cardozo - POS

5 page(s)
 CEC/DocketsCEC/Rosenfeld
221649/6/2001 Petition to Intervene by CURE

5 page(s)
 CEC/DocketsAdams Broadwell Joseph & Cardozo/Joseph
221198/29/2001 Data Requests

42 page(s)
 Reliant Energy/Walker/cec/docketsCEC/Chew
221168/30/2001 Report of Conversation with Bill Baker, Reliant, Steve Kellogg, Jenny Pretare, URS and Ken Fuller, USFWS regarding site visit for the USFWS so that information for the BO can be gathered

1 page(s)
 CEC/DocketsCEC/Dorin
220778/21/2001 Petition for Intervention POs

2 page(s)
 CEC/DocketsGoodin, Macbride, Squeri, Ritchie And Day/Lajaunie
219888/24/2001 Reliant Energy Colusa County LLC's Determination of Compliance Response to Questions from Colusa County APCD

62 page(s)
 CEC/DocketsGrattan & Galati/Grattan
218608/15/2001 Agency Participation in the review of the Colusa Power Plant AFC and Supplemental filing

2 page(s)
 Agency Distribution ListCEC/Richins
218338/13/2001 Supplement in Response to CEC Data Adequacy Review

92 page(s)
 CEC/DocketsGrattan And Galati/Grattan
218038/10/2001 Data Adequacy Recommendation

28 page(s)
 CEC/Commissioners/docketsCEC/Larson
217488/2/2001 Completeness of Application for Authority to Construct

1 page(s)
 Reliant Energy Colusa Co/Furstenwerth/docketsColusa Co. Dept. Of Agric-air Pollution Control Di
217097/31/2001 Data Adequacy Recommendation

93 page(s)
 CEC/Commissioners/docketsCEC/Larson
216517/26/2001 Memorandum of Ground Sublease and Legal Description

11 page(s)
 CEC/DocketsGrattan And Galati/Grattan
216267/24/2001 Paleontological Resources Technical Report Application for Confidentiality

2 page(s)
 Grattan & Galati//docketsCEC/Larson
216057/23/2001 Report of Conversation between Melinda Dorin, Steve Leach and others

2 page(s)
 CEC/DocketsCEC/Dorin
216047/23/2001 Comments represent the separate evaluations of DTSC's two main programs, Hazardous Waste Management and Site Mitigation

2 page(s)
 CEC/Chew/docketsDepartment Of Toxic Substances Control/Lowry
214377/6/2001 Application for Confidential Designation - Paleontogogical Resources Technical Report

1 page(s)
 CEC/Larson/docketsGrattan & Galati/Gratten
214027/11/2001 Notice of Receipt

4 page(s)
 DocketsCEC/Therkelsen
213907/11/2001 Document Handling for the Colusa Power Plant

2 page(s)
 Librarian/DocketsCEC/Richins
213897/11/2001 Request for Agency Participation in the Review of the Colusa Power Plant, AFC

3 page(s)
 Agency Distribution List/DocketsCEC/Richins
213527/6/2001 Air Quality Related Values Impact in Class I Areas

5 page(s)
 CEC/DocketsReliant Energy/Walker
213517/6/2001 Cumlative Impact Modeling - Air Emissions

3 page(s)
 CEC/DocketsReliant Energy/Walker
213477/6/2001 Additional Information Related to Appendix F - Initial Load Flow Study

680 page(s)
 CEC/DocketsReliant Energy/Walker
213347/6/2001 Prevention of Significant Deterioration (PSD) Permit Application

293 page(s)
 Us Environmental Protection Agency/Rios/cec/docketReliant Energy/Furstenwerth
213337/6/2001 Application for Authority to Construct

374 page(s)
 Colusa Co. Air Pollution Control Dist/Krug/docketsReliant Energy/Furstenwerth
1584-012/6/2001 Status Conference

46 page(s)
   
1564-010/4/2001 Informational Hearing and Sie Visit

90 page(s)
   
1560-010/4/2001 Informational Hearing and Site Visit

85 page(s)