34309 | 5/13/2005 |
Extension of the Colusa County Power Plant; Extended to July 2006
2 page(s)
| | Robert Mussetter, Enerland, LLC/Docket Unit | CEC/S. Matthews, Acting Executive Director |
34112 | 4/22/2005 |
Request for 2 year Extension on AFC-10 Colusa.
3 page(s)
| | Docket Unit | Enerland Llc/ R. Jhonson |
27742 | 6/8/2001 |
Submittal of Application for Certification
800 page(s)
| | CEC/Larson/dockets | Reliant Energy/Farley |
27734 | 10/9/2001 |
Responses to Data Requests from the Colusa County Air Pollution Control District
19 page(s)
| | CEC/Dockets | Grattan And Galati/Grattan |
27731 | 10/9/2001 |
System Impact Study
30 page(s)
| | CEC/Dockets | Grattan And Galati/Grattan |
27730 | 10/9/2001 |
Water Quality Certification Application
12 page(s)
| | CEC/Dockets | Grattan And Galati/Grattan |
27728 | 10/9/2001 |
Petition to Intervene by Emerald Farm
3 page(s)
| | CEC/Dockets | Gabrielli Law Office/Gabrielli |
27727 | 10/16/2001 |
Report of Conversation between R. Shepard, RPA and M. Hale, URS Corp., regarding Archaeological Survey of Colusa Power Plant site
1 page(s)
| | CEC/Dockets | CEC/Chew |
27726 | 8/16/2002 |
Document Handling Supplemental Information
2 page(s)
| | Librarian/Dockets | CEC/Richins |
27725 | 8/20/2001 |
Hearing Officer Assignment G. Shean
1 page(s)
| | CEC/Commissioners/dockets | CEC/Keese |
27724 | 7/16/2001 |
Application for Confidential Designation-Paleontological Technical Report, Appendix R, Map-Fig. 2
5 page(s)
| | CEC/Dockets | Grattan And Galati/Grattan |
27432 | 11/15/2002 |
SMUD's Status Report #4 POS
10 page(s)
| | CEC/Pernell/rosenfeld/dockets | Smud/Cohn |
26883 | 10/3/2002 |
Termination of Site Lease by Reliant, Site control vests in Enerland, LLC
12 page(s)
| | CEC/Rosenfeld/boyd/dockets | Enerland Llc/Mussetter |
26001 | 10/9/2001 |
Final Biological Assessement - POS
59 page(s)
| | CEC/Dockets | Grattan & Galati/Grattan |
26000 | 10/9/2001 |
Pre-Construction Notification - POS
28 page(s)
| | CEC/Dockets | Grattan & Galati/Grattan |
25999 | 10/9/2001 |
Streambed Alteration Agreement
14 page(s)
| | CEC/Dockets | Grattan & Galati/Grattan |
25998 | 10/9/2001 |
Additional Information Requested at Data Response/Issue Resolution Workshop of 9/26/01 - POS
32 page(s)
| | CEC/Dockets | Grattan & Galati/Grattan |
25947 | 6/18/2002 |
Request for Williamson Act Rescission and Creation of Agricultural Conservation Easement
5 page(s)
| | Alameda Co. Community Dev. Agency/Martinelli/cec/d | Grattan & Galati/Galati |
25654 | 5/16/2002 |
Order Terminating Proceedings - POS
4 page(s)
| | CEC/Dockets | CEC/Rosenfeld |
25621 | 5/15/2002 |
Status Report
2 page(s)
| | CEC/Rosenfeld/boyd/dockets | Reliant Energy/Greeson |
25146 | 4/2/2002 |
Monthly Update on the Proposed Reliant Energy Colusa County LLC Power Project - POS
5 page(s)
| | CEC/Chew/dockets | Reliant/Walker |
24811 | 3/5/2002 |
Response to Applicant's Request for 90-Day Delay in Permitting Schedule - POS
5 page(s)
| | CEC/Rosenfeld/boyd/dockets | CEC/Chew |
24637 | 2/20/2002 |
Order Granting Petition to Intervene-Wild Goose POS
4 page(s)
| | CEC/Dockets | CEC/Rosenfeld |
24575 | 2/15/2002 |
Petition for Intervention POS
3 page(s)
| | CEC/Dockets | Wild Goose Expandion Project/Carlson |
24523 | 2/15/2002 |
Notification in change of Reliant's Application for Certification, submitted on July 6, 2001. POS
4 page(s)
| | CEC/Chew/dockets | Reliant Energy/Walker |
24457 | 2/8/2002 |
Letter to Ed Pike in Response to Confernce Call Questions, PSD Permit Applicantion - POS
6 page(s)
| | CEC/Dockets | Grattan & Galati/Grattan |
24446 | 2/7/2002 |
Request for Concurrence with a Determination of Not Likely to Adversely Affect Listed Species for a Proposed Water Trasnfer - POS
4 page(s)
| | Fish & Wildlife Services/White/cec/dockets | U.s. Department Of The Interior/Ryan |
24355 | 2/4/2002 |
Request for Formal Consultation under Section 7 of Federal Endangered Species Act - POS
4 page(s)
| | Endangered Species Div/Cross/cec/dockets | Us Environmental Protection Agency/Rios |
24254 | 1/30/2002 |
Comments on the Staff Assessment POS
70 page(s)
| | CEC/Worl/dockets | Ch2mhill/Salamy |
24143 | 1/18/2002 |
Discussion of the degreaser POS
4 page(s)
| | CEC/Dockets | Grattan And Galati/Grattan |
24120 | 1/18/2002 |
Data Requests, Round 3 POS
7 page(s)
| | Reliant Energy/Walker/dockets | CEC/Chew |
24118 | 1/18/2002 |
Status Report No. 1 POS
6 page(s)
| | CEC/Rosenfeld/moore/dockets | CEC/Chew |
24042 | 1/11/2002 |
Supplement to Responses to Data Requests of 12/21/01 - POS
243 page(s)
| | CEC/Dockets | Grattan & Galati/Galati |
23848 | 1/8/2002 |
Responses to Data Requests of 12/21/01 for the Colusa Power Plant - POS
435 page(s)
| | CEC/Dockets | Grattan & Galati/Galati |
23787 | 1/7/2002 |
Clarification on Colusa county's Support of Reliant Energy's Proposed Colusa Power Plant Project POS
5 page(s)
| | CEC/Houck/dockets | County Of Colusa/Hackney |
23766 | 1/3/2002 |
Letter from PG&E with respect to the Delevan Compressor Station for the Coluse Power Project
3 page(s)
| | CEC/Dockets | Grattan & Galati/Galati |
23697 | 12/27/2001 |
Request to Initiate Formal Section 7 Consultation
1 page(s)
| | Us Epa/Pike/cec/dockets | Reliant Energy/Walker |
23629 | 12/22/2001 |
Data Request, Round 2 - POS
7 page(s)
| | Reliant Energy/Walker/cec/dockets | CEC/Chew |
23615 | 12/21/2001 |
Letter Addressing Reliant Energy's Selected Transmission Mitigation Alternative, and related e-mails for the Coluse Power Project
10 page(s)
| | CEC/Dockets | Grattan&galati/Grattan |
23614 | 12/21/2001 |
Letter from the County of Colusa with Respect to Road Paving
3 page(s)
| | CEC/Dockets | Grattan & Galati/Grattan |
23540 | 12/14/2001 |
Energy Commission Staff's Request for a Revised Schedule Order - POS
10 page(s)
| | CEC/Dockets | CEC/Houck |
23439 | 12/13/2001 |
Preliminary Determination of Compliance - POS
5 page(s)
| | Colusa County Apcd/Krug/dockets | Us Environmental Protection Agency/Rios |
23392 | 12/7/2001 |
Copies of: 1. Amended Application 2. PG&E Interconnection Study 3. PM10 Offset Package and 4. Revised Reliant Interconnection Description POS
57 page(s)
| | CEC/Dockets | Grattan And Galati/Galati |
23278 | 11/30/2001 |
Order on Project Status and Schedule - POS
4 page(s)
| | Dockets | CEC/Rosenfeld/moore |
23251 | 11/29/2001 |
SO2 to PM10 Offset Ratio in Colusa County
10 page(s)
| | Fife_env@compuserve.com/Cec/dockets | Urs/Strehlow |
23250 | 11/29/2001 |
Comments on Preliminary Determination of Compliance
5 page(s)
| | Apoc/Krug/cec/dockets | CEC/Haussler |
23249 | 11/29/2001 |
No Special Protection Scheme for the 2nd 230 kV loop in Suggestion
1 page(s)
| | Bgedrich@reliant.com/Cec/dockets | Et&de/Ng |
23229 | 11/26/2001 |
Emmission Offset Credit Procurement Plan - POS
4 page(s)
| | CEC/Dockets | Grattan & Galati/Grattan |
23228 | 11/26/2001 |
Fish and Wildlife Service's Comments on the Colusa Power Plant
5 page(s)
| | CEC/Dockets | Grattan & Galati/Grattan |
23210 | 11/26/2001 |
Staff's Reply to Applicant's Answer - Staff Petition for Removal - POS
11 page(s)
| | CEC/Dockets | CEC/Houck |
23202 | 11/27/2001 |
Potential Air Emission Offsets, Confidentiality Application for Colusa - POS
6 page(s)
| | Grattan & Galati/Galati | CEC/Larson |
23175 | 11/21/2001 |
Reliant Colusa Road Paving Preliminary Submittal - Attachment: Revised Memo and a Revised Spreadsheet
3 page(s)
| | Fife_env@compuserve.com/Cec/dockets | Urs Corp/Strehlow |
23165 | 11/20/2001 |
Comments and Issues a Biological Opinion on the Proposed Power Plant by 11/21/01
2 page(s)
| | CEC/Richins | Us Department Of The Interior/Knight |
23164 | 11/20/2001 |
Reliant Colusa - Road Paving Preliminary Submittal
3 page(s)
| | Fife_env@compuserve.com/Dockets | Urs Corp/Strehlow |
23162 | 11/20/2001 |
Colusa County Department of Planning & Building's Response to the Petition for
Removal . . . and Peititon for Hearing
3 page(s)
| | CEC/Houck/dockets | County Of Colusa/Hackney |
23022 | 11/9/2001 |
Sampling Protocol (Rev. 1)
2 page(s)
| | Env/Fife/cec/dockets | Urs Corp/Strehlow |
23010 | 11/9/2001 |
Submittal of Information Regarding Availability of PM 10 Emission Reduction Credits
1 page(s)
| | Colusa Co. Air Pollution Control District/Krug/cec | Reliant Energy/Furstenwerth |
22985 | 11/8/2001 |
Request for Extension of Comment Period on Preliminary Determination of Compliance for Colusa Power Plant Project
1 page(s)
| | Colusa County Air Pollution Control Dist./Krug/cec | Reliant Energy/Furstenwerth |
22954 | 11/5/2001 |
Notice of Hearing on Projecf Status POS
4 page(s)
| | Dockets | CEC/Rosenfeld, Moore |
22953 | 11/5/2001 |
Colusa Power Project's Answer to Staff Petition for Removal from the Six-Month Process POS
11 page(s)
| | CEC/Dockets | Grattan And Galati/Grattan |
22919 | 11/2/2001 |
Clarification of Air Quality Data Requests
1 page(s)
| | Reliant Energy/Walker/dockets | CEC/Chew |
22918 | 10/30/2001 |
Petition for Hearing Before the Presiding Member POS
5 page(s)
| | CEC/Dockets | Grattan And Galati/Grattan |
22885 | 10/26/2001 |
Add to order granting intervenor Emerald Farms' petition to intervene, co-counsel William Littlejohn
1 page(s)
| | CEC/Dockets | Gumbrell |
22830 | 10/26/2001 |
Petition For Removal of the Colusa Power Project from the Six-Month Process to the Twelve-Month Process and Adoption of a Twelve-Month Schedule Amended to Include Missing Pages 5 and 6 POS
12 page(s)
| | Dockets | CEC/Houck |
22801 | 10/23/2001 |
Petition for Removal of the Colusa Power Project from the Six-month Process to the Twelve-Month Process and Adoption of a Twelve-Month Schedule POS
13 page(s)
| | Dockets | CEC/Houck |
22800 | 10/24/2001 |
Order Granting Petition to Intervene:Emerald Farms POS
6 page(s)
| | Dockets | CEC/Rosenfeld |
22799 | 10/25/2001 |
Cal-ISO Comments on the System Impact Study Report for Reliant Energy Colusa Project
16 page(s)
| | Pg&e/Lavezzo/dockets | Cal Iso/Miller |
22795 | 10/23/2001 |
Repeated Application for Confidential Designation, Confidential Supplemental Responses to Air Quality Data Requests 15-19
2 page(s)
| | CEC/Dockets | Grattan And Galati/Galati |
22788 | 10/19/2001 |
E-mail Re: Additional Information Regarding Data Response 117
23 page(s)
| | CEC/Chew/dockets | Heick/Urs |
22777 | 10/22/2001 |
Revised table for the Bio Assessment: Table 7; Appendices for the System Impact Study submitted to the CEC 10/9/01; and Outgrant Application submitted to the Tehama - Colusa Canal Authority 10/10/01 - POS
758 page(s)
| | CEC/Dockets | Grattan & Galati/Galati |
22759 | 10/17/2001 |
2001 California Alamanc of Emissions and Air Quality
80 page(s)
| | CEC/Allen/dockets | Brent K. Takemoto |
22722 | 10/19/2001 |
Comments pertaining to AFC Vol I and II, supplemental and Responses to Data Requests
2 page(s)
| | CEC/Chew/dockets | Dept. Of Fish And Game/Eng |
22683 | 10/16/2001 |
Background Air Quality Tables
5 page(s)
| | CEC/Golden/dockets | Urs/Strehlow |
22682 | 10/16/2001 |
Supplemental Information, PSD Permit Application
4 page(s)
| | United States Epa/Pike/cec/dockets | Reliant Energy/Furstenwerth |
22657 | 10/12/2001 |
Preliminary Determination of Compliance
37 page(s)
| | CEC/Dockets | Colusa Power Plant |
22624 | 10/10/2001 |
Application for Confiential Designationand the attached Confidential Appendix 1, AFC
3 page(s)
| | CEC/Dockets | Grattan & Galati/Galati |
22623 | 10/10/2001 |
Supplemental Information Requested by CCAPCD on 9/26/01 - POS
26 page(s)
| | CEC/Dockets | Grattan & Galati/Grattan |
22573 | 10/2/2001 |
Sign-In Sheet 9/26/2001 Data Response/Issues Resolution Workshop
2 page(s)
| | Dockets | CEC/Pao |
22572 | 10/2/2001 |
Report of Conservation 9/18/2001 between M. Hamblin, CEC and J. Grattan, Counsel to Reliant Energy
1 page(s)
| | Dockets | CEC/Hamblin |
22571 | 10/2/2001 |
Prevention of Significant Deterioration Application
4 page(s)
| | Reliant Energy/Furstenwerth/cec/dockets | United States Environmental Protection Agency/Rios |
22570 | 10/2/2001 |
Completeness of Application for Authority to Construct
2 page(s)
| | Pg&e/Burke/cec/dockets | Dept. Of Agri-air Pollution Control District/Krug |
22569 | 10/2/2001 |
Comments on the Proposed Colusa Power Plant
2 page(s)
| | Reliant Energy Wholesale Grp/Walker/cec/dockets | Us Dept. Of The Interior/Knight |
22562 | 10/1/2001 |
Petition to Intervene by Emerald Farms
2 page(s)
| | CEC/Dockets | Gabrielli Law Office/Gabrielli |
22531 | 10/1/2001 |
Supplemental Information on Data Requests 1 and 20, including a CD-ROM POS
16 page(s)
| | CEC/Dockets | Grattan And Galati/Grattan |
22443 | 9/25/2001 |
Clarifications and Corrections in Response to Data Requests Nos. 3, 47, 87, 92, 103 and 104 POS
25 page(s)
| | CEC/Dockets | Grattan And Galati/Grattan |
22442 | 9/25/2001 |
Sign-In Sheet for Sept. 24, 2001 Site Visit and Informational Hearing
5 page(s)
| | Dockets | CEC/Mendonca |
22441 | 9/25/2001 |
Informational Site Visit and Hearing
2 page(s)
| | CEC/Mendonca/dockets | Gabrielli Law Office/Gabrielli |
22440 | 9/25/2001 |
Questions about the Colusa Power Plant AFC
3 page(s)
| | CEC/Dockets | Smallwood |
22439 | 9/25/2001 |
Comments in support of the project
1 page(s)
| | CEC/Rosenfeld/dockets | City Of Williams/Lewis |
22334 | 9/19/2001 |
Additional Information Responding to Data Requests Nos. 97 and 119 POS
8 page(s)
| | CEC/Dockets | Grattan And Galati/Grattan |
22312 | 9/14/2001 |
Data Response/Issue Resolution Workshop Sept. 26, 2001 POS
2 page(s)
| | Dockets | CEC/Rosenfeld |
22311 | 9/17/2001 |
Issues Identification Report POS
15 page(s)
| | CEC/Rosenfeld, Moore/dockets | CEC/Chew |
22253 | 9/13/2001 |
Responses to Data Request of August 22, 2001 - POS
279 page(s)
| | CEC/Dockets | Grattan & Galati/Grattan |
22207 | 9/7/2001 |
Notice of Public Informational Hearing & Site Visit - POS
8 page(s)
| | CEC/Dockets | CEC/Rosenfeld/moore |
22192 | 9/7/2001 |
Order Granting Petition to Intervene - Marc D. Joseph - Adams, Broadwell, Joseph and Cardozo - POS
5 page(s)
| | CEC/Dockets | CEC/Rosenfeld |
22164 | 9/6/2001 |
Petition to Intervene by CURE
5 page(s)
| | CEC/Dockets | Adams Broadwell Joseph & Cardozo/Joseph |
22119 | 8/29/2001 |
Data Requests
42 page(s)
| | Reliant Energy/Walker/cec/dockets | CEC/Chew |
22116 | 8/30/2001 |
Report of Conversation with Bill Baker, Reliant, Steve Kellogg, Jenny Pretare, URS and Ken Fuller, USFWS regarding site visit for the USFWS so that information for the BO can be gathered
1 page(s)
| | CEC/Dockets | CEC/Dorin |
22077 | 8/21/2001 |
Petition for Intervention POs
2 page(s)
| | CEC/Dockets | Goodin, Macbride, Squeri, Ritchie And Day/Lajaunie |
21988 | 8/24/2001 |
Reliant Energy Colusa County LLC's Determination of Compliance Response to Questions from Colusa County APCD
62 page(s)
| | CEC/Dockets | Grattan & Galati/Grattan |
21860 | 8/15/2001 |
Agency Participation in the review of the Colusa Power Plant AFC and Supplemental filing
2 page(s)
| | Agency Distribution List | CEC/Richins |
21833 | 8/13/2001 |
Supplement in Response to CEC Data Adequacy Review
92 page(s)
| | CEC/Dockets | Grattan And Galati/Grattan |
21803 | 8/10/2001 |
Data Adequacy Recommendation
28 page(s)
| | CEC/Commissioners/dockets | CEC/Larson |
21748 | 8/2/2001 |
Completeness of Application for Authority to Construct
1 page(s)
| | Reliant Energy Colusa Co/Furstenwerth/dockets | Colusa Co. Dept. Of Agric-air Pollution Control Di |
21709 | 7/31/2001 |
Data Adequacy Recommendation
93 page(s)
| | CEC/Commissioners/dockets | CEC/Larson |
21651 | 7/26/2001 |
Memorandum of Ground Sublease and Legal Description
11 page(s)
| | CEC/Dockets | Grattan And Galati/Grattan |
21626 | 7/24/2001 |
Paleontological Resources Technical Report Application for Confidentiality
2 page(s)
| | Grattan & Galati//dockets | CEC/Larson |
21605 | 7/23/2001 |
Report of Conversation between Melinda Dorin, Steve Leach and others
2 page(s)
| | CEC/Dockets | CEC/Dorin |
21604 | 7/23/2001 |
Comments represent the separate evaluations of DTSC's two main programs, Hazardous Waste Management and Site Mitigation
2 page(s)
| | CEC/Chew/dockets | Department Of Toxic Substances Control/Lowry |
21437 | 7/6/2001 |
Application for Confidential Designation - Paleontogogical Resources Technical Report
1 page(s)
| | CEC/Larson/dockets | Grattan & Galati/Gratten |
21402 | 7/11/2001 |
Notice of Receipt
4 page(s)
| | Dockets | CEC/Therkelsen |
21390 | 7/11/2001 |
Document Handling for the Colusa Power Plant
2 page(s)
| | Librarian/Dockets | CEC/Richins |
21389 | 7/11/2001 |
Request for Agency Participation in the Review of the Colusa Power Plant, AFC
3 page(s)
| | Agency Distribution List/Dockets | CEC/Richins |
21352 | 7/6/2001 |
Air Quality Related Values Impact in Class I Areas
5 page(s)
| | CEC/Dockets | Reliant Energy/Walker |
21351 | 7/6/2001 |
Cumlative Impact Modeling - Air Emissions
3 page(s)
| | CEC/Dockets | Reliant Energy/Walker |
21347 | 7/6/2001 |
Additional Information Related to Appendix F - Initial Load Flow Study
680 page(s)
| | CEC/Dockets | Reliant Energy/Walker |
21334 | 7/6/2001 |
Prevention of Significant Deterioration (PSD) Permit Application
293 page(s)
| | Us Environmental Protection Agency/Rios/cec/docket | Reliant Energy/Furstenwerth |
21333 | 7/6/2001 |
Application for Authority to Construct
374 page(s)
| | Colusa Co. Air Pollution Control Dist/Krug/dockets | Reliant Energy/Furstenwerth |
1584-0 | 12/6/2001 |
Status Conference
46 page(s)
| | | |
1564-0 | 10/4/2001 |
Informational Hearing and Sie Visit
90 page(s)
| | | |
1560-0 | 10/4/2001 |
Informational Hearing and Site Visit
85 page(s)
| | | |