Docket Log

Docket: 00-AFC-02
Project Title: Mountainview Power Company, LLC Application for Certification
Generated On: 4/17/2014 8:44:39 AM

TN #Docketed DateDocument TitleExhibit #ToFrom
208996/14/2001Correct Mountainview Commission Decision POS
Correct Mountainview Commission Decision POS
4 page(s)
 Interested Parties/DocketCEC Cec
205115/29/2001Memorandum of Understanding Between the CEC and The City of Redlands for Design Review, Plan Check, and Construction Inspection of the Mountainview Power Plant Project
Memorandum of Understanding Between the CEC and The City of Redlands for Design Review, Plan Check, and Construction Inspection of the Mountainview Power Plant Project
5 page(s)
 CEC/Therkelsen/docketCity Of Redlands/Gilbreath
202535/17/2001Public Adviser's Status Reports 1st Trimester-2001
Public Adviser's Status Reports 1st Trimester-2001
3 page(s)
 DocketCEC/Mendonca
202545/17/2001Public Adviser's Status Reports 1st Trimester-2001
Public Adviser's Status Reports 1st Trimester-2001
3 page(s)
 DocketCEC/Mendonca
192333/21/2001COMMISSION DECISION
COMMISSION DECISION
254 page(s)
 DocketsCEC Cec
193823/21/2001Notice of Determination for the Mountainview Power Plant Project
Notice of Determination for the Mountainview Power Plant Project
4 page(s)
 DocketsCEC/Reede
193843/21/2001CA Department of Fish & Game receipt - Notice of Decision
CA Department of Fish & Game receipt - Notice of Decision
1 page(s)
 DocketsLivingston & Mattesich
189873/6/2001Notice of Commission Hearing on Proposed Decision - POS
Notice of Commission Hearing on Proposed Decision - POS
3 page(s)
 DocketsCEC/Moore/pernell
184702/9/2001Notice of Availability of Proposed Decision & Committee Conference (Feb. 26, 2001) (Attachment: Proof of Service)
Notice of Availability of Proposed Decision & Committee Conference (Feb. 26, 2001) (Attachment: Proof of Service)
3 page(s)
 CEC/DocketCEC/Moore/pernell
186692/9/2001Notice of Availability of Proposed Decision & Committee Conference - POS
Notice of Availability of Proposed Decision & Committee Conference - POS
4 page(s)
 CEC/DocketsCEC/Moore/pernell
185172/7/2001Presiding Member's Proposed Decision - POS - Publication # 800-01-002
Presiding Member's Proposed Decision - POS - Publication # 800-01-002
258 page(s)
 DocketsCEC/Moore/pernell
184272/6/2001Fianl Determination of Compliance
Fianl Determination of Compliance
95 page(s)
 CEC/TherkelsenSouth Coast Air Quality Management Dist/Nazemi
180581/29/2001Intervenor City of Downey Second Status Report - POS
Intervenor City of Downey Second Status Report - POS
5 page(s)
 CEC/DocketsOliver, Vose, Sandifer, Murphy & Lee/Lee
180431/24/2001Sign-in Sheet RE: Notice of 2nd Evidentiary Hearing (Air Quality)
Sign-in Sheet RE: Notice of 2nd Evidentiary Hearing (Air Quality)
1 page(s)
 CEC/DocketCEC/Staff
180061/23/2001Summary of Air Quality Conditions of Certification
Summary of Air Quality Conditions of Certification
9 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
180141/23/2001Revised Transmission System Engineering, Conditions of Certification - POS
Revised Transmission System Engineering, Conditions of Certification - POS
7 page(s)
 CEC/DocketsCEC/Reede
180081/22/2001Addendum to the Revised Air Quality Staff Assessment - POS
Addendum to the Revised Air Quality Staff Assessment - POS
18 page(s)
 CEC/DocketsCEC Cec
179521/19/2001Additional air quality modeling analysis - 5 CD's
Additional air quality modeling analysis - 5 CD's
8 page(s)
 CEC/ReedeSierra Research/Andrews
178821/17/2001Biological Consultation (Attachment: Proof of Service)
Biological Consultation (Attachment: Proof of Service)
563 page(s)
 CEC/ReedeLivingston & Matesich/Varanini
178041/12/2001Notice of Second Evidentiary Hearing (Air Quality) - POS
Notice of Second Evidentiary Hearing (Air Quality) - POS
4 page(s)
 CEC/DocketsCEC/Moore/pernell
178661/12/2001Notice of 2nd Evidentiary Hearing (Air Quality) (Attachment: Proof of Service)
Notice of 2nd Evidentiary Hearing (Air Quality) (Attachment: Proof of Service)
5 page(s)
 CEC/DocketCEC/Moore/pernell
179641/12/2001Public Adviser's Status Reports 2000
Public Adviser's Status Reports 2000
41 page(s)
 CEC/DocketCEC/Pao
178001/11/2001Final Facilities Study
Final Facilities Study
35 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
178011/11/2001Annexation Completion
Annexation Completion
6 page(s)
 CEC/DocketsLivingston & Mattesich/Mckinsey
178681/11/2001Letter ro Hearing Officer, Garret Shean Requesting Evidentiary Hearing - POS
Letter ro Hearing Officer, Garret Shean Requesting Evidentiary Hearing - POS
4 page(s)
 CEC/SheanLivingston & Mattesich/Mckinsey
179341/11/2001Letter requesting Evidentiary Hearing - POS
Letter requesting Evidentiary Hearing - POS
4 page(s)
 CEC/DocketsLivingston & Mattesich/Mckinsey
176761/4/2001Notice of Intent to Issue Permit - Frank Wilson & Associates - POS
Notice of Intent to Issue Permit - Frank Wilson & Associates - POS
8 page(s)
 So. Coast Air Quality Mtg. Dist/PerriLivingston & Mattesich/Varanini
176771/4/2001Notice of Intent to Issue Permit - South Coast Air Quality Management District
Notice of Intent to Issue Permit - South Coast Air Quality Management District
5 page(s)
 CEC/DocketsLivingston & Mattesich/Varanini
176241/2/2001Request for Agency Comments on the Revised Air quality Staff Assessment
Request for Agency Comments on the Revised Air quality Staff Assessment
1 page(s)
 Agency Distribution ListCEC/Therkelsen
1762512/29/2000Document Handling - Revised Air Quality Staff Assessment
Document Handling - Revised Air Quality Staff Assessment
2 page(s)
 LibrarianCEC/Therkelsen
1765812/29/2000Study Summary along with Comments
Study Summary along with Comments
3 page(s)
 Souther California Edison/WilliamsCalifonia Iso/Miller
1769312/27/2000Revised Air Quality Staff Assessment - Staff Report
Revised Air Quality Staff Assessment - Staff Report
109 page(s)
 CEC/DocketsCEC Cec
1743512/20/2000Letter with Notice of Intent to Issue Permit Pursuant to AQMD Rules 212, 1710 and 3006
Letter with Notice of Intent to Issue Permit Pursuant to AQMD Rules 212, 1710 and 3006
150 page(s)
 CEC/ReedeSouth Coast Aqmd/Mueller
1719312/6/2000Supplemental Visual Resources Testimony Regarding Mountain Cooling Tower and Heat Recovery Steam Generator Steam Plumes (Attachment: Proof of Service)
Supplemental Visual Resources Testimony Regarding Mountain Cooling Tower and Heat Recovery Steam Generator Steam Plumes (Attachment: Proof of Service)
10 page(s)
 CEC/SheanCEC/Knight
1722912/5/2000Revised Cumulative Air Quality Impact Analysis Modeling Files (CD's)
Revised Cumulative Air Quality Impact Analysis Modeling Files (CD's)
1 page(s)
 CEC/ReedeSierra Research/Andrews
1703511/22/2000Conditions of Certification [Revised]
Conditions of Certification [Revised]
59 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
1679011/16/2000Comments on the Staff Assessment
Comments on the Staff Assessment
4 page(s)
 Aspen Envir./NelsonsDepartment Of Fish & Game/Black
1679211/15/2000Testimony of Johan Galleberg
Testimony of Johan Galleberg
15 page(s)
 CEC/DocketsCalifornia Iso/Galleberg
1663411/8/2000Workshop and Pre-Hearing Conference - Redlands
Workshop and Pre-Hearing Conference - Redlands
4 page(s)
 CEC/DocketsMountainview Power Plant
1657311/7/2000Supplemental Visual Documentation - KOP #4 Conceptual Planting Plan - KOP #4 Color Photographic Simulation
Supplemental Visual Documentation - KOP #4 Conceptual Planting Plan - KOP #4 Color Photographic Simulation
3 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
1668811/7/2000Comments on the Staff Assessment
Comments on the Staff Assessment
3 page(s)
 CEC/ReedeUs Dept. Of The Interior/Bartel
1668911/7/2000Staff Assessment
Staff Assessment
5 page(s)
 CEC/ReedeSan Bernardino Valley Municipal Water Dist./Reiter
1669011/7/2000Review and Comments RE: Impacts the Facility would have on the Santa Ana River Parkway
Review and Comments RE: Impacts the Facility would have on the Santa Ana River Parkway
3 page(s)
 CEC/ReedeDept. Of Public Works/Weinstein
1668711/3/2000The South Coast AQMD has Modified Review of the Proposed Expansion of Mountainview Power, LLC's Facility located in the City of San Bernardino. (Attachments: Revised Engineering Analysis and Evaluation of the Expansion (AQMD's PDOC); Draft Title V and AQMD RECLAIM Permit, Section H
The South Coast AQMD has Modified Review of the Proposed Expansion of Mountainview Power, LLC's Facility located in the City of San Bernardino. (Attachments: Revised Engineering Analysis and Evaluation of the Expansion (AQMD's PDOC); Draft Title V and AQMD RECLAIM Permit, Section H
93 page(s)
 CEC/ReedeSo. Coast Aqmd/Mueller
1654011/1/2000Notice of Evidentiary Hearing (Attachment: Proof of Service)
Notice of Evidentiary Hearing (Attachment: Proof of Service)
4 page(s)
 CEC/DocketCEC/Moore/pernell
1656210/27/2000Mountainview Power Plant CEQA and LORS Matrix
Mountainview Power Plant CEQA and LORS Matrix
108 page(s)
 CEC/DocketLivingston & Mattesich/Mckinsey
1642810/26/2000AQMD's PDOC; Draft Title V and AQMD RECLAIM Permit, Section H; Memo from AQMD District Counsel on PSD Applicability; Memo from AQMD's Mohsen Nazemi on Interpollutant Offsets; Memo from AQMD's Henry Hogo on Air Modeling Analysis
AQMD's PDOC; Draft Title V and AQMD RECLAIM Permit, Section H; Memo from AQMD District Counsel on PSD Applicability; Memo from AQMD's Mohsen Nazemi on Interpollutant Offsets; Memo from AQMD's Henry Hogo on Air Modeling Analysis
114 page(s)
 CEC/ReedeSo. Coast Aqmd/Mueller
1637310/25/2000Description and Process Information RE: Mountainview Power Project AFC
Description and Process Information RE: Mountainview Power Project AFC
2 page(s)
 Member Of The Senate/Hon. BrulteCEC/Larson
1639710/25/2000Description and Process of the Mountainview Power AFC
Description and Process of the Mountainview Power AFC
2 page(s)
 Member Of The Assembly/Hon. LeonardCEC/Larson
1627910/23/2000Applicant's CEQA Matrix and LORS Matrix - POS
Applicant's CEQA Matrix and LORS Matrix - POS
108 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
1620810/20/2000Notice of Committee Workshops & Pre-Hearing
Notice of Committee Workshops & Pre-Hearing
6 page(s)
 CEC/DocketCEC/Moore/pernell
1622310/20/2000City of Redlands' Ordinance No. 2437 Approving - Development Agreement Between City of Redlands and Mountain Power Co. LLC. (Attachment: Proof of Service)
City of Redlands' Ordinance No. 2437 Approving - Development Agreement Between City of Redlands and Mountain Power Co. LLC. (Attachment: Proof of Service)
38 page(s)
 CEC/DocketLivingston & Mattesich/Mckinsey
1641410/20/2000Request for Agency Comments on the Staff Assessment for the Mountainview Power Plant
Request for Agency Comments on the Staff Assessment for the Mountainview Power Plant
1 page(s)
 Agency Distribution ListCEC/Therkelsen
1641710/20/2000NOTICE of Availability - Staff Assessment (Attachment: Order Form)
NOTICE of Availability - Staff Assessment (Attachment: Order Form)
2 page(s)
 CEC/DocketCEC/Therkelsen
1641810/20/2000Description and Process RE: Mountainview Power Plant Project AFC
Description and Process RE: Mountainview Power Plant Project AFC
2 page(s)
 City Of Redlands/GilbreathCEC/Therkelsen
1641910/20/2000Review and Process RE: Mountainview Power Plant Project AFC
Review and Process RE: Mountainview Power Plant Project AFC
2 page(s)
 San Bernardino Co./Hon. MikelsCEC/Therkelsen
1642010/20/2000Document Handling for the Mountainview Power Plant Project Staff Assessment (Attachment: Letter to Members of the Public Dated October 20, 2000)
Document Handling for the Mountainview Power Plant Project Staff Assessment (Attachment: Letter to Members of the Public Dated October 20, 2000)
2 page(s)
 LibrarianCEC/Therkelsen
1769610/20/2000Staff Assessment
Staff Assessment
574 page(s)
 CEC/DocketsCEC Cec
1618410/16/2000Response to Committee Order Directing Staff to Make Verification Timetable for the Mountainview Power Project (Attachment: Proof of Service)
Response to Committee Order Directing Staff to Make Verification Timetable for the Mountainview Power Project (Attachment: Proof of Service)
7 page(s)
 CEC/Moore/pernellCEC/Therkelsen
1600910/11/2000Parcel Map Showing Mountainview Power Company's Ownership of the Development Property.
Parcel Map Showing Mountainview Power Company's Ownership of the Development Property.
5 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
1600810/10/2000Conceptual Planting Plan (Data Request #158)
Conceptual Planting Plan (Data Request #158)
6 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
1604510/6/2000Response to Data Request #165 - POS
Response to Data Request #165 - POS
4 page(s)
 CEC/ReedeLivingston Mattesich
159109/29/2000Cumulative air quality impact analysis
Cumulative air quality impact analysis
12 page(s)
 CEC/ReedeSierra Research/Andrews
159089/28/2000Applicant's Biological Issues Status Report
Applicant's Biological Issues Status Report
3 page(s)
 CEC/ReedeLivingston & Matesich
159099/27/2000Scheduling Order re Committee Workshops & Evidentiary Hearing - POS
Scheduling Order re Committee Workshops & Evidentiary Hearing - POS
3 page(s)
 CEC/DocketsCEC/Moore/pernell
158189/21/2000Summary status of securing the necessary emission offset credits ERC's and RECLAIM trading credits (RTCs)
Summary status of securing the necessary emission offset credits ERC's and RECLAIM trading credits (RTCs)
9 page(s)
 CEC/ReedeSierra Research/Andrews
158049/20/2000Laws, Ordinances, Regulations & Standards - POS
Laws, Ordinances, Regulations & Standards - POS
4 page(s)
 CEC/DocketsShean
158169/20/2000Order Directing Applicant to Complete Lors Matrix - POS
Order Directing Applicant to Complete Lors Matrix - POS
5 page(s)
 CEC/DocketsCEC/Moore/pernell
157739/19/2000Response to Data Requests Set # 1 - POS
Response to Data Requests Set # 1 - POS
61 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
157949/18/2000E-mail disapproving the MEC Power Plant
E-mail disapproving the MEC Power Plant
3 page(s)
 Governor DavisWu
158079/18/2000Order Directing Staff to Make Verification Timetable
Order Directing Staff to Make Verification Timetable
5 page(s)
 DocketsCEC/Moore/pernell
158639/18/2000Order Directing Staff to Make Verification Timetable (Attachment: Electronic Proof of Service)
Order Directing Staff to Make Verification Timetable (Attachment: Electronic Proof of Service)
3 page(s)
 CEC/DocketCEC/Moore/pernell
157689/13/2000Letter of concern that the proposed plant's fault current contributions
Letter of concern that the proposed plant's fault current contributions
1 page(s)
 CEC/ReedeState Water Project Analysis Office/Ramirez
157529/11/2000Order Directing Applicant to Complete Siting Review Matrix - POS
Order Directing Applicant to Complete Siting Review Matrix - POS
50 page(s)
 CEC/DocketsCEC/Shean
157379/8/2000Order Directing Applicant to Complete Siting Review Matrix
Order Directing Applicant to Complete Siting Review Matrix
48 page(s)
 CEC/DocketCEC/Moore/pernell
157409/8/2000Second Data Response which includes Data Responses Filed with the CEC on Sept. 7, 2000
Second Data Response which includes Data Responses Filed with the CEC on Sept. 7, 2000
1 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
157059/7/2000Responses to Data Requests, Number 125 through 168; Supplemental Responses to Data Requests Numbers 2, 21, 22, 28, 32, 71 and 76. (Attachment: Proof of Service)
Responses to Data Requests, Number 125 through 168; Supplemental Responses to Data Requests Numbers 2, 21, 22, 28, 32, 71 and 76. (Attachment: Proof of Service)
185 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
157389/7/2000Confidential Designation of Cultural Ressources Information
Confidential Designation of Cultural Ressources Information
2 page(s)
 CEC/LarsonLivingston & Mattesich/Mckinsey
157399/7/2000Visual Renderings of KOP 4-Tree Planting Maturity, in Response to Data Request No. 159; Representative Photographs of Mountainview Power Plant are Submitted Pursuant to Data Request No. 160.
Visual Renderings of KOP 4-Tree Planting Maturity, in Response to Data Request No. 159; Representative Photographs of Mountainview Power Plant are Submitted Pursuant to Data Request No. 160.
6 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
156649/6/2000July 31, 2000, Order Directing Staff to List Past Conditions of Certifications (Attachment: Proof of Service)
July 31, 2000, Order Directing Staff to List Past Conditions of Certifications (Attachment: Proof of Service)
85 page(s)
 CEC/Moore/pernellCEC/Reede
155988/30/2000Data Request Workshop Project Mailing List - 8/22/00 - POS
Data Request Workshop Project Mailing List - 8/22/00 - POS
5 page(s)
 CEC/DocketsCEC Cec
155438/29/2000Data Requests - POS
Data Requests - POS
4 page(s)
 Mountainview Power Co./ChandlerCEC/Reede
156368/29/2000Data Requests - POS
Data Requests - POS
4 page(s)
 Mountainview Power/ChandlerCEC/Reede
155858/25/2000Supplement to AFC - Applicant's Analysis and Stipulation to: Necessary Conditions of Certification
Supplement to AFC - Applicant's Analysis and Stipulation to: Necessary Conditions of Certification
403 page(s)
 CEC/Moore/reede/sheanLivingston & Mattesich/Varanini
155288/16/2000Supplemental Responses to first set of Data Requests
Supplemental Responses to first set of Data Requests
4 page(s)
 CEC/DocketsMountainview Power Plant
155308/16/2000Order Instituting Electronic Filing Pilot Project
Order Instituting Electronic Filing Pilot Project
8 page(s)
 CEC/DocketsCEC/Pernell/moore
155038/15/2000Letter reporting the process in the 1000MW Mountainview Power Project and the Central Valley Agricultural Biomass-to-Energy Program.
Letter reporting the process in the 1000MW Mountainview Power Project and the Central Valley Agricultural Biomass-to-Energy Program.
2 page(s)
 Governor Gray DavisEcotek/Miller
153518/14/2000Water Resources Submittal Responses RE: Water Resources for First Set of Data Request (Attachment: Proof of Service)
Water Resources Submittal Responses RE: Water Resources for First Set of Data Request (Attachment: Proof of Service)
39 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
154258/10/2000NOTICE of Workshop on Data Requests (Attachment: Proof of Service)
NOTICE of Workshop on Data Requests (Attachment: Proof of Service)
4 page(s)
 CEC/DocketCEC/Moore
154268/10/2000Data Requests (Attached: Proof of Service)
Data Requests (Attached: Proof of Service)
18 page(s)
 Mountainview Power Co. Llc/ChandlerCEC/Reede
153548/4/2000Data Response Workshop Summary - (Attachment: Proof of Service)
Data Response Workshop Summary - (Attachment: Proof of Service)
9 page(s)
 Interested PartiesCEC/Reede
153558/3/2000Photographs Taken for Visual Resources Purposes and Enclosed in Responses to the First Set of Data Requests Made by the California Energy Commission Staff (Attachment: Proof of Service)
Photographs Taken for Visual Resources Purposes and Enclosed in Responses to the First Set of Data Requests Made by the California Energy Commission Staff (Attachment: Proof of Service)
5 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
153568/3/2000Past Conditions of Certification (Conditions Document) (Attachment: Proof of Service)
Past Conditions of Certification (Conditions Document) (Attachment: Proof of Service)
4 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
153798/3/2000Supplemental Responses in CD-ROM Format
Supplemental Responses in CD-ROM Format
5 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
153498/2/2000Sign-in Sheet RE: July 26, 2000 Mountainview Community Meeting
Sign-in Sheet RE: July 26, 2000 Mountainview Community Meeting
1 page(s)
 CEC/DocketCEC/Staff
153578/2/2000SUPPLEMENTAL RESPONSES of Mountainview Power Company, LLC to the California Energy Commission's First Set of Data Requests (1 to 124) (Attachment: Proof of Service)
SUPPLEMENTAL RESPONSES of Mountainview Power Company, LLC to the California Energy Commission's First Set of Data Requests (1 to 124) (Attachment: Proof of Service)
162 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
153508/1/2000Sign-in Sheet RE: Data Response Workshop (July 26, 2000)
Sign-in Sheet RE: Data Response Workshop (July 26, 2000)
5 page(s)
 CEC/DocketCEC/Staff
153528/1/2000Sign-in RE: Data Response Workshop (July 27, 2000)
Sign-in RE: Data Response Workshop (July 27, 2000)
2 page(s)
 CEC/DocketCEC/Staff
153537/31/2000ORDER Directing Staff to List Past Condition of Certification (Attachment: Proof of Service)
ORDER Directing Staff to List Past Condition of Certification (Attachment: Proof of Service)
4 page(s)
 CEC/DocketCEC/Moore/pernell
151767/24/20005 diskettes - Plume visibility modeling analysis and data - Data Requests # 121 and 122
5 diskettes - Plume visibility modeling analysis and data - Data Requests # 121 and 122
5 page(s)
 CEC/ReedeLivingston & Mattesich
153487/24/2000DOC/PTC Applications for Mountainview Power Company
DOC/PTC Applications for Mountainview Power Company
13 page(s)
 South Coast Aqmd/PerriSierra Research/Andrews
152697/21/2000Detailed Construction Emission Calculations - Appendix G.2
Detailed Construction Emission Calculations - Appendix G.2
14 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
152707/21/2000Attachment VIS-121A
Attachment VIS-121A
10 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
151487/20/2000Order Granting Petition to Intervene - POS
Order Granting Petition to Intervene - POS
6 page(s)
 CEC/DocketCEC/Moore
151577/20/20005 diskettes - Data Request in the First Set of Data Requests required us to remodel construction emissions impact
5 diskettes - Data Request in the First Set of Data Requests required us to remodel construction emissions impact
1 page(s)
 CEC/ReedeLivingston Mattesich/Mckinsey
150917/17/2000Letter to remove the Figure WAT-74a from Data Response # 116 and place behind Data Response # 74.
Letter to remove the Figure WAT-74a from Data Response # 116 and place behind Data Response # 74.
2 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
150657/14/2000Phase II Environmental Site Assessment for San Bernardino Generating Station June 6, 1997
Phase II Environmental Site Assessment for San Bernardino Generating Station June 6, 1997
1062 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
150807/14/2000Responses to Data Request (Attached: Proof of Service)
Responses to Data Request (Attached: Proof of Service)
782 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
151307/14/2000Task 3B Technical Memorandum Phase 1 Investigation of the Leading Edge of the Redlands (Dated Sept. 18, 1998)
Task 3B Technical Memorandum Phase 1 Investigation of the Leading Edge of the Redlands (Dated Sept. 18, 1998)
52 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
151317/14/2000Engineering Diagrams Depicting Typical Lightning Diagrams for Power Plants
Engineering Diagrams Depicting Typical Lightning Diagrams for Power Plants
23 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
151327/14/2000Cover Letter RE: Confidential Designation (Cultural Resources; Air Quality)
Cover Letter RE: Confidential Designation (Cultural Resources; Air Quality)
5 page(s)
 CEC/LarsonLivingston & Mattesich/Mckinsey
151337/14/2000Analysis of Mountainview Power Plant Usage and SWQCB Resolution 75-58 Policy - Submitted to the California Energy Commission in Anticipation of Workshop Discussion Regarding Water Resources (July 2000)
Analysis of Mountainview Power Plant Usage and SWQCB Resolution 75-58 Policy - Submitted to the California Energy Commission in Anticipation of Workshop Discussion Regarding Water Resources (July 2000)
27 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
151357/14/2000Visual Renderings of KOP's 1 to 4 and an Aerial View in Response to Data Requests Nos. 106 and 111.
Visual Renderings of KOP's 1 to 4 and an Aerial View in Response to Data Requests Nos. 106 and 111.
11 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
151367/14/2000HSI - Geotrans, 1999. "December 1998 Data Report - Water Supply Contingency Plan, February 1, 1999
HSI - Geotrans, 1999. "December 1998 Data Report - Water Supply Contingency Plan, February 1, 1999
22 page(s)
 CEC/DocketLivingston & Mattesich/Mckinsey
151417/14/2000Comparative Analysis of Wet, Dry and Wet-Dry Hybrid Cooling Alternatives (Prepared by Duke/Fluor Daniel, Dated July, 2000)
Comparative Analysis of Wet, Dry and Wet-Dry Hybrid Cooling Alternatives (Prepared by Duke/Fluor Daniel, Dated July, 2000)
0 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
151427/14/2000"Direct Connection Permit Application", Santa Ana Watershed Project Authority
"Direct Connection Permit Application", Santa Ana Watershed Project Authority
0 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
151437/14/2000"Hydrology, Description of Computer Models, and Evaluation of Selected Water Management Alternatives in the San Bernardino Area" (1997) will be provided to the CEC Staff.
"Hydrology, Description of Computer Models, and Evaluation of Selected Water Management Alternatives in the San Bernardino Area" (1997) will be provided to the CEC Staff.
0 page(s)
 CEC/DocketLivingston & Mattesich/Mckinsey
151627/14/2000Slade, R. C., 1986. "Hydrogeology Feasibility Study for Groundwater Development: Prepared for Department of Public Works, City of Redlands, CA", February 1986.
Slade, R. C., 1986. "Hydrogeology Feasibility Study for Groundwater Development: Prepared for Department of Public Works, City of Redlands, CA", February 1986.
87 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
151637/14/2000SBVMWD, 1998. "High Groundwater Mitigation Project for the Bunker Hill Basin Area of Historic High Groundwater (Draft)", San Bernardino Valley Municipal Water District High Groundwater Mitigation Committee, August 7, 1998.
SBVMWD, 1998. "High Groundwater Mitigation Project for the Bunker Hill Basin Area of Historic High Groundwater (Draft)", San Bernardino Valley Municipal Water District High Groundwater Mitigation Committee, August 7, 1998.
44 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
151707/14/2000HSI-Geotrans, 1997. "Redlands Groundwater Modeling Project - Perchlorate Modeling Technical Memorandum".
HSI-Geotrans, 1997. "Redlands Groundwater Modeling Project - Perchlorate Modeling Technical Memorandum".
75 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
151717/14/2000SBVWCD, 1999. "Engineering Investigation of the Bunker Hill Basin, 1998-99". March 1999.
SBVWCD, 1999. "Engineering Investigation of the Bunker Hill Basin, 1998-99". March 1999.
135 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
151727/14/2000HSI-Geotrans, 1998a. "Redlands Groundwater Modeling Report - Groundwater Flow and TCE Modeling Documentation Report".
HSI-Geotrans, 1998a. "Redlands Groundwater Modeling Report - Groundwater Flow and TCE Modeling Documentation Report".
352 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
152617/14/2000SBVMWD, 1998. "High Groundwater Mitigation Project for the Bunker Hill Basin Area of Historic High Groundwater (DRAFT)", San Bernardino Valley Municipal Water District High Groundwater Mitigation Committee, August 7, 1998.
SBVMWD, 1998. "High Groundwater Mitigation Project for the Bunker Hill Basin Area of Historic High Groundwater (DRAFT)", San Bernardino Valley Municipal Water District High Groundwater Mitigation Committee, August 7, 1998.
44 page(s)
 CEC/ReedeLivingston & Mattesich/Mckinsey
150227/7/2000Workshop Notice: Data Response Workshop (July 26 -27, 2000) (Attachment: Map of Meeting Location; Proof of Service)
Workshop Notice: Data Response Workshop (July 26 -27, 2000) (Attachment: Map of Meeting Location; Proof of Service)
4 page(s)
 CEC/DocketCEC/Moore
150237/7/2000Comments from Mountainview Power Plant RE: Data Requests made by the California Energy Commission Staff
Comments from Mountainview Power Plant RE: Data Requests made by the California Energy Commission Staff
2 page(s)
 CEC/Reede/mooreLivingston & Mattesich/Varanini
150206/30/2000Sign in Sheet: Data Request Workshop (June 29, 2000)
Sign in Sheet: Data Request Workshop (June 29, 2000)
5 page(s)
 CEC/DocketCEC/Staff
150216/30/2000Summary of the June 29, 2000 Data Request Workshop #1 (Attachment: Proof of Service)
Summary of the June 29, 2000 Data Request Workshop #1 (Attachment: Proof of Service)
6 page(s)
 Workshop ParticipantsCEC/Reede
149596/22/2000Mountainview Power Plant Project Data Requests (Attachment: Proof of Service)
Mountainview Power Plant Project Data Requests (Attachment: Proof of Service)
40 page(s)
 Mountainview Power Co. Llc/ChandlerCEC/Reede
148846/20/2000Workshop Notice - Notice of Workshop on Data Request (Attachment: Proof of Service)
Workshop Notice - Notice of Workshop on Data Request (Attachment: Proof of Service)
2 page(s)
 CEC/DocketCEC/Moore
149266/19/2000Scheduling Order 1st & 2nd Quarters - POS
Scheduling Order 1st & 2nd Quarters - POS
6 page(s)
 CEC/DocketsCEC/Moore/pernell
155976/14/2000Mountain View's Informational Hearing and Site Visit Project Mailing List - 6/13/00
Mountain View's Informational Hearing and Site Visit Project Mailing List - 6/13/00
6 page(s)
 CEC/DocketsCEC Cec
147526/6/2000Issues Identification Report (Attachment: Proof of Service)
Issues Identification Report (Attachment: Proof of Service)
11 page(s)
 CEC/Moore/pernellCEC/Reede
147306/1/2000Petition to Intervene by CURE - POS
Petition to Intervene by CURE - POS
7 page(s)
 CEC/DocketsCure/Joseph
146375/26/2000Energy Commission Order - Order # 00-0523-03
Energy Commission Order - Order # 00-0523-03
5 page(s)
 CEC/DocketsCEC/Keese
146225/24/2000NOTICE of Public Information Hearing and Site Visit - (June 13, 2000) (Attachment: Proof of Service)
NOTICE of Public Information Hearing and Site Visit - (June 13, 2000) (Attachment: Proof of Service)
6 page(s)
 CEC/DocketCEC/Moore/pernell
146215/17/2000Hearing Officer Assignment - Garret Shean to assist the Committee in conducting proceedings
Hearing Officer Assignment - Garret Shean to assist the Committee in conducting proceedings
1 page(s)
 CEC/CommissionersCEC/Keese
144225/10/2000Third Data Adequacy Recommendation
Third Data Adequacy Recommendation
15 page(s)
 CEC Cec CommissionersCEC/Larson
143825/8/2000Additional maps prepared by the information center for Cultural Resources:
Additional maps prepared by the information center for Cultural Resources:
11 page(s)
 CEC/LarsonLivingston & Mattesich/Mckinsey`
143835/5/2000Cultural and Paleontological Resources Technical Reports, Application for Confidentiality
Cultural and Paleontological Resources Technical Reports, Application for Confidentiality
2 page(s)
 Livingtion & Mattesich/MckinseyCEC/Larson
143845/5/2000Supplemental Information
Supplemental Information
1 page(s)
 LibrarianCEC/Haussler For Therkelsen
143645/3/2000Second Supplement to AFC - Verification in Support of the AFC
Second Supplement to AFC - Verification in Support of the AFC
2 page(s)
 CEC/LarsonLivingston & Mattesich/Reed
143615/2/2000Letter of Response to request for five additional copies of Attachment B (Paleontological Resources -Confidential Record)
Letter of Response to request for five additional copies of Attachment B (Paleontological Resources -Confidential Record)
1 page(s)
 CEC/ReedeLivingston & Mattesich/Varanini
143525/1/2000Second SUPPLEMENT to Application for Certification
Second SUPPLEMENT to Application for Certification
81 page(s)
 CEC/LarsonLivingston & Mattesich/Varanini
144245/1/2000Application for Confidential Designation: Cultural Resources (Attachment A), Paleontological (Attachment B).
Application for Confidential Designation: Cultural Resources (Attachment A), Paleontological (Attachment B).
4 page(s)
 CEC/LarsonLivingston & Mattesich/Mckinsey
144365/1/2000Second Supplement to the Application for Certification for the Mountain Power Plant Project
Second Supplement to the Application for Certification for the Mountain Power Plant Project
1 page(s)
 Agency Distribution ListCEC/Therkelsen
143694/26/2000Supplement to the AFC - Attachments: Request for Agency Participation; Request For a Special List and the Initiation of Informal Consultation
Supplement to the AFC - Attachments: Request for Agency Participation; Request For a Special List and the Initiation of Informal Consultation
10 page(s)
 CEC/ReedeUs Dept. Of The Interior Fish And Wildlife Service
142614/19/2000Second Data Adequacy Recommendation
Second Data Adequacy Recommendation
65 page(s)
 CEC/Keese/laurie/pernell/mooreCEC/Larson
142184/18/2000Review of the Additional Information dated March 24, 2000
Review of the Additional Information dated March 24, 2000
1 page(s)
 Mountainview Power Co./NollSouth Coast Aqmd/Mueller
142194/18/2000Review of the System Impact Study, dated December 17, 1999 of the Mountainview/Riverside Canal Interconnection Study.
Review of the System Impact Study, dated December 17, 1999 of the Mountainview/Riverside Canal Interconnection Study.
2 page(s)
 So. Calif. Edison Co./VelardeCe-iso/Mavis
155274/16/2000Regarding Water Resources to First Set of Data Request
Regarding Water Resources to First Set of Data Request
5 page(s)
 CEC/ReedeLivingston & Mattesich
141834/14/2000Mountainview Power Facility Expansion Project: Additional Information Dated March 24, 2000, Submitted by Sierra Research on Behalf of the MVPC Regarding the Proposed Expansion Project.
Mountainview Power Facility Expansion Project: Additional Information Dated March 24, 2000, Submitted by Sierra Research on Behalf of the MVPC Regarding the Proposed Expansion Project.
1 page(s)
 Mountainview Power CompanySouth Coast Aqmd/Mueller
151444/14/2000CSM, 1997. "Screening-Level Tools for Modeling Fate and Transport to Trace Organic Chemicals in Soil and Groundwater", Colorado School of Mines, June 1997.
CSM, 1997. "Screening-Level Tools for Modeling Fate and Transport to Trace Organic Chemicals in Soil and Groundwater", Colorado School of Mines, June 1997.
0 page(s)
 CEC/ReedeLicingston & Mattesich/Mckinsey
141314/4/2000Letter from the US Environmental Protection Agency Region IX regarding an update on the air pollution control technology - POS
Letter from the US Environmental Protection Agency Region IX regarding an update on the air pollution control technology - POS
7 page(s)
 CEC/DocketCEC/Johnson
140573/31/2000SUPPLEMENT to Application for Certification
SUPPLEMENT to Application for Certification
234 page(s)
 CEC/SmithLivingston & Mattesich/Varanini
140593/31/2000Transmittal Letter: Supplement to the Application for Certification
Transmittal Letter: Supplement to the Application for Certification
1 page(s)
 Agency Distribution ListCEC/Therkelsen
140603/31/2000Transmittal Letter: Supplemental Information
Transmittal Letter: Supplemental Information
1 page(s)
 LibrarianCEC/Therkelsen
140493/30/2000DOC/PTC - Revised preliminary specifications for the 4 (SCR)/CO
DOC/PTC - Revised preliminary specifications for the 4 (SCR)/CO
8 page(s)
 South Coast Aqmd/PerriSierra Research/Andrews
140403/28/2000Response to the District's March 8, 2000, letter requesting additional informaiton regarding the DOC/PTC
Response to the District's March 8, 2000, letter requesting additional informaiton regarding the DOC/PTC
15 page(s)
 South Coast Aqmb/PerriSierra Research/Rubenstein
139253/16/2000Review/Comments and Recommendations RE: Mountainview AFC.
Review/Comments and Recommendations RE: Mountainview AFC.
5 page(s)
 CEC/DocketU.s. Dept. Of The Interior/Bartel
138943/14/2000Review of Applications for the MVPC Expansion Project on February 9, 2000; Summary of Completeness Determinations.
Review of Applications for the MVPC Expansion Project on February 9, 2000; Summary of Completeness Determinations.
5 page(s)
 Mountain View Power Co/HallSouth Coast Aqmd/Mueller
137592/29/2000Data Adequacy Recommendation
Data Adequacy Recommendation
67 page(s)
 CEC/Keese/moore/laurie/pernellCEC/Smith
136282/16/2000Document Handling for the Mountainview Power Plant Project
Document Handling for the Mountainview Power Plant Project
2 page(s)
 Librarian/Members Of The PublicCEC/Therkelsen
136292/16/2000Request for Agency Participation in the Review of the Mountainview Power Plant Application for Certification.
Request for Agency Participation in the Review of the Mountainview Power Plant Application for Certification.
3 page(s)
 Agency Distribution ListCEC/Therkelsen
136462/16/20001. Letter to Rick York dated 2/11/00 regarding Biological Resource Clarification; and 2. Letter to James Reede dated 2/14/00, regarding Agency Contact Information
1. Letter to Rick York dated 2/11/00 regarding Biological Resource Clarification; and 2. Letter to James Reede dated 2/14/00, regarding Agency Contact Information
13 page(s)
 CEC/ReedeLivington & Mattesich/Varanini
135782/10/2000Air Quality Potential Offsets, Application for Confidentiality
Air Quality Potential Offsets, Application for Confidentiality
4 page(s)
 Livingston & Mattesich/VaraniniCEC/Smith
140792/10/2000Notice of Receipt of the Application for Certification.
Notice of Receipt of the Application for Certification.
3 page(s)
 CEC/DocketCEC/Therkelsen
135392/9/2000Application to the South Coast AQMD for a DOC and a Permit to Construct: Attachment - Binder with 13 attachments and maps.
Application to the South Coast AQMD for a DOC and a Permit to Construct: Attachment - Binder with 13 attachments and maps.
3 page(s)
 CEC/ReedeSierra Research/Tom Andrews
134692/2/2000Air Quality Modeling Files and Topo Maps
Air Quality Modeling Files and Topo Maps
2 page(s)
 CEC/SmithSierra Research/Tom Andrews
134442/1/2000Submittal letter to AFC
Submittal letter to AFC
2 page(s)
 CEC/SmithLivingston & Mattesich/Varanini
134672/1/2000Air Quality Modeling Files (6 copies) and Topo Maps (6 copies) for Mountainview
Air Quality Modeling Files (6 copies) and Topo Maps (6 copies) for Mountainview
2 page(s)
 CEC/SmithSierra Research/Andrews
135162/1/2000Submittal letter to AFC
Submittal letter to AFC
2 page(s)
 CEC/SmithLivingston & Mattesich/Varanini
135172/1/2000Application for Confidential Designation
Application for Confidential Designation
5 page(s)
 CEC/SmithLivingston & Mattesich/Varanini, Iii